I d

3882111660 AVERAGE DAILY UNIT P0wtR LEVEL o

DOCKdT N0. 50 - 352 UNIT L!stRICK UNIT 1 DATE SEP 12, 1884 COMPANY PHILADELPHIA ELECTRIC COMPANY J. J. WVRPHY REPORTS SUPERVISOR PROJECT DIV!$10N LINERICK GENERATING STATION TELEPHONE (21$) 327*1200 EXTEN$10N 3752 WONTH AUGUST 1988 DAY AVERAGE DAILY PoetR LtytL DAY AvtRAGE DAILv P0utR Ltytt (WWE Ntt)

(wwt-Aff) 1 859 17 881 2

862 16 869 3

868 19 883 4

20 837 5

857 29 880 6

859 22 836 7

868 23 429 8

462 24 823 9

866 25 823 to 859 26 812 11 862 27 808 12

$l4 28 804 t

13 858 28 788 14 460 30 II?

15 860 al 814 16 874 t s 1 <4<

i e

\\\\t

OPERATING DATA REPORT 38821 660 f

DOCKET NO. 50 - 382 DATE StP 12, 1984 CorPLETED BY PHILADELPHIA ELECTRIC COPFANf J. J. lNe*HW 8080ett suptevisce pe0 JECT Sivisten blottita stataartme Stattom itLt*.9at still att itee latent:0= sist OPERATING STATLG

1. LMIT MAMtt LIMLRICK LMIT 1 l NOTES LMIT 1 EMPERIENCIO NO l

l l

2. REPORTING PERIL 3' AUGUSTe 1968 I

CUTAGl$ DURING THE l

l l

3. LICENSED THERMAL PONERIPNTil 3293 l

MONTH. PONER IS M ING l

l g

4. NAMEPLAft RATING (OR068 798E ll 1134 l

ADMINISTRAT!YELY LIMITED l

l l

S. MSION ELECTRICAL RATING INtf P948 ):

1085 l

eut to mien Oppeas attivity.

l l

l

6. MAXIPRM MPENDASLE CACACITY (840$$ PMtil 1092 l

l l

l

7. MAXIPt.M MPiPeABLE CAPACITY INET PttE ll 1055 l

l

4. IF CHANotS OCCUR IN CAPA(;ITY RATINGS (IftttS NUMBER S THROUGH 7) SINCE LAST REPORTe SIVE Pt&SONSI
9. P0HER LEYtL TO PG4ICH RESTRICYED, IF ANY INET Ptetit see t
10. RE ASONS FOR RESTRICTIONS IF APNs intl It imotCATIvt 08 Co* pts thovCt0 Cesa0steg og a pimitt L

kVuete 08 C0=ta06 2001. ImS8tttt04 094tm4 tat $tt040 napwsst=0 Ovtact wtL6 ottanutnt tat sattet er any samast.

1 THIS NONTH YR.TO DATE C1,MAATIVE

[

t

11. HOURS IN RtPORTING PERIOD 7M S 855 22,631 l;
12. PGAGER OF HOURS MACTOR NAS CRITICAL 74.0 8.847.3 14.415.5
15. MACTOR HMRVE SMUTDC>N HOURS 0.0 0.0 0.0
14. McLat$ StNit ATOR OH LINE 744.0 S e M1.0 14:103.7
18. LMIT MetRYE SNUTD0DN HOURS 0.0 0.0 0.0
16. 0R064 TMilrML ENt34T MNERAf tp (P94H1 2 040:3F0 16e448.581 55 341.902
17. GROSS IllCTRICAL INER$Y MNERAft01904) 66t.880 S.507e810 14,006,680
14. Mtf ELECTRICAL F,NER6f MNERAf t0 IPNM) 631 t64 Sects,147 17et43.024 PA38 1 Of t

3882111660 e

OPERATING DATA REMT (CONTIWED)

DOCKET NO. 80 = 352 s

DATE SEP 42, 1944 THIS MONTH YR-TO-DATE CLMJLATIVE

19. LD41T SERVICE FACTOR 100.ts 94.6 60.0
20. LMIT AVAILABILITY FACTOR 100.0 94.6 80.0
21. LMIT CAPACITY FACTOR IV;7No MDC NET) 40.4 42.5 72.3
22. LMIT CAPACITY FACTOR IUSING DER NET) 40.=

42.5 72.3

21. LMIT FORCEO CUTAet RATE 0.0 5.4 4.5
24. $0UTD06445 SCHEDULED Ov!R NEXT 4 MONTHS ITYPt e Daft AND DURATIf> of EACHit
23. IF SMUTDOI+4 AT FNO 0F REPORT PER100. ESITMAff 0 OATE OF STARTUP8
26. LMITS IN TEST STATUS (PRIOR To COPHERCIAL OPERATION):

