Informs That NRC Sent Notice to Ofc of Fr for Publication Re Proposed Amend to Commission Rule in 10CFR72.Commission Issuing Proposed Rule for Public Comment
ML20154H287
Person / Time
Issue date: 09/10/1998
From: Rathbun D
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Inhofe J, Schaefer D
HOUSE OF REP., ENERGY & COMMERCE, SENATE, ENVIRONMENT & PUBLIC WORKS
References
FRN-63FR49046, RULE-PR-72 CCS, NUDOCS 9810140135
Download: ML20154H287 (2)


Text

._

.__._.-..___~~._.m

~.. _. _. - _ _ _. _... -... _._.

IV.. [%

p

\\

UNITED STATES i

l g

NUCLEAR REGULATORY COMMISSION i

j*

WASHINGTON, D.c. Stees.eem

\\.....

i September 10, 1998 i

The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private i

j Property and Nuclear Safety Committee on Environment and Public Works i

United States Senate j

Washington, DC 20510 i

Dear Mr. Chairman:

The U.S. Nuclear Regulatory Commission (NRC) has sent the Office of the Federal Register, j

for publication, the enclosed proposed amendment to the Commission's rule in 10 CFR Part 72.

The proposed rule, if promulgated, would eliminate the requirement that a report of the i

preoperational testing of an independent spent fuel storage installation or monitored retrievable i

storage installation be submitted to NRC at least 30 days before the receipt of spent fuel or i

high-level radioactive waste. Experience has shown that the NRC staff does not need the j

reportog or the holding period because the staff is on site and evaluates preoperational testing as it occurs.

)

4 l

The Commission is issuing the proposed rule for public comment.

1 Sincerely, i

l m

~

Dennis K. Rathbun, Director Office of Congressional Affairs l

Enclosure:

1.

EndacalBeginist notice i

cc Senator Bob Graham i

6 J

9810140135 980910 PDR PR 72 63FR49046 PDR

,.. ~. -.

t f

  • S -
i umrao STATES g-
j.

NUCLEAR REGULATORY COMMISSION wasHWOTON, D.C. seess emM f

1

....e September 10, 1998 I

The Honorable Dan Schaefer, Chairman Subcommittee on Energy and Power Committee on Commerce United States House of Representatives j

Washington, DC 20515

~

i

Dear Mr. Chairman:

I The U.S. Nuclear Regulatory Commission (NRC) has sent the Office of the Federal Register, for publication, the enclosed proposed amendment to the Commission's rule in 10 CFR Part 72.

l The proposed rule, if promulgated, would eliminate the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to NRC at least 30 days before the receipt of spent fuel or high-level radioactive waste. Experience has shown that the NRC staff does not need the reporting or the holding penod because the staff is on site and evaluates preoperational testing as it occurs.

i The Commission is issuing the proposed rule for public comment.

4 Sincerely, t

.)

fK w

I Dennis K. Rathbun, Director Office of Congressional Affairs I

I

Enclosure:

EndacalBagfalar notice cc: Representative Ralph Hall i

i i

t

)

i i

--.r.

e w

y.

_ ~. _.... _... _. _. _.. _

l.i1 l

6 l

j.

[7590-01-P]

]

i I

i i

NUCLEAR REGULATORY COMMISSION I

10 CFR Part 72.

RIN 3150-AG02 i

i

!~

j Elimination of Reporting Requirement and 30-Day Hold in Loading Spent Fuel After i

Prooperational Testing of independent Spent Fuel Storage or Monitored Retrievable l

l

~ Storage installationa AGENCY: Nuclear Regulatory Commission.

d l

I ACTION: Proposed rule.

SUMMARY

The Nuclear Regulatory Commission (NRC) is amending its regulations to eliminate the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to the NRC at r

least 30 days before the receipt of spent fuel or high-level radioactive waste. Experience has l

shown that the NRC staff does not need the report or the holding period because the NRC staff

~

is on site and evaluates preoperational testing as it occurs. This amendment will eliminate an V

. unnecessary regulatory impact on licensees.

lf

&g W hIb h

\\

DATES: The comment period expires (75 days after publication). Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.

ADDRESSES: Comments may be sent to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff.

Deliver comments to: 11555 Rockville Pike, Maryland, between 7:30 am and 4:15 pm on Federalworkdays.

You may also provide comments via the NRC's interactive rulemaking web site through the NRC home page (http://www.nrc. gov). This site provides the availability to upload comments as files (any format) If your web browser supports that function. For information about the interactive rulemaking site, contact Ms. Carol Gallagher, (301) 4154215; o-mail CAG@nrc. gov.

