Responds to Generic Ltr 88-03 Re Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps. Procedures Established to Monitor Fluid Conditions within Auxiliary Feedwater Sys,Per NRC Bulletin 88-001
ML20154H192
Person / Time
Site: Prairie Island, 05000386  Xcel Energy icon.png
Issue date: 05/13/1988
From: Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR GL-88-03, GL-88-3, IEB-88-001, IEB-88-1, NUDOCS 8805250258
Download: ML20154H192 (2)


Text

,

, W e

  • Northern States Power Company 414 Nicone t Mall Minneapohs, Minnesota 55401 Telepho 9 (612) 330 5500 May 13, 1988 Geticric Letter 88-03 Director of Nuclenr Reactor Regulation U S Nuclear Regulatory Commission Attn: Document Control Desk k'a shington , DC 20555 PRAIRIE ISIRiD NUCLEAR GENERATING PIRIT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps The purpose of this letter is to respond to NRC Generic Letter 88 03 for the Prairie Island Nuclear Generating Plant.

In response to NRC IE Bulletin 85-01, procedures were established to monitor fluid conditions within the auxiliary feedwater system and ensure that fluid temperature at the discharge of the pumps is main-tained at about a.abient conditions. Procedures to require monitoring at least once per shift will be maintained in effect. In response to NRC IE Bulletin 85 01, procedures were also established to recognize steam binding if it would occur and for restoring the auxiliary feed-water system to operable status. These procedures will be maintained in ef fect.

The general matter of reliability of check valves is being addressed by Northern States Power Company and the nuclear utility industry.

The Electric Power Research Institute (EPRI) has recently completed a comprehensive asialysis of check valve applications, limitations, and inspection techniques. The EPRI work was prompted by an Institute of Nuclear Power Operations (INPO) finding that misapplication and in-adequate preventive maintenance are the primary causes of check valve failure. Improved maintenance and testing will help prevent any in-crease in check valve failures due to plant age. Please contact us if you have any questions related to the information we have provided, j Me n David Musolf Manager Nuclear Support Services c: Regional Administrator, Region III, NRC NRC Sr Resident Inspector NRC Proj ect Manager ,

G Charnoff (p )  !

I i 8805250258 880513 PDR ADOCK 05000282 i g DCD

a r

UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISIAND NUCLEAR GENERATING PIANT DOCKET NOS. 50-282 50 306 RESPONSE TO GENERIC LETTER 88-03 RESOLUTION OF GENERIC SAFETY ISSUE 93, "STEAM BINDING OF AUXILIARYFEEDWATER PUMPS" Northern States Power Company, a Minnesota corporation, hereby submits information in response to Generic Letter 88-03.,

This submittal contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By .' SL bm David Musolf T Manager Nuclear Support Services On this b (3 eay of OhA 19FFbefore me a notary public inandforsaidCounty,pejsonallyappearedDavidMusolf,Manag-er Nuclear Support Services, and being first duly sworn acknowl-edged that he is authorized to exec'tte this document on behalf of Northern States Power Company, that he knows the contents there-of, and that to the best of his knowledge, information, and be-lief the statements made in it are true and that it is not inter-posed for delay.