FORECAST ACHIEVED

[

INITIAL CRITICALITY 12/19/64 12/22/64 IK',TIAL ELICTRICITY MID APRIL SS 4/13/45 l

CorNERCIAL OPERATION 1ST GTR 46 t/01/8' P

l PAGE 2 0F t l

P i

l o

3882111660 LMIT SHUTD0804B AND P004R REDUCTIONS DOCKET No. 80 352

,d UNIT NAME LIMERICK UNIT 1 DATE SEP 12, 1944 REPORT MONTH AUGUSTe 1944 COMPLETED BY PHILADELPHIA 'LECTRIC CC W ANY

4. J.eveowv esseeft s#sevitee Poestet elvitten l

4tetetta 64=teattmo statten itLeontat (3:43 337.t304 sattutten sist

=::::...........

l l

l l

l MEuco 0F l LICEN$t t lSYSTEMICOWOMENTl CAU$t AND CORRICTIVE l

lTYPf lDVRATIONlRI ASONISMUTTING 006941 EYtNT l C00t l CODE l ACTION TO No.1 DATE l till (HOURSll til l REACTOR (5) l REPORT e 1 (4) l (El l PREVENT RECURRENCE

...o........................................................................................................................

l l

l..... l l

l l

l l

I I

i 1

I I

t I

l 1

Ill ill (Il (4)

F. FORCED REASON METH00 EXHIBIT G. INSTRUCTIONS S

  • SCHEDUlt0 A. EQUIPMENT FAILURE (EXPLAIN:

1. MANUAL FOR PREPARATION OF DATA B = MAINTENANCE 04 TEST t. MAPAJAL SCRAM.

INTRY SHttTS FOR LICE >t1Et C. REFULLING S. AUTOMATIC SCRAM.

EVENT REPORT ILERI D = REGULATORY RESTRICTION 4. OTHtw itXPLAINI FILE IPAmtG-01611 I. OPERATOR TRAINING e LICENLt EXAMINA? TON F. ADMINISTRATIVE 45)

G. OPERATIONAL (RROR IEXPLAINI H. OTHERitXPLAINI EXHIBIT I - SAME SOURCE s

3882111660 I

Docket No. 50-352 Attachment to Nonthly operating Report for August 1988 Limerick Generating Station Unit 1 August 1 through August 31, 1988 I.

Narrative Stumary of Ooeratina Eroeriences Limerick Unit 1 began the month at 87% of rated thermal power.

On August 2, during the performance of the D14 Diesel Gener-ator monthly operability ST, the output breaker tripped (on reverse power relay actuation) when attempting to close onto the D14 safeguard bus.

The reverse power relay activated because the generator and bus voltages were slightly mis-matched.

No additional problems were experienced with the ST after the breaker was reclosed.

On August 15, RCIC was blocked and declared inoperable to allow Maintenance to pe.? form preventative maintenance.

Durir.g restoration, problems were identified which required corrective maintenance including replacing the anti-rotation stem key and repacking HV-50-1F045, repairing HV-49-1F031 and venting FT-49-lN003.

RCIC was declared operable follow-ing satisfactory completion of ST-6-049-230-1, RCIC Pump, Valve and Flow test on August 19.

On August 20, reactor power was reduced to 75.7% to suppott, control rod SCRAM time testing.

Following satisfactory completion of testing, reactor power was returned to 87% of rated thermal power.

On August 22, reactor power was reduced to 81.5% due to an increase in offgas activity.

Reactor power was maintained at 2700 MWTH (82%) through the remainder of this operating period per Reactor Engineering's direction.

II.

Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Relief Valves during this month.

1

3882111660 PHILADELPHIA ELECTRIC COMPANN LIMERICK OENER ATING STATION P. O. BOX A S AM ATOG A. PENNSYLV ANI A 19464 (118) 3271200. EXT. 3000 GR AM AM M. LSITCM w..... E *.'..'.*.'.*1'."...

September 15, 1988 Docket No. 50-352 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 Atter. tion:

Document Control Desk

Subject:

Limerick Generating Station Monthly Operating Report Gentlemen:

Enclosed is the monthly operating report for Limerick Unit 1 for the month of August, 1988, forwarded pursuant to Technical Specification 6.9.1.6.

Ver truly yoprs, fy;,

g Aa,,.

G ' ' 2" "

1 JJM/sp Enclosure cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

William T. Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector David E. Ney, PA Dept. of Environmental Resources W. H. Lovelace, NRC (2 copies)

INPO Records Center n

rE2 4

'l i

~

_