ML20154C289
| ML20154C289 | |
| Person / Time | |
|---|---|
| Site: | 07001207 |
| Issue date: | 03/25/1988 |
| From: | Cantwell G NAVY, DEPT. OF |
| To: | Gaskin C NRC |
| Shared Package | |
| ML19302D620 | List: |
| References | |
| 24296, NUDOCS 8805180107 | |
| Download: ML20154C289 (1) | |
Text
(
3
,TT TvN T 30S*
'70 - /20')
p,.~.
g fgF MENT OF THE NAVY-1"la"lL'^*1^,L 8[
US'iRC Aj swAcE wEANNS CENWR
\\\\
DAHL iREN, VIRGINEA 22448 5 i
- W988 >;;
of RECEIVED
\\og 3
T8b""" "
MM surm
/-
MAy >*1988 0-RTW onu cu n,. y 9
From:
Co at$er,nNava Surf ace Warf are n N N h g'artm }
To:
U.S.
asF gulatory CommissA mcs Q
g' i g()g Mail Stop E4 (Mr.
C. Gaskin)
N "' 5'*n
.s Washington, DC 20555 6
i y;
Subj:
REVISED PHYSICAL SECURITY PLAN (WHITE OAK SITE)
Encl:
(1) Physical Security Plan 1.
A revised Physical Security plan for Building 108 of the White Oak Laboratory of this Command is forwarded as enclosure (1).
2.
As of 24 March 1988 the Los Alamos National Laboratory indicated that the largest SNM source (760g PuF4) would be accepted during April of 1988 with the balance of the (PuBe) sources deferred until later in the summer of this year.
3.
We request that this document NOT be placed in the Public Document Room due to information sensitivity.
4.
Our point of contact is Richard T. Whitman at (202)394-3760.
QuMo GEORGE J.
CANTWELL By direction NATSEADET RASO 7
)
C 242 %
--