Requests Relief from ASME Code Section XI Requirements for Extension Until 881101 to Submit Form NIS-2 Summary Rept After Completion of Outage.Fee Paid
ML20154H122
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/15/1988
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809210183
Download: ML20154H122 (3)


Text

.

BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE MARYLAND 21203 CHARLES H. CRUSE Wak&GER 8euC(tam tuomittmNG StaMCES DEP&AtutNT September 15, 1988 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk l

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50-317 l

Reauest for Relief from ASME Code Section XI Reauirements l

REFERENCE:

(a) NRC Staff Guidance Letter on ASME Relief Requests, dated November 24,1976 Gentlemen:

In accordance with 10 CFR 50.55a(g)(/)(i), we are requesting schedule relief from an ASME Code Section XI requirement. The information concerning this relief request is presented herein as required by Reference (a).

The submittal of an Owner's Report for Repairs or Replacements, Form NIS-2, with the

{

Inservice Inspection Summary Report, required within 90 days following the outage, is impractical. We request an extension to the submittal of 30 days, to November 1, 1988, for Form NIS-2 only. The remaining information required to be with the Summary Report by ASME Code Section XI IWA-6230 will be submitted within 90 days following the outage.

I.

Comoonents for Which Relief is Reauested Relief is not requested from any component inspection, evaluation or examination. Ilowever, IWA-6220(b)' 0) requires a Form NIS-2 in the Summary Report. We are requesting to delay by 30 days the submittal of that form. All other requirements of IWA-6220/6230 will be met on time.

II.

ASME Reauirement from Whwh Reller is Reauested ASME Code Section XI 1983 edition with Addenda through summer 1983, paragraph IWA-6230, requires submitting a Summary Report (as defined in IWA-6220) 90 days after the completion of an outage. This Summary Report is currently due October 2,1988. We are requesting an additional 30 days to prepare and submithog 7 Form NIS-2.

)r a

g921ote38G0915 g.fc,kCFYl#

ADOCK0500g7 gjyjg%

p

1 i

c Document Control Desk September. I S, 198n Page 2 III.

Basis for Relief We recently started our second 10-year-interval Inservice Inspection Program.

In accordance with 10 CFR 50.55a, we uppaded to ASME Code Section XI 1983 edition with Addenda through summer 1983. Because of this, we implemented many new requirements, including a Rcpair and Rephcea)ent Program.

We are now required to prepare and submit within 90 days a Form NIS-2 with our Summary Report, a form which we have never prepared before. Because of the large magnitude of the job nf completing this form, including allowing adequate time for reviews of the great number of jobs performed and resolving concerns, it will not now be possible to meet the October 2, 1988 deadline. Therefore, the IWA-6230 requirement to submit Form NIS-2 within 90 days is deemed impractical for this occasion.

Without a 30-day extension fer submitting Form NIS-2, we cantet comr'ly with our applicable ASME Code Section XI requ;rements.

IV.

Alternative Testinn Due to the nature of our relief request, no alternate testing will be proposed.

However, we agree to submit, no later than November 1,1988, the completed Form NIS-2.

This relief is requested prior to October 2,1988, which is when the Summary Report is currently due.

Pursuant to 10 CFR 170.21 we are including BG&E Check No. 1918244 to the NRC in the amount of $150.00 to cover the fee for this request.

Should you have any further questions regarding this request, we will be pleased to discuss them with you Very truly yours,

/.1 Yf ^

CllC/DLS/dlm Attachment I

l

1

' Document Control Desk September 15, 1988 Page 3 cc:

D. A. Drune, Esquire J. E.

Silberg, Esquire R. A.Capra, NRC S. A.McNeil, NRC W. T. Russell, NRC D. C. Trimble, NRC T. Magette, DNR 4