itay 11,1938 t
Docket Nos.:
See Distribution DISTRIBUTION ipoctet Fue 7 NRC & LPDRs MEMORANDUM FOR:
George W Knighton, Director PD5 Reading l
Project Directorate V DCrutchfield Division of Reactor Projects - III, GHolahan l
IV, V and Special Projects GKnighton CTrammell FROM:
Charles M. Tramell, Senior Project Manager OGC Project Directorate V EJordan l
Division of Reactor Projects - III, JPartlow l
IV, Y and Special Projects 1
SUBJECT:
SUMMARY
OF MEETING HELD ON MAY 2, 1988 WITH CE OWNERS GROUP RE: GL 87-12. "LOSS OF RESIDUAL HEAT REMOYAL WHILE RCS IS PARTIALLY FILLED" On May 2, 1988, the NRC staff met with representatives of the Combustion Engineering Owners Group (CE) to discuss the above-captioned matter.
The meeting was held pursuant to notice issued on April 22, 1968. Attendees at the meeting are shown in the enclosure.
l The NRC staff explained that for the most part licensee responses to Generic i
Letter 87-12 were not adequate snd did not reflect a good understanding of the issues raised in the letter. The NRC staff has assigned a high priority to this generic issue because of the relatively high probability of core damage while the RCS is in the drained-down condition.
The NRC staff is considering a spectrum of additional actions to address this generic issue. Possible actions involve improved instrumentation, procedures, equipment availability, avoiding maintenance / testing that could affect reactor vessel water level inventory, containment closure and analyses. All of these possibilities were discussed with the group, as well as their associated feasibilities and impacts on operations.
original signed by Charles M. Trammell, Senior Project Manager Project Directorate Y Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
Attendees i
cc: w/ enclosure i
See ne t page
\\
/
QP/PDV i
09 F:PDV CTramell:dr G6(
- 11 ton S/{!/88 5/j /88 l
(
8805190134 080511 PDR TOPRP ENVC-c
!!ay ll, 1933 Docket Nos.: See Distribution DISTRIBUTION Decket Filt NRC & LPDRs MEMORANDUM FOR:
George W. Knighton, Director PD5 Reading Project Directorate V DCrutchfield Division of Reactor Projects - III, GHolahan IV, V and Special Projects GKnighton CTranwell FROM:
Charles M. Trammell, Senior Project Manager OGC Project Directorate V EJordan Division of Reactor Projects - III, JPartlow IV, Y and Special Projects
SUBJECT:
SUMMARY
OF MEETING HELD ON MAY 2, 1988 WITH CE OWNERS GROUP RE: GL 87-12, "LOSS OF RESIDUAL HEAT REMOVAL WHILE RCS IS PARTIALLY FILLED" On May 2, 1988, the NRC staff met with representatives of the Combustion Engineering Cwners Group (CE) to discuss the above-captioned matter.
The meeting was held pursuant to notice issued on April 22, 1988. Attendees at the meeting are shown in the enclosure.
The NRC staff explained that for the most part licensee responses to Generic letter 87-12 were not adequate and did not reflect a good understanding of the issues raised in the letter. The NRC staff has assigned a high priority to this generic issue because of the relatively high probability of core damage while the RCS is in the drained-down condition.
l The NRC staff is considering a spectrum of additional actions to address this generic issue. Possible actions involve improved instrumentation, procedures, equipment availability, avoiding maintenance / testing that could affect reactor vessel water level inventory, containment closure and analyses. All of these possibilities were discussed with the group, as well as their associated i
feasibilities and impacts on operations, l
original signed by Charles M. Tramell, Senior Project Manager Project Directorate V Division of Reactor Projects - III, i
IV, V and Special Projects
Enclosure:
Attendees cc: w/ enclosure See ne t page
\\
/
gP/PDV D
F:PDV CTranrnell:dr J11 ton 5/ /88 5// /88
i Mr. Kenneth P. Baskin San Cnofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 CcCharles R. Kocher, Assistant Mr. Jack McGurk, Acting Chief General Counsel Radiological Health Branch Jarres Beoletto, Esquire State Department of Health Southern California Edison Company Services Post Office Box 800 714 P Street, Office Bldg. 8 Rosemead, California 91770 Sacramento, California 95814 Devid R. Pigott Mr. Hans Kaspar, Executive Director Orrick, Herrington & Sutcliffe Marine Review Cornmittee, Inc.
600 Montgomery Street S31 Encinitas Boulevard, Suite 105
)
San Francisco, California 94111 Encinitas, California 92024 Mr. Robert G. Lacy Mr. Dennis M. Smith, Chief Manager Nuclear Radiological Programs Division i
San Diego Gas & Electric Company Governor's Office of Emergency Sycs.
P. O. Box 1831 State of California San Ciego, California 92112 2800 Meadowview Road Sacramento, California 95832 Resident Inspector / San Onofre NPS U.S. NRC P. O. Box 4329 i
l San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92ti72 l
Chairman Board of Supervisors j
Ccunty of San Diego San Diego, California 92101 Director Energy Facilities Siting Division Energy Resources Conservation &
Cevelopment Connission 1516 - 9th Street Sacramento, California 95814 Regional Administrator, Region V U.S. Nuclear Regulatory Comission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
t.
ENCLOSURE NRC/CE MEETING MAY 2, 1988 NRC CE CWNERS GR0tlP Charles Tramell Jim Gilbert, BG&E Warren Lyon John Lohr, BG&E
-l Jerry Mazetis Walt Windecker, FP&L l
Al Spano Gordan Bischoff, CE 1
K. R. Naidu Phil Richardson, CE Jerry Holman, LP&L Gerry Doney, CE i
Dan Williams, AP&L Joe Williams, BG&E
)