MFE Log # TXX-88685 File # 10110
=
r 903.4 Ref. # 100FR50.55(e) 7t# ELECTRIC ggc,c4 September 15, 1988 U. S. Nuclear Regulatory Commission Attn Document Control Desk Washingy.on, D C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 FLOODING CONCERNS SDAR: CP-84-017 (SUPPLEMENTAL REPORT)
Gentlemen:
On August 16, 1984, TV Electric letter TXX-4263 provided notification that the deficiency (e)volving flooding concerns was reportable under the provisions of in 10CFR50.55 The latest report on this issue was TXX-88425, dated May 5, 1988.
This report is submitted to update the corrective action completion schedule.
TXX-88425 indicated that Unit 1 engineering walkdowns to determine interactions with essential equipment, based on revised flood level calculations, would be completed by September 15, 1988.
This activity has been rescheduled for completion by January 4,1989.
All other corrective actions remain as scheduled in TXX-88425.
Very truly yours,
/t/,[,Couwro'd W. G. Counsil By:
J. S. Marshall Generic Licensing Manager CBC/grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)