ML20154K353

From kanterella
Jump to navigation Jump to search
Forwards Vogtle Electric Generating Station Preoperational Radiological Environ Surveillance Rept 1981-84, Per Tech Spec 6.8.1.3.Analysis for 1985-86 Continuing
ML20154K353
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/23/1988
From: Mcdonald R
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154K356 List:
References
SL-4707, NUDOCS 8805310011
Download: ML20154K353 (2)


Text

r-

) Cecq a her Cor"pany 333 P:edmcet A.ena Wit Georga 303C6 Te!ephore 404 526 6%O e 4E45 AN n!a, C+vgo 30302 R. R Mcdonald I'e ststNyn Notre system t reatr<e We Prescent '

'" ' CMS"5 SL-4707 0947m X7GJ17-V520 May 23, 1988 -

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk ,

Washington, D.C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 PRE 0PERATIONAL ENVIRONMENTAL MONITORING REPORT Gentlemen:

Pursuant to T'.chnical Specification 6.8.1.3, Georgia Power Company (GPC) hereby submits a copy of the report of the preoperational Radiological Environmental Monitoring Program for Plant Vogtle for four years prior to initial criticality (i.e., 1981 through 1984). GPC submitted the initial Annual Radiological Environmental Surveillance Report by our letter SL-4567 dated April 29, 1988. As noted in that -

letter, the reports of the preoperational environmental monitoring program and the comparison of that data to the data from the first year of plant operation were not available for submittal at that time. The

> information for the two years immediately preceding plant operation is still not available due to difficulties in analyzing the data. In the  !

1985-1986 period, events (i.e., start-up of Department of Energy's Savannah River "L" reactor, changes in monitoring instrumentation, Chinese atmospheric nuclear weapons tests, and the accident at the Chernobyl power station) complicated the analysis and, thereby, delayed completion. Analysis of the years 1985 and 1986 continues, and a report  :

on the results of that effort will be submitted upon completion.

If you have questions in this regard, please contact this office.

Sincerely ,

O 4V  %

R. P. Mcdonald I

HEB/Im

Enclosure:

Pr3 operational Radiological Environmental Surveillance Report 1981-1984 c: (see next page) 8805310011 8s0523 \\

PDR ADOCK 05000424 R DCD

t, .

Get 'ia Power d U. S.-Nuclear Regulatory Commission May 23. 1988 Page Two c: Georaia Power Comoany Mr. P. D. Rice Mr. G. Bockhold, Jr.

Mr. S. C. Ewald GO-NORMS U. S. Nuclear _ Regulatory Commission Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins,- Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-Operations; Vogtle l

l

)

0947m