Forwards Operator Licensing Retake Exam 50-461/98-301(OL) Conducted on 980831-0904 at Clinton Power Station.Exam Was Administered to One SRO Applicant That Had Failed Feb 1998 Exam.Applicant Passed Exam But Was Not Issued License
ML20154J803
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/09/1998
From: Dapas M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Walter MacFarland
ILLINOIS POWER CO.
Shared Package
ML20154J795 List:
References
50-461-98-301OL, NUDOCS 9810150336
Download: ML20154J803 (3)


See also: IR 05000461/1998301

Text

j _ . . _ . _ ___ _ . _ _ _______._.__._ ___. _ . _ . _

'

,g*

.

.

!

October 9, 1998

Mr. Walter G. MacFarland IV

Senior Vice President

Clinton Power Station

Illinois Power Company

Mail Code V-275

P. O. Box 678

Clinton,IL 61727

L SUBJECT: OPERATOR LICENSING EXAMINATION & INSPECTION REPORT

50-4S1/98301(OL)

Dear Mr. MacFarland:

On September 4,1998, the NRC completed an initial operator licensing retake examination and

a licensed operator requalification program special inspection at your Clinton Power Station.

The license applicant's performance evaluation was finalized on September 21,1998. The

enclosed report presents ths results of the retake examination and specialinspection.

An operating test consisting of control room and in-plant job performance measures was

l administered to one senior reactor operator applicant that had failed the February 1998, initial

license examination. The applicant passed the retake examination but was not issued an

operator license as he had not completed all requirements necessary to be issued the license.

The applicant will be issued a senior reactor operator license when you certify, in writing, to the

l Nuclear Regulatory Commission that all your training program requi:ements and 10 CFR 55

required reactivity manipulations are completed. Your certification should also state that the

l applicant was enrolled in the continuing operator training program and his performance in that

! program was satisfactory.

l The retake examination was your training department's second opportunity to prepare an

i- operator licensing examination under the NRC's operator licensing process as outlined in

l NUREG-1021, " Operator Licensing Examination Standards for Power Reactors," Interim

Revision 8.' This process permitted the preparation of the operating examination by your /

L training staff. The NRC approved and administered the examination. -

/

Licensed operator performance was observed during routine control room activities and

during the administration of an annual operating test to one operating crew. During the

control room observation,' licensed operators executed their dutbs in a professional

manner and were knowledgeable of existing plant conditions. However, when implementing

,

emergency operating procedures during the annual operating examination, licensed

I' operator performance was not always correct and resulted in examination failures.

I Since the completion of this inspection period, a significant number of crew and

individual examination failures have occurred (4 of 7 crews and 21 of 60 licensed

3

operators).- Several examination failures were attributed to the operators' failure to

i correctly implement emergency operating procedure steps and enforce command and control

.

"

'

-

9810150336 981013

' PDR ADOCK 05000461

V PDR 3 g

,

, ,~. , ,,. . -- . - - - - - -

. . . _ . - .- -- _ - - - - - . - . . . __ _ . .- ._

. .

.

.

W. MacFarland 2

activities in the crews. During the January / February 1998, initiallicensed operator examination,

examiners determined that initial license applicants were incorrectly executing emergenQ

operating implementation procedures. Taken in aggregate, this is indicative of a problem in your

training program's implementation for licensed operators. We understand that you have begun

a root cause investigation into the requalification examination faHures and have entered this

issue into your Plan for Excellence. We also understand that you plan to address those aspects

necessary for operation prior to restart of the unit. We have added the training and evaluation of

licensed operators into the Case Specific Checklist of the Manual Chapter 0350 restart plan.

We will determine those items requiring additional inspection efforts following your determination

of corrective actions.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosures to this letter will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this examination and inspection.

Sincerely

Original Signed by Marc L. Dapas

Marc L. Dapas, Deputy Director

Division of Reactor Projects

l Docket No.: 50-461

License No.: NPF-62

Enclosures: 1. Examination & Inspection Report 50-461/98301(OL)

2. Simulator Fidelity Report

l

cc w/encls 1 & 2: G. Hunger, Station Manager l

R. Phares, Manager, Nuclear Safety

and Performance improvement

J. Sipek, Director - Licensing

N. Schloss, Economist

l Office of the Attorney General

i

G. Stramback, Regulatory Licensing

Services Project Manager

l General Electric Company

l Chairman, DeWitt County Board

l State Liaison Officer

Chairman, Illinois Commerce Commission

J. Hansen, Plant Training Manager

DOCUMENT NAME: G:DRS\CLl98301.WPD

To receive a copy of this document, Indicate in the bar: *C's Copy wmout 6M . ;;;ch T's Copy Wth s%; ._.% ,.;v.se "N" = No copy

OFFICE Rlli . ItJ Rill l# Rill lA Rill lEl

' '

NAME Bailey:Jp PV Leachaftv4 Kozak (fi Dapas(/ M

DATE 10/7/98 10/S/98 10/W/98' ' 10/9/98

l OFFICIAL RECORD COPY

!

. .. . . - _ _ . _ - . _ _ _ . _ . . _ . . _- _ _ -. ..._ _ - . _ . . _ - -

i

r .,a .

l'  !

! . l

l W. MacFarland 3

l

l

Distribution:

Project Mgr., NRR w/encls 1 & 2

J. Caldwell, Rlli w/ encl 1 & 2

C. Pederson, Rlll w/encls 1 & 2

B. Clayton, Rlli w/ene:s 1 & 2

SRI Clinton w/encls 1 & 2

DRP w/encls 1 & 2

TSS w/encls 1 & 2

DRS (2) w/encls 1 & 2

.Rlli PRR w/encls 1 & 2  !

PUBLIC IE-42 w/encls 1 & 2

Docket File w/encls 1 & 2

GREENS

LEO (E-Mail) l

DOCDESK (E-Mail) I

M. Bies, Rlli w/encls  !

!

!

l

!

l

l

I

l

l

I

l-

l l

l

!.

,

-

l

!  :

, -.

.-