ML20154F642

From kanterella
Jump to navigation Jump to search
Extends Invitation to 880523 Meeting in Rockville,Md W/ Representatives of Bolt Suppliers Re Hilti,Inc 10CFR21 Rept Re Insufficient Recommendation for kwik-bolt Anchor Capacity.Presentation Re Items on Encl Agenda Requested
ML20154F642
Person / Time
Issue date: 05/06/1988
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Quackenbush H
ITW
References
REF-PT21-88 NUDOCS 8805240006
Download: ML20154F642 (3)


Text

-

MAY 6 WBB

[_

3

)

, Mr. Harold Quackenbush, Engineering Manager

}

ITW/Ramset/ Red Head P. O. Box 364 Michigan City, Indiana 46360 Gentlemen:

The Nuclear Regulatory Commission (NRC) was informed by Hilti, Inc., in accor-dance with 10 CFR Part 21, of recent tests of Hilti Kwik-Bolts that indicate that the previously reconnended minimum edge distance from an anchor bolt to an unsupported concrete edge may be insufficient to develop 100% of the recom-mended anchor capacity. The Hilti test results indicate that Hilti Kwik-Bolts placed at a distance of five anchor bolt diameters from an unsupported edge, as reconrended by the Expansion Anchor Manufacturers Institute (EAMI) guidelines, have only 30% of the recommended anchor shear capacity and 78% of the recom-mended tensile capacity. Hilti further indicated, at a meeting with the NRC staff, that the test results are believed to be applicable to other expansion anchor bolts that use the same type of anchor mechanism as Hilti Kwik-Bolts.

The NRC staff feels that the test results indicating a 70% reduction in shear capacity are significant and indicate that there is a potential safety concern that will require further NRC review.

In view of the foregoing, the NRC would like to invite representatives of companies that supply bolts or provide bolt installation services to the nuclear industry, such as your company, to attend a meeting where pertinent information could be freely exchanged between meeting participants. The meeting is scheduled for May 23, 1988, at 1:00 p.m. in Conference Room 12-B-11 at the NRC's White Flint Building which-is located at 11555 Rockville Pike in Rockville, MD. We are requesting that attendees present a brief presentation, approximately 15 minutes, that addresses the subjects listed in the meeting agenda and any other aspects related to this issue which you consider important.

If you plan to attend, or if you have any questions or concerns (such as how to present proprietary information), please contact Jaime Guillen at (301) 492-1153 or Rom Lipinski at (301) 492-0844 before May 16, 1988. Your cooperation on this matter would be greatly appreciated.

Sincerely, Original Signed By Carl H. Berlinger N

I Carl H. Berlinger, Chief es Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation

Enclosures:

1.

Meeting Agenda 2.

Subjects of Presentations DISTRIBUTION w/enclosur_es~

CERossi, NRR CHBerlinger, NRR JGuillen, NRR EJButcher, NRR WDLanning, NRR RLipinski, NRR POR Central Files DCS jM 00EA R/F OGCB R/F JGuillen R/F

[nskiESYNTR" C/0GCB:D0EA:NP

\\

OGC'0' A:NRR JGui en RL CHBerlinger

('A' 05/ /88 05/L /88 65/6/88

gay 6 WBB b

1 May 23,1988 Meeting Agenda Item Speaker Time I.

Introduction NRC 1:00 - 1:15 p.m.

II. Presentations by Manufacturers 1:15 - 3:00 p.m.

Manufacturers

  • III. Discussion / Forum Attendees 3:00 - 4:00 p.m.
  • Invited Manufacturers

~

Hilti, Inc.

Molly Bolt Co.

Ramset/ITW/ Red Head Richmond Screw Anchor Co., Inc.

Tech. Services - Nuclear, Ramset Division - OLIN TRW Assemblies and Fasteners Group, Nelson Stud Division i

i a

i vw-v

r

=

MAY 61988 Principal Sub,iects of Presentations I.

Describe your anchor prodects, their use, and the design recommendations provided to your customers.

II.

Does the "five diameters" or other edge distance criterion apply to your anchor products? Provide justification for your answer.

III. Describe any tests conducted by your organization that provides additional information regarding shear capacity reduction as a function of edge distance.

IV. Provide a list of known nuclear power facilities that use your anchor products.

V.

Describe your company's fatest recomendations regarding edge distance control and their bases.

VI. Approximately what percentage of your type of anchors are possibly affect-ed by the "edge distance" issue?

VII. Present your perspective of the "edge distance" issue.

.