Corrected Ltr Clarifying Intent Re Submittal of TMI-1 Implementation Schedules for Safety & Performance Improvement Program Recommendations.Appropriate Ref 4 Reflected
ML20154F417
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/15/1988
From: Wilson R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154F375 List:
References
C311-88-2092, NUDOCS 8809190386
Download: ML20154F417 (2)


Text

_.

u

. o ,,

GPU Nuclear Corporation i

N e gs w EEu One Upper Pond Road Fars cpany, New Jersey 07054 201 316 7000 TELEX 136-482 Wnter's D: rect O.41 Nurrber:

CORRECTED COPY August 15, 1988 C311-88-2092 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Three Mile Island Nuclese Station, Unit 1 (TM!-1)

Operating License No. OPR-50 Docket No. 50-289 Safety and Performance Inprovement Program (SPIP)

Implementation Schedule Subnittals The purpose of this letter is to clarify GPUN's intent regarding the submittal of Ttil-1 inplementation schedules for the Safety and Perf omance Inprovement Program (SPIP) recomendations. In order to avoid any confution that nay result f rom a BtW Owners Group (BWOG) lettu (Reference 2), this letter docunents our understanding that the official status and schedule on THI-l SPIP recomendations will be tracked as agreed to by the NRC and documented in the NRC staff's Safety Evaluation Report (SER) (Reference 3).

In addition to GPUN subnittals, the BWOG will also be transnitting plans and schedules for implementation of SPIP recomendations for Tit!-1 as well as for all of the St'l plants. The BWOG Reconnendation Tracking System (RTS) Report is the vehicle to be used for this purpose. Since the plant specific infomation contained in the RTS is provided by each utility, the RlS will also provide an overall representation of Tit!-l's implementation schedule and status on the SPIP recomendations.

BWOG submittal of utility plans and schedules is discussed in Reference 2.

The letter also states that each utility will be providing a letter authorizing the BWOG to submit infomation on its behalf. We believe that the infomation the BWOG will be submitting will be an accurate representation of the inf omation submitted to the BWOG by GPUN and generally useful to the NRC staff. However, for the official status, it is our intention that Tiil-1 plans and schedules for inplementation of the SPIP reco71endations be handled as provided for through GPUN's Long Range Planning Progran (LRPP) 45 described in the NRC's SER (Reference 3). The LRPP became part of THI-l's Operating License in License Amendment No. 140, dated May 27, 1988.

_S6 ssogog

[y91?0;JCN0500o39 p C PDC 7206f/0190f GPU N4ev Corpora:on s a svtscary cf Gew Put.c Ut ics Cypera* cn

o <

s .

V. S. Nuclear Regulatory Comission Page 2 The SER (Reference 3) states that in the case of Tfil-1, GPUN's April 4,1988 submittal provides the requested plant s)ecific inplementation schedules in a general sense and that the flRC staff intends to meet with us to discuss the details, including how the individual recommendations will be shown on our LRPP integrated schedule. The current status of GPUN SP!P recommendations is incorporated in the BWOG June update of the SPIP Recommendation Report (Reference 4). We trust that tt,is method of tracking the TMI-l SP!P implementation schedules will be acceptable to the NRC.

In sumary, the LRPP provides the app"opriate nechanism for detailed coordination with the NRC regarding tne inplementation of individual SP!P reconnendations.

S neerily, R'.

PY' F . ' ' ' [oD Vice - ident and Director, Tech, runctions

References:

1. April 4,1083 letter, Hukill (GPUN) to Document Control Desk (NRC),

GPUN Submittal of the Integrated Schedule "ABC" List.

2. fiay 10, 1988 letter, Rutherford (340G) to Crutchfield (NRC).

Transmittal of fiarch Update of SP!P Recomendation Report.

3. June 3, 1983 letter, Stolz rNRC) to Hukill (GPUN), NRC Staff's Safety Evaluation Report (NUREG.1231) on the B!.W Owners Group Plant Reassessment Progran.
4. July 18, 1983 letter, Rutherford (BWOG) to Crutchfield (NRC)

Transnittal of June Update of SPIP Recomendation Report.

RFW/ftRK/her cc: J. Stol!