ML20154D754
| ML20154D754 | |
| Person / Time | |
|---|---|
| Issue date: | 05/13/1988 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Bernero R, Paperiello C, Ross D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| References | |
| REF-GTECI-103, REF-GTECI-NI, RTR-NUREG-654 NUDOCS 8805190328 | |
| Download: ML20154D754 (2) | |
Text
_ - - _ _
I
/
'o UNITED $TATES g
[
g NUCLEAR REGULATORY COMMISSION r,
W ASMG T ON. D. C. 20H6 g+....,/
May 13, 1988 MEMORANDUM FOR:
Robert M. Bernero, NMSS Carl J. Paperiello, RIII Denwood F. Ross, RES Joseph Scinto, CGC James H. Sniezek, NRR FROM:
Edward L. Jordan, Chairman Committee to Review Generic Requirements
SUBJECT:
CRGR MEETING NO. 136 REVISED AGENDA l
The Committee to Review Generic Requirements (CRGR) will meet in the afternoon l
on May 19, 1988, in Room 6110 MNBB.
The agenda is as follows:
1-2 p.m.
The CRGR will continue their review of the Commission Paper on Standardization of Advanced Reactors begun at Meeting 133 and continued at Meeting 135.
(A revised draft Commission Paper is enclosed.)
2-3 p.m.
R. Bosnak will present for CRGR review a proposed resolution of Generic Issue 103, "Design for Probable Maximum Precipitation."
(The review package was transmitted via memo dated May 6.)
3-4 p.m.
B. Sheron will present for CRGR review revision to the ECCS rule contained in Appendix K and Section 50.46 of 10 CFR Part 50.
(The review package was transmitted via memo dated May 6.)
4-5 p.m F. Congel will present for CRGR review the proposed Final Revision 1 to NUREG-0654, Evaluation Criteria for Review of Offsite Emergency Plans Prepared by Utilities.
(The review package is enclosed.)
If a CRGR member cannot attend the meeting, it is his responsibi!!ty to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.
Persons making presentations to the CRGR are responsible for (1) assuring that 1
the information required for CRGR review is provided to the Committee (CRGR Charter IV.B), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presenta-i tion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (C. Sakenas X24148) and others involved with the presentation.
Division l
Directors or higher management should attend meetings addressing agenda items under their purview.
In accordance with the E00's March 29, 1984 memorandum to the Commission concerning "Forwarding of CRGR Documents to the Public Document Room (PDR),"
the enclosures and other material to be distributed to CRGR members for consideration at this meeting, are considered predecisional information and t
\\ h
)J l 8905190328 080513 I
REVGPNRGCRGQ l
j t
)
l MEETING 136 b
l l l d
will not be released to the PDR until the NRC has considered'(in a public forum) or decided the matter-addressed by the information.
Ortstmal siense age '
- 4. 3. Mtansa, aum EdwardL. Jordan,Chai]rman Committee to Review Generic Requirements cc w/ enclosures:
SECY i
V. Stello, Jr.
cc w/o enclosures:
Commission (5) l J. Lieberman l
S. Ebneter W. Mcdonald i
Regional Administrators W. Parler W. Morris R. Bosnak l
B. Sheron i
F. Congel Distribution: (w/o enclosures)
{
l
.-Central-file.
PDR (NRC/CRGR)
CRGR SF (w/ enc.)
R. Fraley (w/ enc.)
i B. Doolittle (w/ene.)
~
S. Treby i
T. Rehm l
M. Taylor, EDO (w/ enc.)
E. Jordan (w/ene.)
l J. Heltemes (w/ enc.)
J. Conran (w/ enc.)
C. Sakenas (w/ enc.)
i l
l 0FC : AEODCRG3,.:
AE D
- C/CRGR:AE00 :
Q
.....,9 9ng NAME 4Sakenas:cg : CJHe emes : El rdan DATEi 5// E/88 i
5/U5/88 5/t9V88 i
OFFICIAL RECORD COPY
-