ML20154H992
| ML20154H992 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/09/1998 |
| From: | Hopkins J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20154H996 | List: |
| References | |
| NPF-62-A-117 NUDOCS 9810150134 | |
| Download: ML20154H992 (5) | |
Text
-
hW g
i UNITED STATES l
J j
NUCLEAR REGULATORY COMMISSION p**o v g WASHINGTON, D.C. 2006H001 g
Tha U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Illinois Power Company (the licensee), dated i
May 4,1998 as supplemented September 23,1998, complies with the standards I
and requirements of the Atomic Energy Act of 1954, as amended (the Act), and I
the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the j
Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and y
security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:
l l
9810150134 981009 l
PDR ADOCK 05000461 l
P PDR x
l
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
are hereby incorporated into this license. Illinois Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 45 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/
Jon B. Hopkins, enior Project Manager Project Directorate ill-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of lasuance: October 9, 1998 e
I ATTACHMENT TO LICENSE AMENDMENT NO.117 FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
Remove Paoes '
Insert Pages 3.8-44 3.8-45 e
i
?
SVC Protection Systems 3.8.11
-l I
3.8 ELECTRICAL POWER SYSTEMS 3.8.11 Static VAR Compensator (SVC) Protection. Systems
An SVC Protection System consisting of two redundant protection subsystems shall be OPERABLE for each inservice SVC.
APPLICABILITY: Du ing SVC operation ACTIONS
NOTE------------------------------------
Separate Condition entry is allowed for each' SVC Protection System.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One subsystem of an A.1 Restore SVC 30 days
.'. (
SVC Protection System protection subsystem inoperable.
to OPERABLE status.
B.,
Both subsystems of an 8.1 Restore one SVC.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
_SVC Protection System protection subsystem inoperable.
to OPERABLE status.
10.
Required Action and C.1 Open SVC output I hour associated Completion breaker (s) to remove Time not met.
SVC from service.
L CLINTON 3.8 44 Amendment No. 117 4
r~
c.
. ~.... _.
SVC Protection Systems l.
i 3.8.11 l
1 SURVEILLANCE REQUIREMENTS l
SURVEILLANCE FREQUENCY SR 3.8.11.1 For each required SVC Protection System, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l
perform a local, visual check of the SVC system control and status panel to confirm satisfactory operation.
SR 3.8.11.2 Perform a system functional test of each 18 months SVC protection subsystem, including breaker.
actuation.
1 t
l CLINTON 3.8-45 Amendment No. 117 l
_-