Forwards Rev to Security Plan Describing Methodology Used to Protect Secondary Supply Sys.Rev Withheld
ML20154E503
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/13/1988
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809190021
Download: ML20154E503 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

SAFEGUARDS JNF.ORMAIl0N T $ ~__ PortlandGeneralBectricCogany i E David W. Cockfield V;ce President. Nuclear September 13, 1988 Trojan Nuclear Plant Docket 50-344 Licenso NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Deer Sir:

Trojan Nuclear Plant Security Plan Revision Our letter of January 15, 1988 indicated we were still evaluating the required changes at Trojan to implement the secondary power supply portion of the Miscellaneous Amendments Rule. On April 28, 1988 we met with representatives from the Nuclear Regulatory Commission (NRC) and described our proposed changes. Based on our discussions following the meeting, we have prepared a revision to the Security Plan (pCE-1017) to describe the methodology to be used to protect the secondary power supply system and the date for completing the modifications. A description of the changes to the Security Plan are provided in Attachment A. The revised p un pages are provided as Attachment B.

We intend to submit an additional revision to the Security Plan by January 31, 1989 in accordance with Part 50.90 of Title 10 of the Code of Federal Regulations to request approval of the exemptions for the secondary power supply modifications discussed during the April 28, 1988 meeting.

You identified a concern regarding our reply in Item 10 af Attachment A to our January 15, 1988 letter. This reply dealt with log-keeping practicos as specified in Section 13.8 of the Security Plan. In order to resolve your concern, a copy of Administrative Order 8-3, "Physical Protection /

Access Control", is provided as Attachment C. This describes in Section IV.B when manual logs are maintained.

GSO9190021 G80913 PDR ADOCK 05000344 g;[f((My /dg/

F PDC g l TAFECUARDS INFORiiKTiOY o

o. = , .m om c3cl ,

3 I

1.NIGid.%IlGM LMLQAWh.

1:t E '.'. 5 i mM iN-M P:crd C ep TM :

a. ,

SAFEdUARDS INF3R' MAIL 0N Portland GeneralBachicConveny Document Control Desk September 13, 1988 Pane 2 _

We trust thir submittal is sufficient to allow the issuance of the Miscellaneous Ar ondrnent revision to the Security Plan. We commit to implementation of the amended safeguards requirements within 180 days of NRC approval.

Sincerely, v &

Attachments et Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. William T. Dixon State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant SAFEGUARDS INFOR'MhTION UNCLASSIFIED WHEN SEFARATED FROM SAFEGUARDS thFORMATION ENCLOSURE

. . .