ML20154D817

From kanterella
Jump to navigation Jump to search
Extends Invitation to Attend 880523 Meeting in Rockville,Md to Discuss Recent Tests of Hilti Kwik-Bolts.Attendees Requested to Present Brief Presentation Addressing Subjs Listed in Encl Meeting Agenda
ML20154D817
Person / Time
Issue date: 05/06/1988
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Ernst L
MOLLY BOLT CO.
References
REF-PT21-88 NUDOCS 8805190357
Download: ML20154D817 (3)


Text

_ _ _ _. _ ___

MAY 6 1988 (R g i

Mr. Larry Ernst, Product Manager Molly Bolt Co.

I 504 Mt. Laurel Avenue

{

Temple, Pennsylvania 19560 l

1 Gentlemen i

i The Nuclear Regulatory Corrrnission (NRC) was informed by Hilti, Inc., in accor-dance with 10 CFR Part 21, of recent tests of Hilti Kwik-Bolts that indicate j

that the previously reconinended minimum edge distance from an anchor bolt to an 4

unsupported concrete edge may be insufficient to develop 100% of the recom-i i

mended anchor capacity. The Hilti test results indicate that Hilti kwik-Bolts placed at a distance of five anchor bolt diameters from an unsupported edge, as recommended by the Expansion Anchor Manufacturers Institute (EAMI) guidelines, i

have only 30t of the reconinended anchor shear capacity and 781 of the recom-mended tensile capacity.

Hilti further indicated, at a meeting with the NRC staff, that the test results are believed to be applicable to other expansion anchor bolts that use the same type of anchor mechanism as Hilti Kwik-Bolts.

The NRC staff feels that the test results indicating a 70f reduction in shear capacity are significant and indicate that there is a potential safety concern I

that will require further NRC review.

In view of the foregoing, the NRC would j

like to invite representatives of companies that supply bolts or provide bolt installation services to the nuclear industry, such as your company, to attend 1

i a meeting where pertinent information could be freely exchanged between meeting participants. The meeting is scheduled for May 23, 1988, at 1:00 p.m. in Conference Room 12-B-11 at the NRC's White Flint Building which is located at l

11555 Reckville Pike in Rockville, MD. We are requesting that attendees

(

present a brief presentation, approximately 15 minutes, that addresses the subjects listed in the meeting agenda and any other aspects related to this issue which you consider important.

i i

If you plan to attend, or if you have any questions or concerns (such as how to J

present proprietary information), please contact Jaime Guillen at i

(301) 492-1153 or Rom Lipinski at (301) 492-0844 before May 16, 1988 Your

[

cooperation on this natter would be greatly appreciated.

Sincerely, 1

Original Signed By l

Carl R Bnlinm 1

8805190307 Mne

  • Carl H. Berlinger, Chief 4

PDR PT21 WR Generic Communications Branch se Division of Operational Events Assessment Office of Nuclear Reactor Regulation

Enclosures:

1.

Meeting Agenda j

2.

Subjects of Presentations DISTRIBUTION w/ enclosures CERossi, hRP, CHBerlinger, NRR JGuillen NRR EJButcher, NRR WDLanning, NRR RLipinski, NRR y$

PDR Central Files DCS l

DOEA R/F OGCB R/F JGuillen R/F K

m, Jn wwA k (tr y\\ :

t OGCS GEA:NRR EkCB:DE TWER C/0GCB:DOEA:NRR b)pl l

JGu D en RLipinski" CHBerlinger 05/L /88 05/L/88 05/01./88

\\

MAY 6 1989 May 23. 1988 Meetino Agenda item Speaker Tire 1.

Introduction NRC 1:00 - 1:15 p.m.

!!. Presentations by Manufacturers 1:15 - 3:00 p.m.

Manufacturers *

!!!. Discussion / Forum Attendees 3:00 - 4:00 p.m.

  • Invited Manufacturers Hilti, Inc.

Molly Bolt Co.

Ramset/ITW/ Red Head Richmond Screw Anchor Co., Inc.

Tech. Services - Nuclear, Ramset Division - OLIN TRW Assemblies and Fasteners Group Nelson Stud Division

I' MAY 0 1988 1

4

{

[

i Principal Subjects of Presentations l

1 r

j I.

Describe your anchor products, their use, and the design reconenendations

.j provided to your customers.

i II. Does the "five diarreters" or other edge distance criterion apply to your anchor products? Provide justification for your answer.

f

)

)

!!I. Describe any tests conducted by your organization that provides additional information regarding shear capacity reduction as a function of edge distance.

IV. Provide a list of known nuclear power facilities that use your anchor products.

V.

Describe your company's fatest reconenendations regarding edge distance j

control and their bases, j

1 VI. Approximately what percentage of your type of anchors are possibly affect-

]

ed by the "edge distance" issue?

l VII. Present your perspective of the "edge distance" issue.

i f

i 1

i i

4 i

i

)

I 1

4 i

)

l 1

.