Certain documents related to this rulemaking, including comments received may be examined at the NRC Public Document Room, 2120 L Street NW (Lower Level), Washington, DC. These same documents also may be viewed and downloaded electronically via the interactive rulemaking website established by NRC for this rulemaking.

FOR FURTHER INFORMATION CONTACT: Gordon Gundersen, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone (301) 4154195, e-mail gegi @nrc. gov.

2

. _ c.

SUPPLEMENTARY INFORMATION:

===.

Background===

Part 72 requires that the Safety Analysis Report (SAR) accompanying an application for a site-specific license ($ 72.24(g)) and the application for the approval of a spent fuel storage cask ($ 72.236(l)) contain information on the performance of preoperational testing by the site-specific licensee or the general licensee, respectively. The licensee is required to complete the preoperational testing program described in the applicable SAR before spent fuel is loaded into an independent spent fuel storage installation (ISFSI) or before spent fuel or high-level radioactive waste (HLW) is loaded into a monitored retrievable storage installation (MRS).

10 CFR 72.82(e) requires licensees to submit to the NRC a report of the preoperational test acceptance criteria and test results at least 30 days before the receipt of spent fuel or HLW for loading into an ISFSI or MRS. However, the licensee is not required to submit test procedures, but only a report of the test results. A copy inis report is subsequently placed in the NRC Public Document Room (PDR). The purpose of the 30-day period is to establish a hold point to allow NRC to review a new licensee's preparations and, if necessary, exercise its regulatory authority before spent fuel is received at an ISFSI or spent fuel and HLW at an MRS.

The licensee is not required to obtain NRC approval of the report before commencing loading operations.

3

l*,

Discussion The requirement for' a preoperational test report and 30-day hold period was added to j

the Part 72 regulations governing licensing requirements for ISFSis and an MRS at the time l

they became effective on November 28,1980 (45 FR 74693), and before the NRC staff had any practical experience in licensing such facilities. However, in the intervening period, the Commission's practice has been for NRC staff to maintain an extensive oversight presence i

during the preoperational testing phase of ISFSis, reviewing the acceptance criteria, J

l preoperational test, and test results as they occur. Thus, NRC staff has had immediate access i

to the licensee's procedures and test results and has not needed either a preoperational test l

report or a 30-day hold period in order to complete its inspection activities and determine whether any further regulatory action is needed before the licensee begins to load spent fuel or HLW.

i The NRC inspection program now in place (i.e., inspection Manual Chapter 2690 and Inspechon Procedures 60854 and 60855) ensures that the NRC staff will review the licensee's normal, abnormal, and emergency operating procedures,(including loading and unloading l

l procedures), as well as observe implementation of those procedures during preoperational testing. Consequently, NRC staff is in a position to ensure that the licensee has resolved any j

i problems before loading spent fuel into the ISFSt. NRC staff documents the results of the inspechon of the preoperational test program in a written inspection report, which is placed in the PDR This report contains conclusions on whether the licensee has adequately completed l

1 4

l 1.

the preoperational test program, an assessment of the licensee's performance in completing the preoperational test program, and an assessment of the licensee's readiness to begin loading spent fuel or HLW.

Notwithstanding that this regulation ensures that the NRC will be notified by the licensee before it begins loading spent fuel, other regulations and processes provide adequate assurance that the NRC will be aware of a licensee's anticipated loading activities. For ISFSis at operating reactor sites, the Commission expects that on-site NRC resident inspector staff would be aware of any potential fuelloading activities. Additionally, generallicensees are required by 6 72.212(b)(1)(l) to notify the NRC at least 90 days before spent fuel loading begins. For site-specific licensees, the fact that a license has been issued serves as adequate notice to the NRC that spent fuel loading activities are planned. Further, site-specific licensees i.

are also required by 9 72.70(a) to submit a final safety analysis report to the Commission at I

least 90 days before spent fuelloading begins.

The public will retain the ability to review a description of the preoperational tests and their acceptance criteria because such information is contained in the SAR, which is available for review in the NRC PDR. Relevant information on the preoperational test program and the results of the preoperational test program both will remain available for public review in the SAR and the inspection report, respectively.

The NRC staff's experience has also been that the 30-day hold established by 6 72.82(e) creates a potentially significant financial burden for licensees because, during the 30-day period, the licensee can perform no loading activities even though the licensee is ready f

5 l

l

.q__

to load spent fuel or HLW. This has resulted in several requests for exemptions by licensees i

and the need for the NRC staff to expend time processing these requests. The elimination of l

this regulation would preclude the need for exemption requests and would enable the licensee to use the crew assembled for fuel transfer while the lessons of preoperational testing are fresh l.

in their minds and will contribute to the efficiency of operations by avoiding unnecessary idle time. The NRC staff observers of spent fuelloading will similarly benefit.

