ML20154F952
| ML20154F952 | |
| Person / Time | |
|---|---|
| Issue date: | 05/10/1988 |
| From: | Kerr W Advisory Committee on Reactor Safeguards |
| To: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-01.100, RTR-REGGD-1.100 ACRS-R-1303, NUDOCS 8805240143 | |
| Download: ML20154F952 (1) | |
Text
.
gyggE-/SF3 me
[
UNITED STATES NUCLEAR REGULATORY COMMISSION o
i 5
- E ADVISORY COMMITTEE ON REACTOR SAFEGUARDS VJ ASHINGT ON, D. C. 20555 May 10, 1988 Mr. Victor Stello, Jr.
Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Stello:
SUBJECT:
REVISION 2 TO REGULATORY GUIDE 1.100, dSEISMIC QUALIFICATION OF ELECTRIC AND MECHANICAL EQUIPMENT FOR NUCLEAR POWER PLANTS" During the 337th meeting of the Advisory Committee on Reactor Safe-guards, May 5-7, 1988, we concurred in the regulatory position proposed in Revision 2 to Regulatory Guide 1.100, "Seismic Qualification of Electric and Mecnanical Equipment For Nuclear Power Plants."
Sincerely, William Kerr Chairman
References:
Memorandum dated March 21, 1988 from Eric S. Beckjord, Office of Nuclear Regulatory Research, to Raymond F. Fraley, JCRS, transmitting:
a.
Pevision 2 to Regulatory Guide 1.100, "Seismic Qualification of Electric and Mechanical Equipment For Nuclear Power Plants," riarch 1988.
b.
IEEE Std. 344-1987, "Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear i ower Generating Stations."
c.
Public Coment Letters d.
Resolution of Public Comments cc:
S. J. Chilk, SECY T. Rehm, ED0 E. Beckjord, RES G. L. Arlotto, RES S. K. Aggarwal, RES C. Bartlett, RES A. Cappucci, NRR 8805240143 800510 PDR
\\