ML20154H180

From kanterella
Jump to navigation Jump to search
Forwards Bg&E Answer to Petitioner Motion to Vacate & Reschedule pre-hearing Conference,Bg&E Answer to Motion Requesting to Be Informed of Communication Between NRC & Applicant & Bg&E Answer to Notice of Filing
ML20154H180
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/09/1998
From: Doris Lewis
BALTIMORE GAS & ELECTRIC CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Bollwerk G, Kline J, Murphy T
Atomic Safety and Licensing Board Panel
Shared Package
ML20154H184 List:
References
CON-#498-19631 98-749-01-LR, 98-749-1-LR, LR, NUDOCS 9810140097
Download: ML20154H180 (1)


Text

.

_. ~

3/

SHAW PITTMAN OCKETED

--.cu--omm USHRC D00 N street. N.W. '

Washington. D.C 20037 1128 202 a t o m W DCT 13 P3 :34 Facsimde 202.663.8007 DAVID R. LEWIS gg 4

a.vidJe.i!N."p[ccm.a.com MU @ @T '

.0.1 V-@

October 9,1998 RULEM4 X Jo ADJUDNOM MAFF G. Paul Bollwerk, III, Chairman Dr. Jerry R. Kline Thomas D. Murphy Atomic Safety and Licensing Board i

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of Baltimore Gas and Electric Company (Calvert Cliffs Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-317-LR & 50-318-LR: ASLBP No. 98-749-01-LR i-

[

' Gentlemen:

Enclosed please find BGE's Answer to Petitioner's Motion to Vacate and Reschedule the Pre-Hearing Conference, BGE's Answer to Petitioner's Motion Requesting to be Informed of Communication Between the NRC Staff and Applicant, and BGE's Answer to Petitioner's Notice of Filing. BGE is not responding to the National Whistleblower Center's " Status-Report," because NWC specifically states that the status report does not represent contentions and does not provide any basis for contentions. _S. eg Status Report at 2,10.

e I

Sincerely, c)c-David R. Lewis l

Counsel for BGE L

L Enclosures cc: Service List (w/ enclosures)

Document #: 653964 v.I i

)

9810140097 981009 t g@1 PDR ADOCK 05000317

/

4 PDR 0

1

-