ML20154F344

From kanterella
Jump to navigation Jump to search
Forwards Amend 36 to Vogtle Electric Generating Plant Unit 1 & 2 Physical Security & Contingency Plan. Encl Withheld
ML20154F344
Person / Time
Site: Vogtle  
Issue date: 09/25/1998
From: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1252, NUDOCS 9810090178
Download: ML20154F344 (3)


Text

-

\\'

a. s.r.i. s sley, Jr., P.E.

Southern Nuclear SAFEGUARDS INFORMATION Vice President Operating Company. lac.

j Vogtle Project 40 in erness Center Parkway ENCLOSURE CONTAINS SAFEGUARDS INFORM l

Birmingham, Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERN COMPANY September 25, 1998 Energs to Serve Your World*

LCV-1252 Docket Nos.: 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D. C. 20555-0001 VOGTLE ELECTRIC GENERATING PLANT PHYSICAL SECURITY AND CONTINGENCY PLAN AMENDMENT NO. 36 Ladies and Gentlemen:

In accordance with 10 CFR 50.54 (p) and 10 CFR 50.4, Southern Nuclear Operating Company hereby submits three copies of Amendment 36 to the Vogtle Electric Generating Plant (VEGP) Unit 1 and Unit 2 Physical Security and Contingency Plan. By copy of this letter, two copies of Amendment 36 are being provided to the NRC Region II Office.

This amendment describes: 1) a change to the required frequency for rotating or changing security locks and cores per 10 CFR 73.55d (7) A; 2) a change to the required frequency for approval of vital area access list per 10 CFR 73.55d (8); and 3) a clari6 cation to the requirements for escorthg non-designated vehicles. provides the description and justification for the changes, and Enclosure 2 contains the actual Amendment 36 pages. Enclosures 3 and 4 give insertion it:stmetions and the new effective page list for the VEGP Physical Security and Contingency Plan.

Only Enclosure 2 is safeguards information and should be withheld from public disclosure in accordance with 10 CFR 73.21.

Please contact this ofDee if you have any questions.

SAFEGU w-,ARDS INFORMATION S.mcerely, m o,os o m Wi ACCORDANCE WITH to CFR 73.21. UNALIrHORIZED 9810090178 980925

[

)

AND CR NAl.S To PDR ADOCK 05000424 F

PDR

],

9,,, %%

eas y,,,

u JBB/BHW/gmb g,%}.J qc,r OrganuationREL Enclosures and xc: (See next page)

SAFEGUARDS INFORMATION d

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

{ /

UPON SEPARATION THIS PAGE IS DECONTROLLED

L SAFEGUARD' INFORMATION S

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission Page 2 1

Enclosures:

1. Changes and Justification i
2. Amendment 36 - Revised Pages (Safeguards Information)
3. Insertion Instructions
4. EfTective Page List xc: Southern Nuclear Operating Comoany Ms. R. H Parker (w)

Mr. J. T. Gasser (w/o)

Mr. M. Sheibani (w/o)

U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator (w/2 copies)

Mr. D. H. Jaffe, Senior Project Manager, NRR (w/o)

Mr. J. Zeiler, Senior Resident Inspector, Vogtle (w/o) i SAFEGLIARDS INFORMATION LCV-1252 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED l

.u a

s

.-..-_.>-u.-.2

.3--..

>a nx 6

GO-DMP-2 Figure 8 SNC SAFEGUARDS INFORMATION TRANSMITTAL From: Southern Nuclear Operating Company SGI Transmittal No.

f-6//

Document Management

/@ 2l l92 Date:

To U. S. Nuclear Regulatory Commision Mall Station PI-137 Washington, D.C. 20555 Attn: Document Control Desk Phone: 301-415-7000 Item Document #

Rev.

Qty.

Document Description /

Remarks SGI Control Log Number L c V-lasA

//oas Amw k atAlo.34 Yo W/060/

" o s las'a n t. "

VEaP PG,*a/ Sena

~

and Goff-ne., PLc/

./

/

Received By Date INSTRUCTIONS FOR SAFEGUARDS INFORMATION

1. Verify the documents received agree with this transmittal.
2. Incorporate the documents into your file.
3. Documents presently in your possession, or documents superseded or voided by the documents being transmitted, must be destroyed in accordance with 10 CFR73.21
4. Call SNC Document Management (205) 992-5431 if you have questions.
5. Sign, date and return this transmittal within 10 days to the appropriate address below:

INTRACOMPANY U.S. Mail SNC Document Management SNC Document Management Inverness 40, Bin B-034 40 Inverness Center Parkway, Bin B-034 l

Birmingham, Alabama 35247 h Revision 3