Requests That Licensee Review LA-CP-87-02, Nonpower Reactor Sabotage Study & Provide Listed Info
ML20154E669
Person / Time
Site: 05000054
Issue date: 09/13/1988
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Mcgovern J
CINTICHEM, INC.
Shared Package
ML20154E673 List:
References
NUDOCS 8809190090
Download: ML20154E669 (3)


Text

._ _ _ _ _ . _ _ _ _ _ _ _ .

7 "L September 13, 1988' Docke't No. 50-54 Mr. James J. McGovern, Director Sterling Forest Research Center Cintichem, Inc.

P. O. Box 324 Tuxedo, New York 10987

Dear Mr. McGovert;:

SUBJECT:

REVIEW 0F NON-POWER REACTOR SABOTAGE STUDY The confidential report, "Nonpower Reactor Sabotage Study," LA-CP-87-02, January 1987, has been forwarded to your temporary storage facility. A copy of the transmittal letter is enclosed for your information. lhe personnel at your facility who currently hold or received clearar,ces from NRC to review the report should make arrangements at this time to perform the review.

We are forwarding the reactor descriptiens, facility analysis, and radionuclide release consequences sections of the report for your particular facility.

Please review and provide the following information:

(1) Identify any errors of fact and provide correct information.

(2) Provide coments as necessary on the analysis.

This may be done directly on the report pages provided. Should you decide to write a separate document, please insure that '.t is properly classified. Please complete your review within 45 days of receipt of this letter. If you have any questions, please contact me at 301-492-1121.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.95-511.

Sincerely, origi .; sianed by Alexander ABams, Jr., Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated

)!STRIBUTION:

'3ectet I11e (8)L CMiller ACR3 (10) EJordan NRC & Local PCR RErickson, RSGB PDSNP Reading EHylton (8)

BGrimes AAdams OGC-Rockville Region 1 LA PDSN PDSNp9 AD:PDSNP RSG El on AAdaw.bw Chiller REr ksen 07 /88 07/fl/88 07/01/88 07) '/88 fp\

'g IDENTICAL LETTER HAS BEEN SENT TO ADDRESSEES ON ATTACHED SHEET.

gg r x88 ! 82 8s4 PDC p

7.

ADDRESSEES Docket No. 50-2 Dr. William F. Kerr . Director Phoenix Memorial Laboratory Ford Nuclear Reactor University of Michigan 2301 Bonisteel Boulevard Ann Arbor, Michigan 48109-2100 Docket No. 50-160 '

Tr. Ratib A. Karam, Director  !

Neeley Nuclear Research Center Georgia Institute of Technology L Atlanta, Georgia 30332  ;

Docket No. 50-193 Mr. A. Francis D1Heglio, Director Nuclear Science Center Rhode Island Atomic Energy Comission

South Ferry Road ,

Narrangansett, Rhode Island 02882 j Docket No. 50-184 f Dr. R. 5. Carter, Chief Reactor Radiation Division I National Bureau of Standardt

  • U.S. Department of Commerce i J Gaithersburg, Maryland 20899 Docket No. 50-20 Dr. Otto K. Harling, Director ,

, Nuclear Reactor Laboratory Massachusetts Institute of Technology 138 Albany Street Cambridge, Massachusetts 02139 -

Decket No. 50-57 Mr. Louis G. Henry .'r. , Director Buffalo Materials Research Center State University of New York at Buffalo Rotary Road Buffalo, New York 14214 Docket No. 50-186 Dr. Robert M. Brugger, Directer Research Reactor Facility University of Missouri Columbia, Missouri 65211 1

-, -- . -__,-.,--,---.~,--__,_,____v- -

,..--_-_.-r_--.-- - - _ , , . . , - , . - ..r----_,..- , . - - _ - - - -,,-wm

c sau

+f  %, UNITED STATES

  • E e NUCLE AR REGULATORY COMMISSION 3

$ I W ssHING TON, D. C. 20666

(.....)

Docket No. 50-54 September 13, 1988 Mr. Jr,mes J. McGovern. Director Sterling Forest Research Center Cintichem, Inc.

P. O. Box 324 Tuxedo, New York 10987

Dear Mr. McGovern:

SUBJECT:

REVIEW OF NON-P0WER REACTOR SABOTAGE STUDY The confidential report, "Nonpowar Reactor Sabotage Study," LA-CP-87-02, Jc.nuary 1987, has been forwarded tc your temporary storagt facility. A copy of the transmittal letter is enclosed for your information. The personnel at your facility who currently hold or received clearances from NRC to review the report should make arrangements at this time to perform the review.

We are forwarding the reactor descriptions, facility analysis, ead radionuclide release consequences sections of the report for your particular facility.

Please review and provide the following information:

(1) Identify any errors of fact and provide correct information. '.

(2) Provide comments au necessary on the analysis.

i This may be done directly on the report pages provided. Should you decide to l write a separate document, please insure that it is properly classified. Please complete your review within 45 days of recaipt o, this letter. If you have any questions, please contact me at 301-492-1121.

The reporting and/or recordkeeping requirements contained in this letter '

affect fewer than ten respondents; therefore, OFB clearance is not required under P.L. 95-S11.

Sincerely, M .

Alexander Adams, Jr., oject Manager Standardization a n-Power Reactre Project Directorate Divisio4 of Reactor Projects - 111, IV, Y anc Special Projects ,

Office of Nuclear Reactor Regulation

Enclosure:

As stated