Forwards Updated FSAR for Beaver Valley Power Station.Fsar QA Program Description Revised to Reflect Changes in Util Mgt Structure & Current QA Unit Practices.W/O Encl
ML20154G571
Person / Time
Site: Beaver Valley
Issue date: 04/29/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805240429
Download: ML20154G571 (1)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

.1, e

'Af Duquesne Lidit 1.~n-

=:

April 29, 1988 Shppwjpod. PA 15077-0004 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 2

-Docket No. 50-412, License No. NPF-73 Updated Final Safety Analysis Report Gentlemen:

A signed original and ten (10) copies of the Beaver Valley Power

-Station, Unit No. 2 Updated Final Safety Analysis Report (FSAR) have been forwarded in accordance with 10 CFR 50.71(e).

Additional copies are being provided to the Region I office and Resident Inspector.

To our best judgement and

ability, this revision accurately presents changes necessary to reflect information and analyses submitted to the commission or prepared pursuant to Commission requirements.

This includes changes identified in the most recent "Report of Facility

Changes, Tests and Experiments" which is L

cubmitted under the provisions of 10 CFR 50.59.

All changes in this

revision, which are subject

,C CFR 50.59, were included in that submittal.

Editorial changes i. ended to correct or clarify the text of the Updated FSAR are also included in this revision.

The Final Safety Analysis Report Quality Assurance Program l

description (FSAR, Appendix A) has been revised to reflect changes in i

Duquesne Light company's management structure and to reflect current Quality Assurance Unit practices.

These changes have been reviewed against the requirements of 10 CFR 50.54(a)(3) and it has been determined that the changes do not reduce the commitments in the QA previously cecepted by the NRC.

In addition, description program Operations QA Program is common to both BVPS-1 and BVPS-2, the sinceBVPS-2 program description has been supplemented with information i

the The BVPS-1 UFSAR will later be revised to BVPS-1 UFSAR.

from thethe redundant material and will incorporate the BVPS-2 program delete description by reference, Very truly yours, f

f 0A,M f w.

~-

ors D.' Sieber MU i

}p A @ h N'

,O Vice President g

Nuclear Group

$gpg/gp/g I

Mr. J. Beall, Sr. Resident Inspector cc:

Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Project Manager 0805240429 880429 PDR ADOCK 05000412 D.

RtB