ML20154A133
| ML20154A133 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 09/29/1998 |
| From: | Assa R NRC (Affiliation Not Assigned) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| References | |
| TAC-M97546, TAC-M97547, TAC-M97548, TAC-M97549, NUDOCS 9810020204 | |
| Download: ML20154A133 (5) | |
Text
1 l
l-September 29, 1998 Mr. Oliver D. Kingsley, President -
l Nuclear Generation Group l_'
Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. M97548, M97549, M97546 AND M97547)
Dear Mr. Kingsley:
1 On December 13,1996, Commonwealth Edison Company (Comed) proposed to amend the technical specifications (TS) for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, to be consistent with the improved TS in NUREG-1431, " Standard Technical Specifications - Westinghouse Plants," Revision 1. During the course of our review, we have identified the need for further information as discussed in the enclosed request for additional Information (RAI). This request seeks to clarify Section 3.3.2.
j-To support the NRC staff'c review schedule, your written and electronic response to this RAI is l
requested within 30 days of the date of this letter.. Should you have any questions, please contact me at (301) 415-1391.
L Sincerely, ORIG. SIGNED BY Ramin R. Assa, Project Manager Project Directorate 11l-2 Nk nan o!oo! 54 Division of Reactor Projects - lil/IV lfl P
PDR Office of Nuclear Reactor Regulation I
Docket Nos. STN 50-454, STN 50-455, STN 50-456, STN 50-457 O/
Enclosure:
RAI.
cc w/ encl: See next page DISTRIBUTION:
O Docket Files PUBLIC PD3-2 r/f M. Jordan, Rlll E. Adensam (EGA1) S. Richards R. Assa C. Moore J.~ Hici man ACRS, T2E26 OGC S. Bailey C. Harbuck DOCUMENT NAME: G:\\CM\\ BRAID-BY\\BB97547.RAI l'
' To receive a copy of this document, IndiceNn the box: "C" = Copy without endosures "E" = Copy with endosures "N" = No copy i
l OFFICE PM/PQ5'$ -
f 40 3-2 (7, D/PD3-2 0
a l NAME RAssa XA CBAools SRichards 4W hhb DATE-09/4 /98 09LQ98 09/fl /98
[~
. OFFICIAL RECORD COPY A
r rarg g
i UNITED STATES l
s j
NUCLEAR REGULATORY COMMISSION i
2 WASHINGTON, D.C. 20545 4001
%,*****p$
September 29, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. M97548, M97549, M97546 AND M97547)
Dear Mr. Kingsley:
On December 13,1996, Commonwealth Edison Company (Comed) proposed to amend the technical specifications (TS) for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 i
and 2, to be consistent with the improved TS in NUREG-1431, " Standard Technical Specifications - Westinghouse Plants," Revision 1. During the course of our review, we have identified the need for further information as discussed in the enclosed request for additional information (RAl). This request seeks to clarify Section 3.3.2.
I To support the NRC staff's review schedule, your written and electronic response to this RAI is requested within 30 days of the date of this letter. Should you have any questions, please contact me at (301) 415-1391.
Sincerely,
& FAB Ramin R. Assa, Project Managar Project Directorate 111-2 Division of Reactor Projects - Ill/IV l
Office of Nuclear Reactor Regulation I
Docket Nos. STN 50-454, STN 50-455, STN 50-456, STN 50 457
Enclosure:
RAI cc w/enci: See next page l
l
I O. Kingsley Byron /Braidwood Stations Commonwealth Edison Company cc:
Ms. C. Sue Hauser, Project Manager George L. Edgar l
Westinghouse Electric Corporation Morgan, Lewis and Bochlus i
Energy Systems Business Unit 1800 M Street, N.W.
Post Office Box 355 Washint/.on, DC 20036 l
Pittsburgh, Pennsylvania 15230 Attomey General Joseph Gallo 500 S. Second Street Gallo & Ross Springfield, Illinois 62701 1250 Eye St., N.W., Suite 302 Washington, DC 20005 lilinois Department of Nuclear Safety Office of Nuclear Facility Safety Michael I. Miller, Esquire 1035 Outer Park Drive Sidley and Austin Springfield, Illinois 62704 One First National Plaza Chicago, Illinois 60603 Commonwealth Edison Company Byron Station Manager Howard A. Learner 4450 N. German Church Road Environmentallaw and Policy Byron, Illinois 61010-9794 Center of the Midwest 35 East Wacker Dr., Suite 1300 Commonwealth Edison Company Chicago, Illinois 60601 Site Vice President - Byror; 4450 N. German Church Road U.S. Nuclear Regulatory Commission -
Byron, Illinois 61010-9794 Byron Resident inspectors Office 4448 N. German Church Road U.S. Nuclear Regulatory Commission Byron, Illinois 61010-9750 Braidwood Resident inspectors Office RR 1, Box 79 Regional \\dministra'.vr, Region lli Braceville, Illinois 60407 U.S. Nuclecr Regulatory Commission 801 Warrenville Road Mr. Ron Stephens Lisle, Illinois 60532-4351 lilinois Emergency Services Ms. Lorraine Creek _.
