ML20154F082

From kanterella
Jump to navigation Jump to search
Clarifies 880524 Response to Generic Ltr 88-03 Re Steam Binding of Auxiliary Feedwater Pumps to Resolve Safety Issue 93.Check Valves Modified to Preclude Backleakage Associated W/Binding
ML20154F082
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/09/1988
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR GL-88-03, GL-88-3, NUDOCS 8809190245
Download: ML20154F082 (1)


Text

e

. Alabama Power Company Mo hum 18th Strat

  • Post Oftee Bos 2641

, B,rmingham. A!abama 352914400 Telephone 205 2501837 W. G. Halrston, lit Sennor Vee President September 9, 1988 0 0 #

the SCdhern 6Cic $ys*ern Docket Nos. 50-348 50-364 U.S. Nuclear Regulatory Commissi.u; ATTN: Document Control Desk Vashington, D.C. 20555 t

Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 Resolution of Safety Issue 93 "Steam Binding of Auxiliary Feedvater Pumps" (Generic Letter 88-03)

By letter of May 24, 1988, Alabama Power Company provided its response to Generic Letter 88-03. In this response, it was stated that "an Auxiliary Feedvater (AFV) Check Valve Temperature Monitoring System provides indication of the fluid conditions of the AFV system. Ar.nunciation on the Main Control Board panel is also provided to alert the operators when AFV temperature exceeds a preset ale.rm level. Procedures exist to allow the operators to both recognise and recover from steam binding in the AFV system." Conversations with the NRC Farley Project Manager have indicated that an explicit commitment to maintain compliance with the provisions of Generic Letter 88-03 is needed. Alabama Power Company therefore clarifies its May 24, 1988 response as follows.

Subsequent to the installation of the AFV check valve monitoring system.

Alabama Power Company modified the check valves to preclude the backleakage associated with steam binding. The current monitoring system has confirmed the adequacy of this modification and vill be utilised during the current and next cycle of operation for each unit. No changes that would degrade the confidence provided by this system or the associated procedures discussed above vill be made during this period. At the end of the next cycle of operation for each unit, changes to procedures or the monitering system may be made in accordance with the provisions of 10CFR50.59.

If you have any questions, please advise.

Respectfully submitted, h,h [

V. G. Hairston, III VGH,III/JARadst-V8.24 cc: Mr. L. B. Long Dr. J. N. Grace f.