I Therefore, the Commission proposes to remove 10 CFR 72.82(e) from NRC's i.

regulations because it believes neither the report nor the 30-day hold period are needed for regulatory purposes and taking this action will relieve licensees from an unnecessary regulatory burden. While elimination of this reporting requirement will also remove a piece ofinformation which was available to the public, the altemative sources of information available to the public on preoperational test activities adequately recount the licensee's performance of l

preoperational testing.

I~

Environmental Impact: Categorical Exclusion The NRC has determined that this proposed rule is the type of action described as a categorical exclusion in 10 CFR 51.22(c)(3)(iii). Therefore, neither an environmentalimpact statement nor an environmental assessment has been prepared for this proposed rule.

l l

i P

6 L

i

Paperwork Reduction Act Statement This proposed rule decreases the burden on licensees by eliminating the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to the NRC at least 30 days before receipt of spent fuel or high-level radioactive waste,10 CFR 72.82(e). The public burden reduction for this information collection is estimated to average 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per response.

Because the burden for this information collection is insignificant, Office of Management and Budget clearance is not required. Existing requirements were approved by the Office of Management and Budget, approval number 3150-0132.

Public Protection Notification if an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

Regulatory Analysis The proposed amendment would eliminate the requirement that 10 CFR Part 72 licensees submit a report of the preoperational test acceptance criteria and test results at least 30 days before the receipt of spent fuel or HLW on the grounds that NRC's inspection program ensures that the NRC staff will be present for observance of preoperational testing and will be in a position to ensure that a licensee is prepared to safely load spent fuel or HLW Thus the 7

i.

report and the 30-day hold period are not needed for NRC's regulatory activities.

The benefit of the proposed rule is that elimination of a report and 30-day hold period not needed by the NRC would reduce an unnecessary regulatory impact on licensees resulting from the 30-day waiting period following submittal of a report of the preoperational test criteria and test results to the NRC. During this period, the licensees can perform no loading activities even though the licensee is ready to load spent fuel or HLW. This could impose a potentially significant financial burden on licensees. The rule would also relieve both licensees and the NRC staff from the need to process exemption requests. The Commission has received and approved several requests for exemption frc.n f 72.82(e) and envisions that most future Part 72 licensees would also apply for exemption " rom this regulation. An impact of the proposed rule would be that a report of the preoperationsi test criteria and test results will no longer be available. However, NRC inspection reports will cantain NRC findings on the preoperational testing and assessments on the licensee's readiness to commence loading spent fuel. These inspection reports will be available in the NRC Public Document Room system. The NRC also considered the alternative of shortening rather than eliminating the hold period but rejected this attemative because it would still retain a requirement not needed for regulatory purposes and thus, would still impose an unnecessary regulatory burden on licensees.

Regulatory Flexibility Certification in accordance with the Regulatory Flexibility Act of 1980 as amended 5 U.S.C. 605(b),

the Commission certifies that this proposed rule will not, if adopted, have a significant economic impact on a substantial number of small entities. This proposed rule would affect only the 8

L operators of ISFSis. These companies do not fall within ti1e scope of the definition of 'small 3

entibes" set forth in the Regulatory Flexibility Act or the Small Business Size Standards set out in regulations issued by the Small Business Administration at 13 CFR Part 121.

Backfit Analysis 1

The NRC has determined that the backfit rule,10 CFR 72.62, does not apply to this rule, because this amendment does not involve any provisions that would impose backfds as defined in 10 CFR 72.62(a). Therefore, a backfit analysis is not required for this proposed rule.

Criminal Penalties For the purpose of Section 223.of the Atomic Energy Act (AEA), the Commission is issuing the proposed rule to amend 10 CFR 72.82, under one or more of $$ 161b,1611, or 161o of the AEA. Willful violations of this rule would be subject to criminal enforcement.

Compatibility of Agreement State Regulations l

Under the " Policy Statement on Adequacy and Compatibility of Agreement State Programs," approved by the Commission on June 30,1997, and published in the Federal Registar (62 FR 46517, September 3,1997), this rule is classified as compatibility Category "NRC." Compatibility is not required for Category "NRC" regulations. The NRC program i

. elements in this category are those that relate directly to areas of regulation reserved to the

[.

