i JOSEPH M. FARLIN NUCLEAR PLAMr UNIT 2 l
NARRATIVE SitNARY OF OPERATIONS April, 1988 I
i I
During the month of April, there were no unit shutdowns or significant
]
pwer reductions.
1 l
The follwing major safety-related maintenance was perforined in the month of April:
i 1.
Miscellaneous corrective and preventive maintenance was perforined on the diesel generators.
l i
I a
i 1
I i
1 1
i i
ff
,/
Jl l
1
/
i 8805190269 880430 PDR ADOCK 05000364 i
R DCD
/-
OPERATING DNIA REPOET DOCKET No.
50-364 DNIE 5/4/88 CCMPIEI1!D BY J. D. Woodard
'IELEPiOE (205)899-5156 OPERATING STATUS Notes la Unit Name:
Joseph M. Farley - Unit 2
- 3. Reporting Periodt April, 1988
- 1) Cumulative data since
- 3. Licensed hermal Power (Wt):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross We):
860 commercial operation 50 Design Electrical Rating (Net We): 829
- 6. Maximum Dependable Capacity (Gross MWe):
863.8
- 7. Maximum Dependable Capacity (Net We):
822.8
- 8. If Changes Occur in Capacity Ratings (Items Number 3 2 rough 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A i
- 10. Reasons For Restrictions, If Any:
N/A
'Ihis Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 719 2,903 59,208
- 13. Number Of Hours Reactor Was Critical 719.0 2,903.0 55,796.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 719.0 2,903.0 50,151.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross hermal Energy Generated (MWH) 1,906,960 7,658,453 127,001,725
- 17. Gross Electrical Energy Generated (%H) 629,566 2,546,718 41,749,934
- 18. Net Electrical Energy Generated (%H) 600,708 2,428,570 39,580,308
- 19. Unit Service Factor 100.0 100.0 84.7
- 30. Unit Availability Factor 100.0 100.0 84.7
- 21. Unit Capacity Factor (Using MDC Net) 101.5 101.7 82.0
- 22. Unit Capacity Factor (Using DER Net) 100.8 100.9 80.6-
- 23. Unit Forced Outage Rate 0.0 0.0 5.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICM.ITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMERCIAL OPERATION 08/01/81 07/30/81 i
Form 2/30
l.'
l l
DOCKET No.
50-364 UNIT 2
DATE MAY 4, 1988 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 Motmi April i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (tWe-Net)
(!We-Net) 1 833 17 840 l
2 834 18 833 3
833 19 834 4
834 20 841 5
841 21 837 6
834 22 832 7
841 23 827 8
842 24 826 r
9 842 25 828-c 10 841 26 831 11 841 27 834 12 845 28 840 i
13 842 29 842 14 839 30 804 15 838 31 16 839 INS'IRUCTIONS On this format, list the average daily unit power level in PHe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21
tMIIT suvTDouns AND PoWEm mEDoCTIoEs DoCIET Wo.54-344 vWIT NAfM:
J.
N. FARRET - WIT 2 DATE MAY 4, 1944 CoIW12TED ST J. D. -n mEPon? NoWTE ArmIL TEIEPtoK (2051499-S154 I
I I
I I
I MTBoD or l 1.ZCESBsEE I I
I CANsE & CommECTIVE I
I I
I I ovaxTrom i I suurTxmo I EvEnr i sTsfun i Coneo.E=T I
aCrrow so i
t 5
1.o.
I ante I rres 1 inovasi i mEaso.2 I no== nuCrom' I mE,omT e l Co=*
I CooE I
ETEnr RECness CE I
I i
i i
i i
I i
i i
l ITu.mE 1. Ems so varT sevToowns om sxonzrrCanT ro=Em mEnoCTrans overno TwE nowru or menzi I
I I
I I
I I
I I
I l
i 1
1 I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I I
I I
l l
I I
I I
I I
I I
I I
l-1 I
I i
1 I
I i
i l
I I
I 1
i i
i i
l I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i 1
1 1
I I
I I
i I
I i
1 1
I I
I I
I I
l l
1 1
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 l
-1 1
I I
I I
I I
I I
I I
l l
I I
I I
I I
I I
I I
i I
I I
I i
I i
I l
1 i
i i
i i
i i
l i
I
'Nothed:
Eskibit G-Instructions F3 Forced meeseen ss.*cheduled A-Equipment Failure (Emplaia) 1-neewal for properaties of Data S-Maintenance er Test 2h1 Scram.
Entry shoots for Licensee C-mefueling 3-Antematic scram.
Event mopett(1Em) File (NU EG-D-megulatory mostricties 4-other (Emplais) 0161)
E-operater Training a Livaase Examinaties F-Administrative Eahibit I -Same Source G-operatiemal Error (Emplais) 19/77)
E-Othec (Empletal M Run W
(
i
.l i
r J06DH M. FARLEY NUCLEAR PUWf i
j LNIT 2 NARRATIVE St)ttARY OF OPERATIONS 1
April, 1988 i
t 1
During the month of April, there were no tmit shutdowns or significant i
power reductions, j
i l
The following major safety-related amintenance was performed in the month i
)
of April' t
j 1.
