Requests Exemption from Requalification Exam Due to Possible Overlap W/Plant Startup & Restart Training.Exemption Being Requested Until Jan/Feb 1989 Timeframe.Response Requested by 880916 to Support Scheduling of Requalification Training
ML20154C678
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/02/1988
From: Shelton D
TOLEDO EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
1584, NUDOCS 8809140449
Download: ML20154C678 (2)


Text

<

e TOLEDO EDISON A Caterer Ererm Cavay DONALD (1 SHELTON

w. em n - w*,

(419]P49PEO Docket No. 50-346 License No. NPF-3 Serial No. 1584 September 2, 1988 Mr. Thomas E. Hurley Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Vashington, D. C.

20555

Subject:

Requalification Examination Exemption Request

Dear Mr. Murley:

In accordance with 10CFR55.ll, the Toledo Edison Company is requesting an exemption from the requalification written examination and annual operating test requirements outlined in 10CFR55.59 for the Davis-Besse Nuclear Power Station, Unit No. 1.

10CFR55.59 requires that each licensed (otrator and senior operator successfully complete a requalification program (not to exceed 24 months in duration), and pass a comprehensive requalification written examination and an annual operating test.

Based on this requirement, the requalification examination and operating test are currently scheduled to begin in late September, 1988 and conclude in early November, 1988.

Previously, this schedule fell outside the 26 veek fifth refueling outage with startup scheduled for early September, 1988.

However, due to unforeseen problems with the High Pressure Injection nozzles and thermal sleeves, the outage has been extended.

Consequently the requalification exam overlaps with plant startup and restart training. Therefore, an exemption for the requalification written examination and annual operating test is being requested until the January / February, 1989 timeframe to avoid adversely impacting plant startup and restart training.

g,o[

v I

0 THE TOLEDO EDtSON COMPANY EDtSON PL'2A 300 MADISON AVENUE TOLEDO, OH!O 43G52 m

.6 e

a Docket No. 50-346 License No. NPP-3 Serial No. 1584 Page 2 Toledo Edison requests a response by September 16, 1988 to support scheduling of requalification training, examination and testing.

Sincerel yours, CAB / tit cci J. Hannon, Chief, Operator Licensing Branch, NRC A. V. DeAgazio, NRC Davis-Besse Project Manager DB-1 NRC Resident Inspector A. B. Davis, NRC Region III, Regional Administrator G. C. Vright, Chief, Operations Branch, NRC y