and Disaster Agency 110 E. Adams Street RR 1, Box 182 Springfield, Illinois 62706 Manteno, Illinois 60950 Chairman Chairman, Ogle County Board Will County Board of Supervisors Post Office Box 357 Will County Board Courthouse Oregon, Illinois 61061 Joliet, Illinois 60434 l-Mrs. Phillip B. Johnson Commonwealth Edison Company l
1907 Stratford Lcne Braidwood Station Manager l
Rockford, Illinois 61107 RR 1, Box 84 Braceville, Illinois 60407 l
I i-
7 O. Kingsley Commonwealth Edison Company Byron /Braidwood Stations Ms. Bridget IJttle Rorem Appleseed Coordinator 117 N. Linden Street Essex, Illinois 60935 Ms. Irene Johnson, Licensing Director
' Document Control Desk-Licensing Nuclear Regulatory Services Commonwealth Edison Company Commonwealth Edison Company 1400 Opus Place, Suite 400 Executive Towers West lli Downers Grove, Illinois 60515 1400 Opus Place, Suite 500 Downers Grove,IL 60515 Commonwealth Edison Company Site Vice President - Braidwood Commonwealth Edison Company RR 1, Box 84 Reg. Assurance Supervisor-Braidwood Braceville,IL 60407 RR 1, Box 79 Braceville, Illinois 60407 Mr. David Helwig Senior Vice President Commonwealth Edison Company Commonwealth Edison Company Reg. Assurance Supervisor-Byron Executive Towers West til 4450 N. German Church Road 1400 Opus Place, Suite 900 Byron, Illinois 61010-9794 Downers Grove, IL 60515 Mr. Michael J. Wallace Mr. Gene H. Stanley Senior Vice President PWR's Vice President Commonwealth Edison Company Commonwealth Edison Company Executive Towers West lli Executive Towers West 111 1400 Opus Place, Suite 900 L
1400 Opus Place, Suite 900 Downers Grove,IL 60515 Downers Grove, IL 60515 t
L Mr. Steve Perry BWR's Vice President Commonwealth Edison Company i
Executive Towers West lll 1400 Opus Place, Suite 900 Downers Grove,IL 60515 V
l Mr. Dennis Farrar i
Regulatory Services Manager Commonwealth Edison Company 51ecutive Towers West til
%00 Opus Place, Suite 500 Downers Grove,IL 60515 l
i
Byron & Braldwood improved TS Review Comments ITS 3.3.2 3.3.2-01 CTS Table 3.3-3 Notation #
CTS Table 3.3-1 Functional Unit 1.d and 1.e ITS Table 3.3.2-1 Footnote a ITS Table 3.3.2-1 Function 1.d and 1.e CTS Table 3.3-3 Notation # differs from ITS Table 3.3.2-1 Footnote a with no discussion of change. Comment: Revise submittal to either include this note in the ITS or provide DOC to support the difference.
Comed Response:
3.3.2-02 DOC A.22 CTS Table 3.3-4 Functional Unit 6.f i
DOC A.22 does not describe or discuss the actual change to CTS Table 3.3-4 Functional Unit 6.f. It references a Comed letter with no supporting information. Comments: Provide more specific DOC for A.22 in reference to the change to CTS Table 3.3-4 Functional Unit 6.f.
4 Comed Response:
3.3.2-03 DOC A.17 CTS Table 4.3-2 Insert 3.3-37A ITS SR 3.3.2.9 Note STS SR 3.3.2.8 JFD P.53 The ITS SR 3.3.2.9 Note has deleted the term "... for manual initiation functions" in which JFD P.53 explains. The CTS Table 4.3-2 Insert 3.3-37A has inserted the note which includes the term "... for manual initiation functions" in which DOC A.17 also explains. The edits as well as the associated JFD and DOC conflict with each other. Comment: Revise submittal to either include or not include this note and make the JFS and DOC consistent with each other.
Comed Response:
1 BB2_CR_3.302 September 29,1998
-.