Miscellaneous corrective and preventive maintenance was perfonned on l
the diesel generators.
i I
i I
I l
l l
r i
r i
f i
s i
a f
.i l
i J
l I
i l
4 l
)
1 a
l 1
i
OPERATING DATA REPORT DOCKET NO.
50-364 DA'IE 5/4/B8 CGEPIXI1D BY J. D. Woodard
'ITLEPHCNE (205)899-5156 OPERATING S'IMUS Notes
- 1. Unit Name:
Joseph M. Tarley - Unit 2
- 3. Reporting Period:
April, 1988
- 1) Cumulative data since
- 3. Licensed h ermal Power ( W t):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross We):
860 comercial operation
- 5. Design Electrical Rating (Net We): 829
- 6. Maximum Dependable Capacity (Gross We):
863.8
- 7. Maximum Dependable Capacity (Net We):
822.8
- 8. If Changes Occur in Capacity Ratings (Items Number 3 3 rough 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net We):
N/A AO. Reasons For Restrictions, If Any:
N/A his Month Yr-to-Date Cumm11ative
- 11. Hours In Reporting Period 719 2,903 59,208
- 13. Number Of Hours Reactor Was Critical 719.0 2,903.0 55,796.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 719.0 2,903.0 50,151.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross hertul Energy Generated (&H) 1,906,960 7,658,453 127,001,725
- 17. Gross Electrical Energy Generated (&H) 629,566 2,546,718 41,749,934
- 18. Net Electrical Energy Generated (%H) 600,708 2,428,570 39,580,308
- 19. Unit Service Factor 100.0 100.0 84.T
~
- 30. Unit Availability Factor 100.0 100.0 84.7
- 21. Unit Capacity Factor (Using MDC Net) 101.5 101.7 82.0
- 22. Unit Capacity Factor (Using DER Net) 100.8 100.9 80.6
- 23. Unit Forced Outage Rate 0.0 0.0 5.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estituted Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL EI2C'IRICITY 05/24/81 05/25/81 COPHERCIAL OPERATICN 08/01/81 07/30/81 Form 2/30 I
?
J
1 DOCKrr No. 50-364 J
UNIT 2
l DATE _MAY 4, 1988 i
COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MNo-Net)
(MWe-Net)
~
1 833 17 840 2
834 18 833 3
833 19 834 l
4 834 20 841 l
5 841 21 837 6
834 22 832 7
841 23 827 8
842 24 826 t
9 842 25 828 10 841 26 831 11 841 27 834 12 845 28 840 13 842 29 842 14 839 30 804 15 838 31 16 839 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21
e l
tmIT Sava W5 AND POWER REDUCTIONS DOCIET NO.56-164 UNIT NAfE J.
R. FARLEY - UNIT 2' '
DATE MAT 4, 1948 COMP 12TED ST J.
D. WOOOARD REPORT PuMrTN APRIL TEIEPBOWE (20$l899-5156 l
l l
l l
l l
l j METROD OF l LICENSEE l l
l CAUSE & CORRECTIVE l
l l
l l DURATION l l SNUTTING l EVENT l SYSTEM l COMPONENT l
ACTION TO l
lNO.
l DATE l TYPE l (NOURS) l PEASON l DOWN REACTOR l REPORT 9 l CODE l CODE l
PREVENT RECURRENCE l'
I I
I I
I I
I I
I I
I (TNERE WERE NO UNIT SNUTD0eNt3 OR SIGNIFICANT POWER REDUCTIONS DURING TNE MOfrThi OF APRIL.
l l
1 i
I i
l I
i i
i i
i i
i I
I 1
I i
i i
i i
i i
i i
i i
i i
l I
I i
i i
I I
I I
l i
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I i
1 1
I i
i i
l i
i i
1 i
I i
i I
I i
l i
l i
I I
I I
I I
I I
I I
i I
I i
I I
i I
i l
i i
i i
i i
i i
i i
i i
I i
i i
i 1
1 I
i i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
l l
1 I
I I
I I
I I
I I
I i
i i
l i
i I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I l
1 I
I I
I I
I I
I I
I Mothed:
Exhibit G-Instructions-Fs Forced Reasen 5: Scheduled A-Egulpeent Failure (Explain) 1-Manual for Properaties of Data s-Maintenance or Test 2-Manual Sesam.
Entry shoots for Licensee C-Refueling 3-Automatic Scree.
Event Report (LEmp File (NUREG-D-Regulatory Restriction 4-other (Explain) 0161)
E-operator Training & License Emaoimaties F-Administrative Exhibit I -Same Source G-operational Error (Emplain)
(9/77)
N-Other (Emplain)
l Alabama Power Company 600 North 18th Street Post offge Box 2641 Birmingham, Atabama 352914400 Telephone 205 2501835 hi"Z*e"!,1,een, Alabama Pbwer the scornem ekctrc system May 10, 1988 Docket No. 50-364 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the April 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very truly, cd.>d. k%p R. P. Mcdonald RPfVJGS:mab/1.6 Attachments xct Dr. J. N. Grace l
L Y) i \\
l i
i
,___,_,__.-._m..
.. _,..,. _ _