ML20154B165

From kanterella
Jump to navigation Jump to search
Notification of 880914 CRGR Meeting 146 to Discuss Proposed Policy Statement on Work Hours.Member Not Able to Attend Must Alternate W/Crgr Approved Member
ML20154B165
Person / Time
Issue date: 09/02/1988
From: Jordan E
Committee To Review Generic Requirements
To: Bernero R, Goldberg J, Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
NUDOCS 8809130254
Download: ML20154B165 (2)


Text

_

d'

g..e e
  • /

UNITED $TATES 81 e ][,1 NUCLE AR REGULATORY COMMISSION v4 wasmo ros. o. c. rosst 5, '"... /

SEP 0% bed MEMORANDUM FOR:

Robert M. Bernero, NMSS Jack R. Goldberg, OGC Carl J. Paperiello, RIII Denwood F. Ross, RES James H. Sniezek, NRR FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

CRGR MEETING N0. 146 The Committee to Review Generic Requirements (CRGR) wi meet in the afternoon on Wedneuday, Septenbar 14, 1988 in Room MNBB 6507.

Tt agends is as follows:

1-2 p.m.

Jack Roe (NRR) will present for CRGR review a proposed policy statement on work hours.

(The review package is enclosed.)

2-3 p.m.

W. Houston (RES) will present for followup review by CRGR the draft Reg. Guide 1.9, Rev. 3, "Selection, Design, Qualification, Testing and Reliability of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants."

(The review package is enclosed.)

3 4 p.m.

B. Morris (RES) will present for CRGR review the proposed rule entitled, "Storage of Spent Nuclear Fuel in NRC-Approved Storage Casks at Nuclear Pcwer Plants.

(The review package is enclosed.)

4-5 p.m.

B. Morris (RES) will present for CRGR review the proposed rule on maint, nance. (The review package will be forwarded as soon as it is available.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is e.pproved by the CRGR Chairman, attends the meeting.

Persons making presentr.tions to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Cornmittee (CRCR Charter - IV.8), (2) coordinating and presenting views of other offices. (3) as appropriate, assuring that other offices are represented during the presenta-tion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (C. Sakenas, X24148) and others involved with the presentation.

Division Directors or higher management should attend neetings addressing agenda items under their purview, In accordance with the ED0's March 29, 1984 remorandum to the Comissioti concerning "Forwarding of CRGR Documents to the Public Document Room (POR),"

f the review packages for items scheduled at this reeting, which contain

'/

i l

i, l

8309130254 000702 T

r l

PDR REVCP NRCCRCH 3

v y}

'.)

l MEETING 146 PNV a

u l

e, so

.g.

predecisional information, will not be released to the POR until the NRC has censidered (in a pblic forum) or decided the matter addressed by the information.

e d hisinni sismos W

~O S. J. -

-.. g u

Edward L. Jordan, C ai

.n Committee to Review Generic Requirements

Enclosures:

As stated cc w/ enclosures:

SECY V. Stello, Jr.

Distribution:

E. Jordan J. Heltemes J. Conran C. Sakenas R. Fraley E. Rossi (w/o enc.)

C. Berlinger (w/o enc. )

8. Doolittle (w/o ene.)

CRGR CF (w/o enc.)

CRGR SF

5. Treby (w/o ene.)

J. Hoyle (w/o enc.)

H. Taylor, OECO POR (NRC/CPGR) (w/o enc.)

Central File (w/o enc.)

l l

l i

l AEOD; A 09:

C/C bbC nai e icg C

mes ELJo( n 9/c J/88

.Qj /83 9/t t

I l

-