TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place GEP 0919%
U.S. Nur. lear Regulatory Commission ATTN. Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Mattdr of
)
Docket Nos. 50-327 3
T:nnessee Valley Authority
)
50-328 SEQUOYAH NUCtEAR PLANT (SQN) - REPORT OF COMPLETED LATE COMMITMENTS The purpore of this letter is to report the completion of four comnitments that were not completed by their scheduled due dates.
Each latr, commitment j
was reported by telephone to Joe Brady, of NRC Region II; Jack Donohew, of NRC Office of Special Projects; and the SQN Senior Resident Inspector on or about l
each respective scheduled due date.
l The first commitment, made in Licensee Event Report (LER) 88023, revision 1, i
was to implement a formalized troubleshooting procedure outlining guidelines on what typ3s of troubleshooting are allowed and when they are allowed.
This 4
j commitment was due by July 29, 1988.
The procedure was actually implemented i
on August 4, 1988, which completed this commitment.
l The second commitment, made in the Integrated Design Inspection (Inspection i
Report Nos. 50-327 -328/87-48), was to reevaluate the methodology for I
establishing the maximum and minimum temperatures for mild plant areas.
This
(
commitment was due by August 1,1988.
The completion package for this i
commitment was submitted to SQN Site Licensing on July 26, 1988, but required i
adoittonal documentation. The revised completion package was resubmitted on
(
August 10, 1988, which completed this commitment.
~
The third comitment, made in LER 83097, revision 3, was to issue additional i
l design accuracy data calculations for the containment sump level transmitters to be used a', an operability acceptance criteria check.
This commitment was due by August 10, 1988.
The calculations were actually issued on l
August 19, 1988, which completed this commitment.
The fourth comm;tment, also made in LER 83097, revision 3, was to revise two I
i preventive maintenance procedures to reflect the latest design accuracy data in the acceptance criteria.
This commitment was due by August 17, 1988.
The (t;
procedures, which were delayed because of the third comitment above, were
]
revised by August 19, 1988, which completed this comitment.
1 l
i 8809150318 880909 gDR ADOCK O 7
f I
l[0 j
An Equal opportunity Employer
. SEP 091988 U.S. Nuclear Regulatory Cconission If you have any questions, please telephone M. A. Cooper at (615) 870-6549.
Very truly yours, TENNESSEE V Y AUTHORITY R.
idley, Ma ager Nuclear Licensing and Regulatory Affairs 4
cc: Ms. S. C. Black, Assistant Director for Projects 1VA Projects Olvision U.S. Nuclear Regulatory Comission One White Flint, North j
11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director i
for Inspection Programs j
TVA Projects Olvision U.S. Nuclear Regulatory Connission i
1 Region II t
101 Marietta Street, NH, ! vite 2900 Atlanta, Georgia 30323 l
1 Sequoyah Resident Inspector j
Sequoyah Nuclear Plant l
j 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 4
)
.I l
l l
l
..