Forwards Insp Repts 50-456/98-12 & 50-457/98-12 on 980728- 0908.No Violations Were Identified.One non-cited Violation Identified Re One Occasion for 42 No Senior Reactor Operator Present in Control Room
ML20154H264
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/05/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20154H267 List:
References
50-456-98-12, 50-457-98-12, NUDOCS 9810140126
Download: ML20154H264 (4)


See also: IR 05000456/1998012

Text

..

. . . . . - - . .-

~ . . - - . , ,-

-..

. ~ .

. - - ~ . . . . . - . ~ ~ . . . . . . . . . ~ - . _ . .

. . . -

6

'*

uarug'o, .

NUCLEAR REGULATORY COMMISSION

UNITED STATES

i

[

Y

'

REGloN iil

-

-

{

y

801 WARRENVILLE ROAD

e

LISLE. ILLINOIS 60532-4351

-

- S,.

.

October 5, 1998

!

.j

Mr. Oliver D. Kingsley_

!

'

President, Nuclear Generation Group

Commonwealth Edison Company

j

ATTN: Regulatory Services

Executive Towers West lli

i

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT:

BRAIDWOOD INSPECTION REPORT 50-456/98012(DRP);

50-457/98012(DRP)

Dear Mr. Kingsley:

On September 8,1998, the NRC completed an inspection at your Braidwood Units 1 and 2

reactor facilities. The enclosed report presents the results of that inspection. _ During the

six-week period covered by this inspection period, your conduct of activities was generally

i

characterized by safety-conscious operations, sound engineering and maintenance practices,

and careful radiological protectiun controls,

i

!

One non-cited violation is discussed in this report. This violation addresses your identification

I

that on one occasion for 42 seconds no senior reactor operator was present in the control

room with both units in operation which is a failure to meet Technical Specification manning

requirements.

Several material condition problems directly affected plant operations during this inspection

period. Most failures involved nonsafety-related equipment but occurred during evolutions

such as a feedwater pump swap, reactor shutdown, and a loss of offsite power. These

equipment failures did not have a profound impact but did complicate the evolutions.

\\

j

"

9810140126 981005

PDR

ADOCK 05000456

G

PM

,

.

_ _ _ _

_

.

._

.-,

._

-

.

. . _ .

_ _ . . . _ .

..

.

'

O

'

i

O. Kingsley

-2-

.

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

0

.Dr f. af

G

ffre E. Gra

Dire

Division of Reactor Projects

Docket Nos.: 50-456; 50-457

l

License Nos.: NPF-72; NPF-77

Enclosure:

Inspection Report 50-456/98012(DRP);

50-457/98012(DRP)

.

cc w/ encl:

M. Wallace, Senior Vice President

l

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory Services Manager

1. Johnson, Licensing Director

'

DCD - Licensing

'

T. Tulon, Site Vice President

i

K. Schwartz, Station Manager

T. Sirqpkin, Regulatory Assurance Supervisor

R. Hubbard, MHB Technical Associates

N. Schloss, Economist .

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

i

l

l

!

.

.-.

.

.

-

.-

-

.

O. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-456;50-457

License Nos.: NPF-72; NPF-77

Enclosure:

Inspection Report 50-456/98012(DRP);

50-457/98012(DRP)

,

cc w/ encl:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory Services Manager

1. Johnson, Licensing Director

DCD - Licensing

T. Tulon, G' Vice President

)

a

K. Schwartz, Station Manager

T. Simpkin, Regulatory Assurance Supervisor

q

R. Hubbard, MHB Technical Associates

i

N. Schloss, Economist

'

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

-

DOCUMENT NAME: G\\ BRA \\ BRA 98012.drp

To seceive e copy of this docurnent, Indicate in the box "C" = Copy without ettechment/ enclosure *E* = Copy with attachment / enclosure

  • N* = No copy

OFFICE

Rlli

lE

Rlli

f

Rlli

Rlli

l

.,

NAME

Tongue:nhc d

Jordan 411%

Grant Cf 4

()$(/dS)~l[

DATE

09/10/98

09/P/98

09/ /98

OFFICIAL RECORD COPY

_

_ . . .

_ _ .

_ _ ._.

. . _ - _ _

_ . . _ _ _ _ _

_ .

_ _ . . _

_ . . - . _ . _

_

...

. *

-

O. Kingsley

-3-

Distribution:

SAR (E-Mail) -

i

Project Mgr., NRR w/end

1

J. Caldwell, Rlli w/end

C. Pederson, Rlli w/ encl

B. Clayton, Rill w/enci

SRI Braidwood w/end

. DRP w/enci

TSS w/enci

DRS (2) w/enct

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

]

IEO (E-Mail)

DOCDESK (E-Mail)

.

i

.

f

4

14C003

.

I

l

!-

i.

l