NRC by the AEA, or the provisions of Title 10 of the Code of Federal Regulations. Although an 9

j i

l

M i

Agreement State may not adopt program elements reserved to NRC, it may wish to inform its licen. sees of cerisin requirements, via a mechanism that is consistent with the particular State's administrative procedure laws, but does not confer regulatory authority on the State.

l List of Subjects in 10 CFR Part 72 i

l Criminal penalties, Manpower training programs, Nuclear materials, Occupational safety and health, Reporting and recordkeeping requirements, Security measures, Spent fuel.

For the reasons set out in the preamble and under the authority of the Atomic Energy I-Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C.

553; the NRC is proposing to adopt the following amendment to 10 CFR Part 72.

I e

PART 72-LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF i

SPENT NUCLEAR FUEL AND HIGH-LEVEL RADIOACTIVE WASTE

[.

1

1. The authority citation for Part 72 continues to read as follows:

AUTHORITY: Secs. 51,53,57,62,63,65,69,81,161,182,183,184,186,187,189, 68 Stat. 929, 930, 932, 933, 934, 935, 948, 953, 954, 955, as amended, sec. 234, 83 Stat.

444, as amended (42 U.S.C. 2071,2073,2077,2092,2093,2095,2099,2111,2201,2232, l

2233,2234,2236,2237,2238,2282); secs. 274, Pub. L.86-373,73 Stat. 688, as amended (42 U.S.C. 2021); sec. 201, as amended,202,206, 88 Stat.1242, as amended 1244,1246 (42 U.S.C. 5841, 5842, 5846); Pub. L.95-601, sec.10, 92, Stat. 2951 as amended by Pub. L.102-i 486, sec. 7902,106 Stat. 3123 (42 U.S.C. 5851); sec.102, Pub. L.91-190, 83 Stat. 853 (42 10 I

U.S.C. 4332); secs.131,132,133,135,137,141, Pub. L.97-425, 96 Stat. 2229, 2230,2232, i

c 2241, sec.148, Pub. L.100-203,101 Stat.1330-235 (42 U.S.C.10151,10152,10153,10155, 10157,10161,10168).

Section 72.44(g) also issued under sec.142 (b) and 148 (c), (d), Pub. L. 100-203,101 Stat.1330-232,1330-236 (42 U.S.C.10162 (b),10168 (c), (d)). Section 72.46 also issued under sec.189, 68 Stat. 955 (42 U.S.C. 2239), sec.134, Pub. L.97-425, 96 Stat. 2230 (42 U.S.C.10154). Section 72.96(d) also issued under sec.145(g), Pub. L 100-203,101 Stat.

i 1330-235 (42 U.S.C.10165(g)). Subpart J also issued under secs. 2(2),2(15),2(19),117(a),

141(h), Pub. L.97-425, 96 Stat. 2202, 2203, 2204, 2222, 2224 (42 U.S.C.10101,10137(a),

10161(h)). Subparts K and L are also issued under sec.133, 98 Stat. 2230 (42 U.S.C.10153) and sec. 218(a), Stat. 2252 (42 U.S.C.10198).

11

l

$ 72.82 (Amended)

2. 'Section 72.82 is amended by removing paragraph (e).

1 Dated at Rockville, Maryland this NIIday of a

998.

1 For the Nuclear Regulatory Commission.

I L. Jose

Callan, Executive Director for Operations.

I t

i l

12

. - - = - -

CONGRESSIONAL CORRESPONDENG SYsinM DOCUMENT PREPARATION GECH2ST a

l This check list is to be submitted with each doannent (or group of Qs/As) sentforprocessi into the CCT. -

1. BitIEF DESCRIPTION OF DOCUMENT (5)

A, N

2. TYPE OFDOCUMENT X CORRESPONDENT REARING 5 (QdAs)

{

3. DOCUMENT CONIROL __ SENSITIVE (NRC ONLY)

X NON-SENSITWE l

4.

CONGRESSIONAL COMMITTEE AND SUBCOMMITIEE ((fapplicable)

Congressional Canmittee Subcommittee 1

5, SUBIECTCODES l

(A) l l

(B)

(C) 6, SOURG OFDOCUMENTS (A) 5520 (DOCUMENT NAME

)

1 (B)

SC4N (C)

ATTAGMENTS (D)

OTHER l

7. SYSTEM (9/9ADATA OC4 SENTDOCUMENT TO CCS l0/ qGDATES (A)

(B)

DATE CCS RECETVED DOCUMENT (C)

DATE RETURNED TO OC4 FOR ADDITIONAL INFORMATION (D)

DATE RESUBMITTED BY OC4 TO CCS (E)

DATE ENTERED INTO CCS BY l

(F)

DATE OC4 NOTIFIED THATDOCUMENT15IN CCS COMMENTS:

1 RELEASE TO PDR 2,,'e-o

~~'