ML20154B116
| ML20154B116 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/09/1988 |
| From: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| WM-88-0126, WM-88-126, NUDOCS 8805170071 | |
| Download: ML20154B116 (1) | |
Text
c t
LF CREEK W@NUCLEAP, OPERATING CORPOR Bart D. Withers President and car execuin. orr<.,
May 9, 1988 WM 88-0126 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555
Reference:
Letter dated April 8,1988 from L. J. Callan, NRC to 3. D. Withers, WCNOC
Subject:
Docket No. 50-482:
Inspection Report 50-482/87024 Equipment Qualification Inspection Centlemen:
The purpose of this letter is to establish the revised submittal date for the response to violations in Inspection Report 50-482/87024 concerning the Equipment Qualification Inspection cond uc ted at Wolf Creek Generating Station. Based on discussions between Mr. L. J. Callan, Director, Division of Reactor Projects and Mr. O. L. Maynard on May 6,1988, Wolf Creek Nuclear Operating Corporation (WCNOC) will respond to the notice of violations on or before May 23, 1988.
The Reference transmitted the Equipment Qualification Inspection Report and required a response to the violations indentified in the Inspection Report.
Due to the resources required to address an NRC identified equipment qualification concern on Bunker Ramo Electrical Penetrations, additional time is required to address the violations.
Very truly yours, B. D. Withers President and Chief Executive Officer BDW/jad cc:
B. L. Bartlett (NRC)
L. J. Callan ( NRC)
R. D. Martin (NRC)
P. W. O' Connor ( NRC), 2 f60I t0 PO. Box 411/ Buritngton, KS 66839 / Phone: (316) 364 8831 8805170071 880509 PDR ADOCK 05000482 o