ML20154C055

From kanterella
Jump to navigation Jump to search
Requests NRC Investigation of Allegations Re Engineering Firm Responsible for Work Done on Nuclear Components & Written Rept of Findings
ML20154C055
Person / Time
Site: Beaver Valley
Issue date: 03/30/1988
From: Heinz J
SENATE, FINANCE
To: Zech L
NRC COMMISSION (OCM)
Shared Package
ML20154C032 List:
References
NUDOCS 8805180024
Download: ML20154C055 (3)


Text

_ _ ~

. .,s... ....,;.....,

.~ . .. .. . ..... ,....4,.., .

  • ll;,',':':.". w ...
',
'.~.::. ',
c.l?/lc;1:;r' '" 's' "::1 M::fD.""."L 0;. "J.:: . "
.~;.
: .w.~.. .. c.::::::::::.t

.:r'. i 2"."n .'s . Mgj((dl$(3([gl$[p3([

,m..... . : .. c . covv . n ; . s.sa

';.^;'..'?.:ll';,i,'t~'!'.T"J;" W*secos DCW5'O March 30, 1988 The Honorable Lando Zech U.S. Nuclear Regulatory Conn ission Washington, D.C. 20555

Dear Chairn an Zech:

I have read with sone disn ay about work done years ago at Duquesne Light's Beaver Valley nuclear plant. It has been reported that an engineering firn responsible for n illions of dollars worth of work done on nuclear con ponents of the facility n ay have been working beyond its capabilities. Such allegations cause ne grave concerns for the safety of people of waitern Pennsylvania. ,

I understand that Nur:1 ear Regulatory Conn ission (NRC) is reviewing the allegations of shoddy work to deternine whether NRC regulations were violated and whether a safety risk exists or has ever existed at the Beaver Valley facility. I urge NRC to vigorous investigate the allegations and if necessary take the appropriate enforcenent action against responsible parties. ,

The people of western Pennsylvania deserve assurance fron the NRC that either the allegation is untrue and the Beaver Valley plant is safe or the problen has been identified and will be corrected pronptly so that the Beaver Valley plant is safe. I would appreciate a report, in i writing, fron the NRC clearly describing its findings and 2 solutions if a problen is found. '

Thank you f or your pron pt response to this in portant safety natter.

Sincerely, i l -

.s

( l Q =-

l. s Joh Hein (

{

lini ed States Senato JH: pap i

8805180024 080510 l PDR A00CK 05000334  !

P PDR i

g

( 3 (

o g

o UNITED STATES NUCLEAR REGULATORY COMMISSION t ..

rI wAssiNoTon. o. c. 20sss

        • / ,

EDO PRINCIPAL CORRESPONDENCE CONTROL FROM: DUE: 04 88 EDO CONTROL: 003617 DOC DT: 03/30/88 SEN. JOHN HEINZ t FINAL REPLY:

[Jf TO: 44 3gu A, CHAIRMAN ZECH ot .h FOR SIGNATURE OF ** P IORITY ** SECY NO:

CHAIRMAN DESC: ROUTING:

SAFETY PROBLEMS AT BEAVER VALLEY STELLO TAYLOR DATE: 04/12/88 REHM ASSIGNED TO: NRR CONTACT: MURLEY RUSSELL -

- - - LIEBERMAN HAYES SPECIAL INSTRUCTIONS OR REMARKS: MURRAY ,

NRR RECEIVED: APRIL 12, 1988 ACTION: -DRPR:VARGA _

1 I

NRR ROUTING: MURLEY/SNIEZEK m

~

3T10N MIRAGLIA MARTI" GIaESeIE DUET 0 MRR DIRECTOR'S 0p, BOSSBURG y

$Y gy, ;jn w m~> a, ju > g ea7 l

J l

l

. . g *

. , . m.

64099El%T$l% '(B.I (mA...t

$EU!S'ik'h* *.1*U. .e $ $ *is!.$"*

".':.'Msi.17'L, T.l'c":.:G: .R.'"

.' f

@ 'e'. s'N 'i $',',, I 0,'.' " " ' '' " "*

i i ,. N 0k(EN h(OIES h ENSIE '

  • " **l., .EI11'N"e %'7$7,'p**

ce w nisc o%4%c W A$mmof oN. OC 20510 March 30, 1988 The Honorable Lando Zech U.S. Nuclear Regulatory Conn ission Washington, D.C. 20555

Dear Chairnan Zech:

I have read with sone disn ay about work done years ago '

at Duquesne Light's Beaver Valley nuclear plant. It has been reported that an engineering firn responsible for a illions of dollars worth of work done on nuclear conponents of the facility nay have been working beyond its capabilities. Such allegations cause ne grave concerns for the safety of people of western Pennsylvania. s I understand that Nuclear Regulatory Conn ission (NRC) f

_ is reviewing the allegations of shoddy work to deternine

~

_) whether NRC regulations were violated and whether a safety

  • risk exists or has over existed at the Beaver Valley  ;

facility. I urge NRC to vigorous investigate the '

allegations and if necessary take the appropriate ,

enforcenent action against responsible parties. '

The people of western pennsylvania deserve assurance

! fron the NRC that either the allegation is untrue and the Beaver Valley plant is safe or the prob *ien has been identified and will be corrected pecn ptly so that the Beaver Valley plant is safe. I would appreciate a report, in writing, fron the NRC clearly describing its findings and solutions if a problen is found, i

Thank you f or your pron pt response to this in por ta nt

] safety natter. l Sincerely,

(

'O ..

"'RLs (,i t n l Joh Hein '\ ,

Uni ed States Senato l 4

[ .. Rec'd O!! EDO I Date

" I' [X Eco---003617 cj,,

4/6...To EDO to Prepare Response for Signature of Chairman..Date due Comm: April 20...Cpys to:

- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _