Monthly Operating Repts for Aug 1988 for Peach Bottom Units 2 & 3
ML20154F716
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/31/1988
From: Alden W, Middleton L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF ENFORCEMENT (OE)
References
NUDOCS 8809200095
Download: ML20154F716 (14)


Text

,

i NRC Monthly Operations Summary l

Peach Botton Atoele Power Station August, 1988 I

I UNIT ?

o lhe unit remained shut down with restart activities progrest. Activities in progress durt the report period included electrical Js maintenance and emergency cool.ng tower pump rebutid.

l i

UNil 3 The unit remained shut down throughout the report period. Activities in progress during the report period included main turte overhaul.

l 1

l l

l l

i I

i f

i t

ADOCK05g27

%gQ seo9200095 seosat]

PDR Q

a

Dock t No. 50-277 Attachnert to Monthly Operating Report for August, 1988 ilNIT 2 REFUELING INFORMATION 3

1.

Name of facilit.y:

Peach Botton Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 7 completed.

Reload 8 indeterminate due to Shutdown Order.

3.

Scheduled date for restart following refueling:

Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

(1) Administrative changes to reload amendment (2) Reactor Water Level instrument range change 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

1 cubmitted April 25, 1988 2 submitted Octcber 13, 1987 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

1 Core-764fuelAssemblics fuel Pool - 1734 fuel Assemblies, 58 fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool stor&Je capacity has been relicensed for 3819 fuel assemblies.

1

Docket No. 50-277 Attachment to Monthly Operating Report for August, 1988 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September, 1998 (September 1995, with reserve full core discharge) l l

l

Docket No. 50-278 Attachment to 1

Monthly Operating Report for August, 1988 UNIT 3 REFUELING INFORMATION t

1.

Name of facility:

Peach Botton Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 7 in progress (Major Pipe Replacement Outag '

3.

Scheduled date for restart following refueling Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

3 Technical Specifications to accommodate reload fuel and revise reactor core operating limits. Revisions to reflect modification to the primary system piping and installation of the Alternate Rod Insertion system.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Alternate Rod Insertion Amendment submitted June 12, 1987.

Primary System Piping Amendment submitted March 21, 1988.

Reload 7 License Amendment submitted July 7,1988.

6.

Important licensing considerations associated with refueling, e.g., r cw or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

4 None expected.

7.

The number of fuel assemblies ga) in the core and (b) in the spent fuel storage pool:

(a) Core - 0 fuel Assemblies (764 assemblies offloaded during outage)

(b) fuel Pool - 2260 fuel Assemblies, 6 fuel Rods i

Docket No. 50-278 Attachment to Monthly Operatirs Report for August, 1988 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any I

increase in licensed storage capacity that has been requested or is l

planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on february 20, 1987. The completion date for this modification has been rescheduled for february, 1989 to accommodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

March, 1993 (reserve full core discharge cannot be accommodated af ter the restart following the completion of the October,1987 refueling outage until the completion of the new fuel racks)

Installation of the new fuel racks will extend the projected date of the last refueling to September, 2000 (March, 1996, with reserve full core discharge) l l

l

l -

lI l

AVERAGE DAILY LMIT PCMER LEVEL DOCKET No. 50 - 277 LMIT PEACH BOTTON UNIT 2 DATE SEP 12, 1988 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L. MIDOLETON TECHNICAL ASSISTANT LICENSING SECTION PAJCLEAR SUPPORT DEPARTMENT TELEPHONE (L15) 841-6374 MONTH ALTAJST 1988 DAY AVERA { DAILY PCHER LEVEL DAY AVERAGE DAILY POMER LEVEL i194E-NET )

1 P94E-NET )

1 0

17 0

2 0

18 0

3 0

19 0

4 0

to 0

5 0

21 0

6 3

22 i

7 0

23 0

8 0

24 0

9 0

25 0

i 10 0

26 0

11 0

27 0

I 12 0

28 0

13 0

29 0

1 14 0

30 0

15 0

31 0

16 0

l} p

^^

l i

i AVERAGE DAILY WIT PONER LEVEL DOCKET NO. 50 - 278 IJNIT PEACH BOTTOM UNIT 3 DATE SEP les 1988 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L, MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION MJCLEAR SUPPORT DEPARTNENT TELEPHONE 1215) 841-6374 HUNTH AUGUST 1988 DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE OAILY P0HER LEVEL ltME-NET)

I M -NET) 1 0

17 0

i 2

0 18 0

3 0

19 0

4 0

to 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

10 0

30 0

15 0

31 0

16 0

OPERATING DATA REPORT

~ DOCKET No. 50 - 277 DATE SEP 12, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841 6374 OPERATING STATUS 1

1. UNIT HAMEl PEACH BOTTOM UNIT 2 l NOTESI UNIT 2 REMAINED SHUTDobed l

l l

2. REPORTING PERIO0s AUGUST, 1988 l

UNDER NRC ORDER HITH l

l l

3. LICENSED THERMAL POWERIMKT):

3293 l

RESTART ACTIVITIES l

l l

G. NAMEPLATE RATING (GROSS M4E li 1152 l

CONTINUING.

l l

l

5. DESIGN ELECTRICAL RATING (HET MHE):

-1065 l

l l

l

6. HAXIMUM DEPENDABLE **0ACITY IGROSS HHE ls 1098 1

l l

l

7. HAXIMUM DEPENDABLE CAPACITY (HET MHEll 1051 l

l O. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS HlkSER 3 THROUGH 7) SINCE LAST REPORT, git E REASONSI

9. P0HER LEVEL TO HHICH RESTRICTED, IF ANY (HET MHE)8
10. REAS0tG FOR RESTRICTI0tGe IF ANY THIS MONTH YR-TO-DATE CtAULATIVE
11. HOURS IN REPORTIN1 PERIOD 744 5,855 124.127
12. HUMBER OF HOURS REACTOR HAS CRITICAL 0

0 74,196.8

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0
10. HOURS GENERATOR ON-LINE 0.0 0.0 71,866.8
15. UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED IMHHI O

O 212,810,745

17. GROSS ELECTRICAL ENERGY GENERATCD IMHH) 0 0

70.019,230

18. 9r,r ELECTRICAL ENERGY GENERATED IMHH) 3,824 m

-30,714 67,010 402 PAGE 1 0F 2 L

OPERATING DATA REPORT ICONTIPAJED)

DOCKET NO. 50 - 277 DATE SEP 12, 1988 THIS MONTH YR-TO-DATE CUHULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 57.9
20. UNIT AVAILABILITY FACTOR 0.0 0.0 57.9
21. LNIT CAPACITY FACTOR (USING MOC NET) 0.0 0.0 51.4 22.. WIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 50.7
23. WIT FORCED OUTAGE RATE 0.0 0.0 14.6 2*,. SHUTD06e4S SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH)

REFUELING OUTAGE

25. IF SHUTDOPN AT END OF REPORT PERIDO, ESTIMATED DATE OF STARTUPI Indeterminate due to NRC Shutdown Order.
26. LNITS IN TEST STARJS (PRIOR TO COPHERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 Cort 1ERCIAL OPERATION 07/05/74

{.

I i

e PAGE t OF 2 0 - NEGATIVE VALUE REPORTED FOR CONSISTZiCY NITH FEDERAL ENERGY REGULATORY COPHISSION REPORTS.

j I

i h

a b

i OPERATING DATA REPORT L

r' DOCKET NO. 50 - 278 DATE SEP 12e 1988 COMPLE1ED BY PHILADELPHIA ELECTRIC COP 9ANY L. L. MIDOLETON 1ECHNICAL ASSISTAN7 LICENSING SECTION MJCLEAR SUPPORT DEPARTNENT TELEPHONE 1215) 841-6374 OPERATING STATUS
1. WIT NAME R PEACH BOTTOM WIT 3 l NOTES WIT 3 REMAINED SHUTDOW l

l l

E. REPORTING PERIO0t AUGUST, 1988 l

UNDER NRC ORDER MITH l

l g

3. LICENSED THERMAL PCMERIP9(T):

3293 l

' REFUEL AND PIPE RE9LACEMENT l

l l

4. NAMEPLATE RATING (GROSS ME li 1152 l

1N PROGRESS.

l l

l

5. DESIGH ELECTRICAL RATING INET 794E)8 1065 l

l l

6. MAXIPLM DEPENDA8LE CAPACITY IGROSS P94E1s 1998 l

l l

l

7. MAXIHW DEPENDABLE CAPACITY (NET P9tEli 1035 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NLesER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI n
7. P0HER LEVEL TO NHICH RESTRICTED, IF ANY (NET 794E)I
10. REASONS FOR RESTRICTIONS, IF ANY8 v

4_

l THIS NONTH YR.TO-DATE CtH1LATIVE r

11. HOURS IN REPORTING PERICO 744 5.855 120 923 i

I

12. MkSER OF HOURS REACTOR HAS CRITICAL 0

0 76.357.4

13. REACTOR RESERVE SHUTD0694 HOURS 0.0 0.0 0.0 I

1%. HWRS GENERATOR ON-LINE 0.0 0.0 73,929.3

15. UNIT RESERVE SHUTDotti HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATto (194H) 0 0

215:278,901 t

17. GROSS ELECTRICAL ENERGY GENERATED (P94HI 0

0 70,611:432 i

2

18. NET ELECTRICAL ENERGY GENERATED (P94H) e 3,824 e

30,714 67.671.441 t

PAGE 1 0F t 3

i

OPERATING DATA REPORT ICONTINUED)

DOCKET NO. 50 - 278 DATE SEP 12,196d THIS HONTH YR-TO-DATE CLMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 61.6
20. UNIT AVAILABILIT'.'. FACTOR 0.0 0.0 61.6
21. UNIT CAPACITY FACTOR (USING HOC NET) 0.0 0.0 54.5
22. UNIT CAPACITY FACTOR IUSING DER NET) 0.0 0.0 52.9
23. UNIT FORCEO OUTAGE RATE 0.0 0.0 13.3
20. SHLA00PNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, D'7, AND DURATION OF E ACHis INDETERMINATE UNTIL HRC ORDER IS SATISFIED.

