Commonwealth Edison Co.
Braidwood Station RR 1, Box 81 Braceville, IL 60407 Telephone 815/458-2801 February 24, 1986 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
SUBJECT:
Braidwood Station Units 1 and 2 Supplemental Response to Inspection Report Nos. 50-456/85-008 and 50-457/85-008 NRC Docket Nos. 50-456/50-457
REFERENCE:
(a) J.J. Harrison letter to C. Reed dated April 18, 1985 (b) D.L. Farrar letter to J.G. Keppler dated May 15, 1985
Dear Mr. Keppler:
This letter supplements our Reference (b) response to part b of the violation identified in the Reference (a) Inspection Report (Item 456/85-008-10b).
In assessing the adequacy of the implementation of corrective actions identified in response to this item, it was determined that additional action should be taken. The enclosure to this letter documents that action.
Should you or your staff have any further questions on this matter, please direct them to this office.
Very truly yours, l
8603040212 860224 PDR ADOCK 05000456 O
PDR L.O. DelGeorge Assistant Vice President LOD /pav Enclosure cc: NRC Resident Inspector - Braidwood
.FEB 2 61986 12511
'f
&bul
e ENCLOSURE supplemental Response to Inspection Report 456/85-008 and 457/85-008 Item 456/85-008-10b The Braidwood Project Construction Department (PCD) has assessed the adequacy of using tape as a protective covering method. PCD has directed Phillips, Getschow Company (PGCo) to utilize tape only as a protective covering for' temporary storage of pipe and valves. PGCo was directed to utilize metal, plastic, wood or other durable saterial which is adequately secured with tape or other qualified adhesive as protective covering for pipe, valves, etc. in non-temporary storage. PGCo will initiate any necessary procedure changes as well as any remedial field work to upgrade protective covers for pipe, valves, etc.
Implementation of these measures is expected by March 7, 1986.