ML20154E886

From kanterella
Jump to navigation Jump to search
Forwards Impep Rept on Kansas Agreement State Program.Mgt Review Board Found Kansas Program Adequate,But Needs Improvement & Compatible with NRC Program
ML20154E886
Person / Time
Issue date: 09/23/1998
From: Thompson H
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Mitchell G
KANSAS, STATE OF
Shared Package
ML20154E891 List:
References
NUDOCS 9810090015
Download: ML20154E886 (4)


Text

'

l g

Mr. G ry R. Mitch:ll, S:cretary K nsas D:pirtm:nt of H:alth and Environment' [8EP 2 31998 Ltndon St:.t3 Office Building, Room 620 900 S.W. Jackson Street Topeka, KS 66612-1290

Dear Mr. Mitchell:

On September 9,1998, the Management Review Board (MRB) met to consider the proposed final Integrated Materials Performance Evaluation Program (IMPEP) report on the Kansas Agreement State Program. The MRB found the Kansas program adequate, but needs improvement and compatible with NRC's program.

Section 5.0, page 17, of the enclosed final report presents the IMPEP team's recommendations and suggestions.

Based on the results of the current IMPEP review, a follow-up review focusing on the technical quality of licensing will be scheduled next year. The timing of the next full review will be coordinated with your staff.

I appreciate the courtesy and cooperation extended to the IMPEP team during the review and your support of the Radiation Control Program. I look forward to our agencies continuing to work cooperatively in the future.

Sincerely,d Origin signed.oy Euch L Thompa k Hugh L. Thompson, Jr.

Deputy Executive Director for Regulatory Programs

Enclosure:

As stated cc: Ronald Hammerschmidt, Director Division of Environment Kansas Depaitment of Health and Environment Vick L. Cooper, Chief Radiation Control Program l Bureau of Air and Radiation Kansas Department of Health & Environment bec: Chairman Jackson Commissioner Diaz Commissioner McGaffigan

, ,I -, \

WJ r--- r-- ~ ' ' ' ~

Distribution: See next page.

( $ 0' .1 *See previous concurrence.

DOCUMENT NAME: G:\lMPEP\KS98FNLT.WPD, G:\lMPEP\KSIMP98.FNL T* receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure 'E's= Copy with attachment' enclosure "N* = No copy OFFICE OSP l OSP:DD l OSP:D h n / DED,F),_} l NAME JHornor:kk PHLohaus RLBangart ' HD HLThorr$sM DATE 09/17/98* 09/ /98 09// 0/98 09/L@98 9810090015 980923 OSP FILE CODE: SP-AG-10 1 PDR STPRG ESGKS f PDR

.y

Distribution:

EDO RF LHowell, RIV DIR RF CHackney, RIV DCD (SP01)

SDroggitis LMcLean, RIV PDR (YES_f_ NO )

KSchneider FCameron, OGC LRakovan HNewsome, OGC JThompson, AR LBolling/ASPO JJohansen, NMSS TCombs, OCA (2 copies)

GDeegan, NMSS KCyr, OGC DCool, NMSS CPaperiello, NMSS FCameron, OGC TMartin, AEOD HNewsome, OGC ROuillin, CO LBolling/ASPO FCombs, NMSS Kansas File 1

I Mr. Grry R. Mitch:ll, S:cr:tary Kansas D:pirtm:nt of Hulth and Environm:nt Landon State Office Building, Room 620 900 S.W. Jackson Street Topeka, KS 66612-1290

Dear Mr. Mitchell:

On September 9,1998, the Management Review Board ( B) met to consider the proposed final Integrated Materials Performance Evaluation Progra (IMPEP) report on the Kansas Agreement State Program. The MRB found the Kansas ogram adequate, but needs improvement and compatible with NRC's program.

Section 5.0, page 17, of the enclosed final report prese s the IMPEP team's recommendations and suggestions.

Based on the results of the current IMPEP review, a f low-up review focusing on the technical quality of licensing will be scheduled next year. The timing of the next full review will be determined at that time.

I appreciate the courtesy and cooperation extended to the IMPEP team during the review and your support of the Radiation Control Program. I lobk forward to our agencies continuing to work cooperatively in the future.

Sincerely, Hugh L. Thompson, Jr.

Deputy Executive Director for Regulatory Programs

Enclosure:

As stated cc: Ronald Hammerschmidt, Director Division of Environment Kansas Department of Health and nvironment Vick L. Cooper, Chief Radiation Control Program Bureau of Air and Radiation Kansas Department of Health & Environment bec: Chairman Jackson Commissioner Diaz Commissioner McGaffigan Distribution: See next page.

DOCUMENT NAME: G:\lMPEP\KS98FNLT.WPD, G:\lMPEP\KSIMP98.FNL Tx receive a copy of this document, indicate in the box: "C* = C@y without attachment / enclosure "E" = Copy with attachment / enclosure "N* = No copy OFFICE OSP/y l OSP;DD l OSP:D l DEDR l l NAME JHornor:kk' J ke' PHLoha'us RLBangart HLThompson DATE 09/Y1/98 09/ /98 09/ /98 09/ /98 OSP FILE CODE: SP-AG-10

e '

e '

j pfL CEQ w

g 4 UNITED STATES g

j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006Ho01

\ .... */ REP 2 31938 Mr. Gary R. Mitche!!, Secretary Kansas Department of Health and Environment Landon State Office Building, Room 620 900 S.W. Jackson Street Topeka, KS 666121290

Dear Mr. Mitchell:

On September 9,1998, the Management Review Board (MRB) met to consider the proposed final Integrated Materials Performance Evaluation Program (IMPEP) report on the Kansas s Agreement State Program. The MRB found the Kansas program adequate, but needs improvement and compatible with NRC's program.

Section 5.0, page 17, of the enclosed final report presents the IMPEP team's recommendations and suggestions.

Based on the results of the current IMPEP review, a follow-up review focusing on the technical quality of licensing will be scheduled next year. The timing of the next full review will be coordinated with your staff.

I appreciate the courtesy and cooperation extended to the IMPEP team during the review and your support of the Radiation Control Program. I look forward to our agencies continuin0 to work cooperatively in the future.

Sinc ely, d) u . Thompso , Jr.

D p ty Executive Direc r for Regulatory Prog s

Enclosure:

As stated cc: Ronald Hammerschmidt, Director Division of Environment Kansas Department of Health and Environment Vick L. Cooper, Chief Radiation Control Program Bureau of Air and Radiation Kansas Department of Health and Environment

]