-r

25. IF SHUTDOW4 AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP8 Indeterminate due to NRC Shutdown Order.
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORECAST

-ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL CPERATION 12/23/74 4

I

)

PAGE 2 0F 2

\\

~\\

c

. WIT SHUTD0604S AND P0HER REDUCTIONS DOCKET No. 50 - 277 WIT NAME PEACH BOTTOM LNIT 2 DATE SEP lt, 1988 REPORT HONTH AUGUST, 1988 Cof9LETED BY PHILADELPHIA ELECTRIC CCHPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT OLEPHONE I215) 841-6374 I

l l

l l METHOD OF l LICENSEE l SYSTEMIC 0HPONENTl CAUSE AND CORRECTIVE l

l TYP E l DURATI0til RE ASON I SHUTTING D06041 EVENT l CODE l CODE l ACTI0ti TO

'NO.I DATE I (111 (HOURS)l 12) 1 REACTOR (3) l REPORT 8 I (4) l

15) l PREVENT RECURRENCE I

I I

I I

l l

l l

7 l 880801 l S I 744.0 1 C l 1

l N/A l RC l FUELXX l NRC REQUIRED SHUTDotti.

I I

I ----- 1 I

I I

I l

i I

i 744.0 l I

I I

I I

II)

(2)

(3)

(4) 1 F - FT CED PlAS0t4 HETH00 EXHIBIT C - 1NSTRtETIONS O - SCHEDULED A - EQUIPMENT FAILURE IEXPLAIN) 1 - MAtAJAL FOR PREPARATION OF DATA B - MAINTENANCE OR 1EST 2 - HMAJAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELIPO 3 - AUTOMATIC SCRAM.

CVENT REPORT ILER)

D - REGULATORY RESTRICTIch 4 - OTHER (EXPLAIH)

FILE INUREG-4161)

E - OPERATOR TRAINING + LICEtCE EXAMINATION F - ADHINISTRATIVE (5)

G - OPERATI0t4AL ERROR (EXPLAIN)

H - OTHERIEXPLAIN)

EXHIBIT I - SAME SOURCE

I e

e a

LMIT SHUTDOWNS AND POMER REDUCTIONS DOCKET No. 50 - 278 LMIT HAME PEACH BOTTON LMIT 3 DATE SEP lt, 1988 REPORT HONTH AUGUST, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTNENT TELEPHONE 1215) 841-6374 l

I I

l l NETH00 0F l LICENSEE ISYSTEHlCOMPONENTl CAUSE AND CORRECTIVE I

I TYP E l DURATION I RE ASON I SHUTTING DODN l EVENT l CODE l CODE I ACTION TO

>NO.l DATE l (11] IHOURS)l (2) l REACTOR 13) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE 1

I I

I l

i 1

1 I

7 I 880801 l S l 744.0 l C l 1

l N/A l RC l FUELA l PIPE REPLACEMENT DUTAGE.

I I

I I

I I

l l

I I

I I ----- 1 I

I I

I I

I I

I 744.0 l I

I I

I I

(1)

(2)

(3)

(4)

F = FORCED REASON HETH00 EXdIBIT 0 - INSTRUCTIONS O - SCHEDULE 6 A - EQUIPMENT FAILURE IEXPLAIN) 1 - HAJAJAL FOR PREPARATION OF 9ATA B - MAINTENJHCE OR TEST 2 - HAPAJAL SCRAM.

ENTRY SHEETS FOR LI*CCFE C - REFtr. LING 3 - AUTOMATIC SCRAM.

EYENT REPORT ILER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIP.)

FILE (PAJREG-0161)

E - OPERATOR TRAINING + LICEtCE EXAMINATION F - ADMINISTRATIvt (5)

G - OPERATIONAL WRROR IEXPLAINI H - OTHER(EXPLAIN)

EXHIBIT I - SAHE SOURCE

e PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 t215) e 414000 September 15, 1988 Docket Mos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Botton Atomic Power Station Monthly Oper1 ting Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of August, 1988 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly your,

f Y'

~

W. M. Alden Director Licensing Section Nuclear Support Division l

Attachment 1

W. T. Russell, Administrator, Region 1, USNRC cc:

T. P. Johnson, USWRC Senior Resident Inspector S. P. Mangi, Dept. of Envir. Resources W. H. Lovelace, NRC (2 copies)

R. E. Martin, NRC Project Manager Thomas Magette Maryland Power Plant Siting IMP 0 Records Center

'li

--- --