ML20154A860
| ML20154A860 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/01/1988 |
| From: | Shelton D TOLEDO EDISON CO. |
| To: | Hannon J Office of Nuclear Reactor Regulation |
| References | |
| 1-830, GL-88-13, NUDOCS 8809130114 | |
| Download: ML20154A860 (3) | |
Text
. - _ _
u TOLEDO EDISON A Carterrr Energ, Capre DONALO C. SHELTON
- u. m.,u..e staire exo Docket No. 50-346 License No. NPF-3 Serial No. 1-830 Septembeir 1,1988 Mr. John Hannon, Chief, Operator Licensing Branch 0VFN-10D-18 United States Nuclear Regulatory Commission Vashington, D. C.
20555 Subj ect :
Response to Generic Letter 88-13, Operator Licensing Examinations
Dear Mr. Hannon:
As requested by Generic Letter 88-13, Operator Licensing Examinations, dated August 8, 1988 (Log No. 2673), enclosed is the Operator Licensing Examination schedule and the Requalification Examination schedule for the Davis-Bess."
Nuclear Power Station, Unit No. 1, covering fiscal years 1989, 1990, 1991, and 1992.
Sincerely yours,
(/b CAB / tit j
Enclosures cc: DB-1 NRC Resident Inspector A. !$. Davis, NRC Region III; Regional Administrator t
880933o3 i
000902 PDR p,99c. 05000346 V
PNV 4
0 1
d 0 I C '\\\\
THE TOLEDO ED' SON COA.'PANY EDSON PLAZA 300 MADGON A\\PJUE TOLEDO. OH O 43652
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Facility Davis-Besse NRC Region III 1
i FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92) 1.
Date 1/30/89 5/90 11/90 12/91
- RO 10 10 0
0 i
f
- SRO Instant 8
10 2
2
- SRO Upgrade 2
4 4
4 l
- SRO Limited 0
0 0
0 I
2.
Date 9/25/89 N/A 7/91 9/92
- RO O
O 10 10 l
- 5R0 Instant 15 0
2 2
)
- 5R0 Upgrade 4
0 4
4
- SRO Limited 0
0 0
0 t
Please indicate initial cold license examinations by placing an asterisk (*)
f by the date.
Please indicate examinations intended to extend an Operator's i
license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three R0 candidates with no previous license are to be examined on both Units One and Two and five
~
RO candidates licensed on Unit One are to be examined to extend their licenses to
{
Unit Two, then indicate "R0 3.5".")
1 I
i i
l t
i
.J
e, s
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FOR)AT Facility Davis-Besse flRC Region III FY 1989
- FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)
(10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92) 1.
Date 10/7/88 Date 10/89 Date 10/90 Date 10/91 2.
Da te 10/21/88 Date 10/89 Date 10/90 Date 10/91 3.
Da te 11/4/88 Date 11/89 Date 11/9c Date 11/91 4.
Date N/A Date N/A Date N/A Date N/A
- Toledo Edison is planning on submitting an exemption request to extend the October / November 1988 requalification exam until January / February 1989 to minimize impact on the fifth refueling outage.
.