Text
.
. -
.
.-
.
--
...
.
--
_ . _ .
- _ _ - .--
1
.
-..
l
'
i
September 28, 1998
Mr. T. C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
Seabrook Station
North Atlantic Energy Service Corporation
clo Mr. Terry L. Harpster
P. O. Box 300
- Seabrook, NH 03874
5
SUBJECT:
SEABROOK CIRCUIT BREAKER INSPECTION REPORT NO. 50-443/98-07
Dear Mr. Feigenbaum:
This letter refers to circuit breaker team inspection conducted from August 3 - 7,1998 at
the Seabrook Station. The purpose of the inspection was to determine whether activities
authorized by the license were conducted safely, and in accordance with NRC
requirements.' Durir.g the exit meeting at the conclusion of the inspection on August 8,
1998, tha findings were discussed with you and other members of your staff.
The inspection was directed toward areas important to public health and safety. The areas
examined during this inspection included your medium-voltage and low-voltage circuit
breaker maintenance program, including procedures and calculations, operating experience
review, vendor manual and interface, and your self-assessment audit in these areas.
Within these areas, the inspection consisted of selective examinations of procedures, and
representative records, interviews with personnel, and observation of activities in progress.
I I
'
.The inspection team determined that your overall breaker maintenance program was good.
1
Your recently completed self-assessment audit for the medium-voltage and low-voltage
lc
breakers was thorough and your response to the findings had resulted in significant
,k
improvement in the breaker vendor interface program. Your control voltage drop
calculations wars conservative and were generally thorough and of good quality.
- However, the team identified that your reviews of NRC Information Notices were, in some
'
cases, narrowly focused. Since the team only reviewed breaker-related notices, you may
\\
want to determine whether this issue is more generally applicable to your operating
'
experience review program.
No response to this letter is required, and your cooperation with us in this matter is
appreciated. If you have any questions or comments, please call me at (610) 337-ti359 or
Bill Ruland at (610) 337-5376.
1
i
9810050114 980928
O
ADOCK 05000443
"
,
G
,
,
b
.
...
.-
-. -
.-
-
..
.
T. Feigenbaum
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Sincerely,
ORIGINAL SIGNED BY:
James T. Wiggins, Director
,
Division of Reector Safety
Docket Nos. 50-443
License No. NPF-86
Enclosure: NRC Inspection Report 50-443/98-07
cc w/ encl:
B. D. Kenyon, President - Nuclear Group
J. S. Streeter, Recovery Officer - Nuclear Oversight
W. A. DiProfio, Station Director - Seabeook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
D. E. Carriere, Director, Production Services
L. M. Cuoco, Senior Nuclear Counsel
W. Fogg, Director, New Hampshire Office of Emergency Management
D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire
D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power Corporation
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
Scacoast Anti-Pollution League
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
W. Meinert, Nuclear Engineer
,
.
..
.-
.
.
. . . ~ . . .
.
~. .
. . - . - . . - . . - . . - . .. -
. - - .
.
.
T. Feigenbaum
3
Distribution w/encI-
1
!
Region i Docket Room (with cor; urrences)
L
PUBLIC
l'
Nuclear Safety information Center (NSIC)
L
NRC Resioent inspector
L~
H. Miller, RA/W. Axelson, DRA
l
C. Cowgill, DRP
l
R. Summers, DRP
l
C. O'Daniell, DRP
!
J. Wiggins, DRS
L. Nicholson, DRS
C. Miskey, DRS
Distribution w/enci (VIA E-MAIL):
B. McCabe, OEDO
,
,
'
R. Correia, NRR (RPC)
'
l-
F. Talbot, NRR
D.- Screncl, PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCDESK
DOCUMENT NAME: G:\\EEB\\CHEUNG\\ SEA 9807.lNS
n - .
ww.
. - e w:c.co m .n - e.
r.c
.n - -.
r.
m.m
OFFICE
Rl/DRS
l6 Rl/DRP // (jj
Rl/DRS
lG Rl/DRS
l,
l
n
_
NAME
LCheung
CCowgMI
'
WRuland *
JWiggins 3M
DATE
09/28/98
09/g/98
09PJ98
09/25/98
09/ /98
'
OFFICIAL RECORD COPY
I
M + "/ M A
.
<
!-
,
.
._
._,
.
.