Responds to NRC Bulletin 88-005, Nonconforming Matl Supplied by Piping Supplies Inc at Folsom,Nj & West Jersey Mfg Co at Williamstown,N.J. Eleven Nonconforming Flanges Tested & Judged Suitable for Intended Svc
ML20154G459
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/09/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-005, IEB-88-5, NUDOCS 8809200370
Download: ML20154G459 (4)


Text

e C

TOLEDO

% EDISON A Camwor (wp Cygwg DONALD C. SHELTON

w. wmma (419] E49 2300 Docket No. 50-346 License No. NPF-3 Serial No. 1-825 September 9, 1988 United States tiuclear Regulatory Commission Document Centrol Desk Vashington, D. C.

20555

Subject:

Response to NRC Bulletin 88-05 Dear Sir On May 6, 1988, the NRC issued NRC Bulletin 88-05 (Log No. 1-1804)

"Nonconforming Haterial Supplied by Piping Supplies Inc. (PSI), at Folsom, New Jersey and Vest Jersey Manufacturing Company (VJM) at Villiamstovn, j

New Jersey." Supplements 1 and 2 to NRC Bulletin 88-05 vere issued on June 15, 1988, and August 3, 1988, respectively.

The bulletin required licensees to submit information regarding "fittings end flanges" supplied by PSI or VJH and requested the licensee to (1) take action to assure that "fittings and flanges" comply with ASHE code and design specification requirements or are suitable for their intended service; or (2) replace such material.

Toledo Edison (TE) identified 279 flanges (in safety and non-safety related j

systems) that vere supplied by VJH or PSI through a review of purchase orders I

and varehouse inventory, and valkdowns of plant systems. None of the "Safety-Related" flanges tested, vere outside established acceptance criteria.

Ilovever, eleven (11) "Non-Safety-Related" flanges vere outside the established acceptance criteria. Toledo Edison reported the nonconformances, evaluated those flanges, and concluded that they are suitable for their intended service. Upon issuance of Bulletin 88-05 Supplement 2, TE suspended its field testing program for the flanges.

8809200370 880909 PDR ADOCK 05000346 0

q PDC THE TOLEDO EDSON COMPN 4Y EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHtO 43G52

\\

e Docket No. 50-346 License No. NPF-3 Serial No. 1-825 Page 2 The attachment provide Toledo Edison response to Bulletin 88-05 for Davis-Besse Nuclear Power Station Unit 1.

If you have any questions contact Mr. R. V. Schrauder, Nuclear Licensing Manager, at (419) 249-2366.

Very truly yours, GAB / tit Attachment cc DB-1 Resident Inspector A. B. Davis, Regional Administrator A. V. DeAgazio, NRC/NRC DB-1 Project Manager N

I 1

a

RESPONSE TO HRC BULLETIN 88-05 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 This letter is submitted in conformance with the Atomic Energy Act of 1954 Section 182a, in response to NRC Bulletin 88-05, "Nonconforming Materials Supplied by Piping Supplies, Inc. at Folsom, New Jersey and Vest Jersey Manufacturing Company at Villiamstown, New Jersey."

Fort D. C. Shelton, Vice President, Nuclear By:

T. J.

ers Technical Services Director Svorn and subscribed before me this 915 day of Septembar, 1988, ANY

  1. C J

N hry Public, State of Ohio

~~

JUDITH HIRSCH Notary Putse State of ONo My C8mm4MH tvNFH 30N4 30; 1992

Dock 0t N3. 50-346 Lic:nts Ns. NPF-3 Serial No. 1-825 Attachment Page 1 Toledo Edison Response to NRC Bulletin 88-05 NRC Action 3.a For ASME Code and ASTM materials furnished by VJM or PSI already installed in safety-related systems in operating plants, the following actions are requested:

Provide a list of the VJM and PSI supplied materials that are found not to be in conformance with the applicable code requireme..'s or procurement specifications and identify the applications in which the materials are used.

Include the materials specification, the nature of the component (e.g., pipe flange), size, and pressure rating; also indicate the chain of purchase.

Response to Action 3.a Toledo Edison identified 279 flanges (safety and non-safety related systems) that vere supplied by VJM or PSI through a reviev of purchase orders and varehouse inventory, and valkdowns of plant systems. There were 23 "Safety-Related" flanges which were physically identified and subsequently tested at Davis-Besse. These flanges vere determined to meet the acceptance criteria established by NUMARC and. considered acceptable by the NRC per Bulletin 88-05 Supplement 2.

NRC Action 4 For any PSI or VJM supplied materials having suspect CMTRs and used in systems that are not safety-related, take actions commensurate with the function to be performed.

Response to Action 4 For flanges installed in "Non-Safety-Related" systems, eleven (11) vere found to be outside of the acceptance criteria (testing criteria established by NUMARC and considered acceptable by the NRC). Toledo Edison reported the nonconformances (per the Bulletin), evaluated the flanges, and concluded that they are suitable for their intended service.

Also, Toledo Edison tested flanges stocked in the varehouse and has identified flanges which are outside the acceptance criteria. These flanges are being held until further direction is received from the NRC.