May 9, 1988
[2.7--
5 MEMORANDUM FOR:
Goutam Bagchi, Chief Structural and Geosciences Branch, NRR FROM:
Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II
SUBJECT:
REQUEST FOR ASSISTANCE l
4 RE:
SEISHIC ISSUES ON SHOREHA,'i Seismic issues appear to be an important consideration in the staff's review of the request by LILCO for authorization to operate Shoreham at power levels up to 25% up rated power. We request assistance from your Branch in our l
review of these matters to assure that the impact of external events (seismic events) on overall risk are properly treated for the 25% power assessment.
We estinate the resource requirements _to be on the order of a few man-days, to be scheduled as soon as possible. A copy of the TACS Worksheet is enclosed.
Our contacts for this activity are Ronnie lo (x21463) and Stewart Brown (x21444).
/s/
Walter R. Butler, Director Project Directorate I-2 Division of Peactor Projects I/II
Enclosure:
As stated 4
cc:
F. Miraglia T. Martin S. Yarga j
L. Shao
)
- 8. 30ger i
J. Richardson I
DISTRIBUTION
- Docket ru e-4 NRC PDR/LPDR PDI-2 Reading WButler SBrown PDI-2/P PDI-2/D SBrown:tr WButler
$~/{/88
[ / /88
)
g5180043 880509 p
ADOCK 05000322 PDR
UNITED STATES
{
g NUCLEAR REGULATORY COMMISSION l
WASHINGTON. D C. 20555
- g
/
May 9, 1988 MEMORANDUM FOR:
Goutam Bagchi, Chief Structural and Geoscierces Branch, NRR FROM:
Walter R. Butler, Director Project Directorate I-?
Division of Reactor Projects I/II
SUBJECT:
REQUEST FOR ASSISTANCE RE:
SEISMIC ISSUES ON SHOREHAM Seismic issues appear to be an irrportant consideration in the staff's review of the request by LILCO for authorization to operate Shoreham at power levels up to 25% up rated power. We request assistance from your Branch in our review of these matters to assure that the impact of external events (seismic events) on overall risk are properly treated for the 25% power assessment.
We estimate the resource requirements to be on the order of a few man-days, to be scheduled as soon as possible. A copy of the TACS Worksheet is enclosed.
Our contacts for this activity are Ronnie lo (x21463) and Stewart Brown (x21444).
Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects I/II
Enclosure:
As stated cc:
F. Miraglia T. Martin S. Yarga L. Shao B. Boger J. Richardson
i Date Prepared: 4/w # /5 F
$0RKREOUESTTDANSMITTAL To: _ 0. @n, ens
, Branch Chief, Srsuerum t dess Branch o.
THRU: M>. /fgrz e (u b' Director, PD
_u.
b, Project Manager, PD m_
FROM: J.Ab4is PLANT:
- fwsre, TAC No./Titie:
- 4 s d es' Description of Review Requested:
/@w/bs w/ vr n# <rse w <
f%D rev<
b M r o m 2 r 9 % / M a w e # 4 S w c r-Requested Target Date:
Basis for Target Date:
Please indicate your acceptance of the Work Request and Target Date by Signature and Assignment of Reviewer (s).
Work Package should be retained by reviewer (s).
Target Date Acceptable:
Yes No Alternative Target Date Branch Chie# Signature:
Date:
~
Section Leader Signature:
Date:
Assigned Reviewer (s): _ /sgs fem 4 RETURN TO:
MAIL STOP:
PHONE:
2 /$9syd
/ M 3/
X 2 / 94'4' If therc are any questions, please call.
(