ML20154H076

From kanterella
Jump to navigation Jump to search
Submits Annual Rept of Failures & Challenges to PORVs & Safety Valves for Period Apr 1980 - Dec 1982,per Tech Spec 6.9.1.5.c
ML20154H076
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/19/1988
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809210165
Download: ML20154H076 (2)


Text

I

.q DALTIMORE l

i GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475

l LEON B RUSSELL w...

CAL 414T Cistfl esVCL&&A #Cnt. PLA%T C4P&ATW4%T l

September 19, 1988 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Annual Report of Failures and Challenges to PORVs and Safety Valves for the Period of Acril 1.1980 throuah December 31. 1932

REFERENCES:

(a) Reply to NRC Inspection Report Nos. 50-317/88-07; $0-318/88-08, i

dated July 14, 1988.

Gentlemen:

The documentation of all feitures and challenges to pressurizer PORVs or safety valves for the period of April I, 1980 throu8h December 31, 1982 follows. This report is required by Technical Specification 6.9 l.5.c and reference (a),

1) On October 18, 1980, two pressurizer code safety valves' lift setpoints were found above the maximum setpoint during surveillance testing. This event is described in LER 50-317/80-60.
2) On January 18, 1981, a pressurizer PORY opened when a pressure

]

l trans.nitter failed. This event is described in LER 50-318/81-05.

l I

l

3) On March 1,1981, a pressurirer PORY was isolated when it was determined i

to leak. The valve seated properly when system pressure was raised, i

This event is described in LER 50-318/81-10.

i

4) On June 13, 1981, the pipe fittings immediately upstream of the Unit !

l and 2 pressurizer code safety vahes were determined to hase improperly sized inside diameters. This event is described in LER 50-317/81-42; 50-318/81-28.

i l

8809210165 880919 f

PDR ADOCK 0500 7

5 R

)

i l

\\

l a

.[ ?.

l l

Document Control Desk l

  • September 19, 1988 1-Page 2 i

I

5) On July 16, 1981, a pressurizer PORY opened on an erroneous high pressure signal when a pressure transmitter was bumped. This event is described in LER 50-317/81-56.

Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, l

l l

//

l wual c,.

t L DR/JMO/sjb Attachment cc:

D, A. Brune, Esquire J. E.

Silberg, Esquire R. A.Capra.NRC i

S. A.McNeil,NRC W. T. Russell, NRC i

D. C. Trimble/V. L. Pritchett, NRC T. Magette. DNR j

i l

i 1

l

-