o.
JOSEH1 M. FARLEY hUCLEAR PIAtti UNIT 1 NARRATIVE SIMIARY OF OPERATIONS August, 1988 3ere were no unit shutdowns or significant power reductions during the month of August.
%e following major safety-related maintenance was perforyned in the month of August:
- 1. Troubleshmting is continuing on the #9 river water pump and motor high vibration.
- 2. W e IB waste gas compressor was replaced after it seized. %e 1B waste gas compressor manual discharge valve was also reworked.
- 3. Carbon steel studs were replaced with stainless steel studs in the 1A charging pump room cooler heat exchange'.. The heat exchanger was cleaned.
- 4. A body-to-bonnet leak was repaired on valve HV-3226. (Steam supply to the turbine driven auxiliary feedwater pump)
- 5. Miscellaneous corrective and preventive maintenance was perronred on the diesel generators.
i l
I a
l l
i
\\
JYT'(
$8?*E88En8888%c e/(
a
o.
OPERATING DATA REPORT i
DOCKET No.
50-348 DME 9/1/88 COMPLEMD BY D. N. Morey___
'IELEPHONE ~(205)899-5156 OPERATING S'IKIUS Notes
- 1. Unit Name:
Joseph M. rarley - Unit 1
- 2. Reporting Period:
August, 1988
- 1) Cumulative data since
- 3. Licensed %ermal Power (Mt):
2,652 12-1-77, date of 40 Nameplate Rating (Gross We):
860 comercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
852.6
- 7. Maximum Dependable Capacity (Net MWe):
812.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 2 rough 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons for Restrictions, If Any:
N/A
%is Month Yr-to-Date cumulative
- 11. Hours In Reporting Period 744 5,855 94,247
~
- 12. Number Of Ilours Reactor Was Critical 744.0 4,510.7 69,727.4
- 13. Reactor Rt. serve Shutdown Hours 0.lT~
0.0 3,650.0
- 14. Hours Generator on-Line 7 W D-~
4,462.3 68,287.8
- 15. Unit Reserve Shutdown flours 0~0--
0~5-0.0
~
- 16. Gross Thetnol Energy Generated (tMI) 1~,970,025 II7 D6 000 17E979,319 g
3
- 17. Gross Electrical Energy Generated (fMI) 76~D7 8 ' - ~ ~
7, U3,836-- 75~9Dl,374
- 18. Net Electrical Energy Generated (tMI) 604,380 3,528,662 7 2,697,858
- 19. Unit Service Factor f00.0 76 2-72.5
- 20. Unit Availability Factor 100.0 76,2 77 5-
- 21. Unit Capacity ractor (Using MDC Net) 10D '. 0-
~~7T.T 69 T
- 22. Unit Ct.pacity Factor (Using DER Not) 98.0
~~72~7~
67.4
- 23. Unit Forced outage Rate 0.0 '
O.T 9.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration ofE5chT:
,N/A M. If Shut Down At End Of Report Period, Entimated Date of Startup:
N/A M. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALI W 08/06/77
_ 08/09M7 INITIAL ELECI111 CITY 08/20/77
_ 08/18M 7 COMERCIAL OPERATICN 12/0147 12/01/77 Form 2/34
F 1
i i,
DOCKET NO.
50-348 UNIT 1
DATE September 1, 1988 i
COMPLETED BY D. N, Morey
/
i TELEPHONE (205)899-5156 i
MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i 1
813 17 812 2
814 18 811 3
813 19 812 4
814 20 813 5
813 21 813 6
812 22 777 7
813 23 813 4
8 813 24 814 I
9 812 25 815 i
10 812 26 817 l
11 812 27 814 12 811 28 81'I l
1 13 814 29 814 I
i 14 815 30 814 l
15 814 31 816 2
l 16 814 I
1 INSTRUCTIONS i
on this format, list the average daily unit power level in MWe-Not for each day in l
the reporting month, compute to the nearest whole megawatt.
l a
6 1
l Form 13/21 i
7 e a e
UNIT 521LP 0W:S A2D PotiER RELUCTTC33 DOC m 30.
50-348 UNIT EAME J.
M. FARLET - UNIT 1*
^
DATE SEP* EMBER 1, 1983 COMPLETEL ST D.
N.
MORET REPORT MOSTE AUGUST TEI2 PHONE f205i899-5156 l
l l
l l
l METH00 CF l LICENSEE l l
l CAUSE 6 CORRECTIVE l
l l
l l DURATICN l l SHLTf;3C l E7E3T l SYSTEM l CCMPONENT l
ACTION TO l
TOW 3 REAC*CR' l REPORT 4 l CODE l COLE l
PRE 7ENT RECLRRENCE l
130.
l CATE l TTFE l (NCuRSt l REASO3 i I
1 i
I I
I I
I I
1 1
ITauE wERE No uN:T sr: :o.c:2 CR s:cK:rrCA=T power REsuCTrcss DuRrNo TnE Morra or AucusT.
l l
l 1
I i
i i
i i
l i
i i
I I
I i
i i
l I
I 1
1 I
i i
l i
I I
i 1
1 1
I I
I i
1 I
I I
I I
i l
i I
I I
i i
l I
I I
i i
1 1
I i
(
I I
I i
l t
I I
I i
i l
i I
i I
I I
I I
I I
i 1
I i
1 i
i l
1 1
i i
I I
I I
I I
I I
i I
I i
1 1
I I
I I
i i
1 I
I I
i I
i i
l I
i I
i l
i I
I I
I I
1 1
I I
I I
l I
i i
i i
i l
I i
l I
I I
I i
I I
i 1
i i
l i
i l
i i
i i
i l
I 1
1 I
i i
l F: Forced Rossan:
Method:
Ezhabit & Instructions 5: scaeduled A-Epipment Failure (Explaint 1-Manual for Preparation of Data S ~.41ntenance or Test 2-Manual Scran.
Entry Sheets for Laconsee C-Refuellag 3-Autwaatic Scraa.
Event Report (LER) File ( N'JREG-D-Requiato r;- Kest riction 4-other (Explain) 0161)
E-Crerator Tralaing & License Isamanation F-Administratire Exhibit I -Same Source G-c;erational Error (Emplain)
(9/776 s-cther iExplains l
El EtX:518 l
Alabarna Power Cornpany
, 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 352914400 Telephone 2052501837 W. G. Hairston,lil Senior Vice President NWear Operates gg the Sourhorn ekttrC System f
September 12, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Comission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. Tarley Nuclear Plant Unit 1 Monthly Operating Data Report i
Attached are two (2) copies of the August 1988 Monthly Operating Report for Joseph M. Farley Nttelear Plant Unit 1, required by Section 6.9.1.10 of the Technical specifications.
If you have any questions 71 ease advise.
Yours very truly, tt/.g'. %&
W. G. Hairston, III HGH/JGSamab/1.6 l
Attachments xct Dr. J. N. Grace
{