MONTHYEARML20211P4761999-09-0909 September 1999 Discusses Arrangements Made Between Recipient & Pj Isaac for Administration of Operator Licensing Exams at Univ of Florida Reactor Scheduled for Week of 991011 ML20211B3531999-08-16016 August 1999 Accepts Ltr as Formal Notification That JW Powers Will No Longer Be Performing Licensed Activities for Facility ML20216D3041999-07-20020 July 1999 Submits Rept of Change in Facility Organization at Level 1 Which Is Level Responsible for Univ of Fl Training Reactor (Uftr) Facility Licenses,Charter & Site Administration ML20209C4971999-06-29029 June 1999 Forwards 14 Day Rept on Potential TS Violation Re Failure to Measure Adequately Secondary Flow Limiting Safety Sys Setting,Which Was Reported by 990608 & 10 Telcon ML20195J0931999-06-15015 June 1999 Informs That NRR Determined That Revs to Univ of Florida Operator Requalification Plan Submitted by Ltr Dtd 990514, Does Not Alter Intent of Presently Approved Orp.Submitted Orp Considered Acceptable ML20195H5101999-06-0808 June 1999 Documents 990608 Telcon Between T Michaels & J Wolf Re Potential Inadequacies in Checking Secondary Cooling Low Flow Trip.Event May Be Potentially Reportable Occurrence Per TS Sections 4.1 & 6.6.2 ML20195B3981999-05-17017 May 1999 Provides Rept of Significant Change in Facility Organization at Level 3 Which Is Level Responsible for day-to-day Operations of Univ of Fl Training Reactor ML20206U2431999-05-14014 May 1999 Forwards Rev 4 to Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan for July 1999 - June 2001. Changes,Discussed ML20205R0601999-04-16016 April 1999 Ack Receipt of Ltr Dtd 990218,which Encl Rev 11 to Univ of Florida Training Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).NRC Approval Not Required ML20205E4641999-03-29029 March 1999 Forwards Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel ML20207A6051999-02-19019 February 1999 Forwards Rev 11 to Uftr SAR, Dtd Jan 1981 Which Was Initiated as Result of Changes in Personnel Monitoring Badges Supplied to Univ by NVLAP-accredited Supplier.Rev 11 to EP for Uftr, Encl ML20155G8521998-11-0202 November 1998 Forwards Insp Rept 50-083/98-202 on 981006-09.No Violations Noted.No Significant Safety Issues Identified ML20154E1621998-10-0101 October 1998 Forwards Insp Rept 50-083/98-201 on 980908-10.No Violations Noted.Univ of Fl Training Reactor Respiratory Protection Program Found to Conform to Requirements of 10CFR20.1703 ML20236X2691998-08-0303 August 1998 Forwards Rev 2 to Univ of Fl Training Reactor Respiratory Protection Program, Reflecting Changes Necessitated by Updated Univ of Fl Respiratory Protection Program Along W/ Recommendations from NRC Info Notices 97-066 * 98-020 ML20217M6461998-03-27027 March 1998 Forwards Updated Proposal Intended to Meet Requirements of 10CFR50.64(c)(2).Proposal Is Essentially Unchanged Except for Revised Schedule & Presence of Substantive Info on Progress to Date Including Final Fuel Bundle Design ML20203C4261997-12-0303 December 1997 Forwards Amend 22 to License R-56 & Safety Evaluation.Amend Consists of Revs to TS 6.2.5(1) & on Figure 6.1 to Reflect Name Change from Dept of Nuclear Engineering Sciences to Dept of Nuclear & Radiological Engineering ML20216B3501997-10-17017 October 1997 Forwards Pp Changes Which Constitute Rev 10 of Univ of Florida Training Reactor Emergency Plan.Rev 10 Consists of Set of Updates & Revs to 13 Listed Pages ML20211N0381997-10-0707 October 1997 Forwards Explanatory Ltr & Change Pages That Constitute Rev 14 of Univ of Fl Training Reactor Physical Security Plan. Encls Withheld,Per 10CFR2.790(d) ML20217H7881997-10-0606 October 1997 Forwards Corrected Page of Uftr Organizational Chart Submitted W/Amend 22 of Tss,Per 970903 Telcon.Encl Part of Chart Not Intended to Be Changed from Approved TSs ML20217B2391997-09-0909 September 1997 Forwards Insp Rept 50-083/97-201 on 970630-0703.No Violations Noted ML20217P3211997-08-22022 August 1997 Ack Receipt of Forwarding Rev 10 to Univ of Fl Training Reactor Emergency Plan.Rev Does Not Decrease Effectiveness of Emergency Plan.Nrc Approval Not Required ML20198F7511997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20148G3321997-05-29029 May 1997 Forwards Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan, Jul 1997-June 1999 ML20138D8841997-04-21021 April 1997 Informs That Dj Cronin Resigned as Acting Reactor Manager on 970328 & Wg Vernetson Assumed That Position on Same Date ML20140C8631997-04-10010 April 1997 Forwards Rev 10 to Uftr Emergency Plan. Changes Contained in Plan,Discussed ML20137R5231997-04-0808 April 1997 Forwards Most Recent Proprietary Quarterly Log of Security Events for Univ of Fl Training Reactor R-56 License at Univ of Fl.Encl Withheld ML20137G6151997-03-27027 March 1997 Forwards Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel ML20137U6121997-03-25025 March 1997 Informs That NRC Region II Ofc Will Move to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New Ofc Encl ML20137C1731997-03-20020 March 1997 Informs That Encl SRO Certificate Being Forwarded to JW Powers at Univ of Fl.W/O Encl ML20140C7141997-03-17017 March 1997 Forwards Copy of 1995-96 Univ of Florida Training Reactor Annual Progress Rept in Compliance W/Requirements of Section 6.6.1 of Uftr TSs ML20137C1151997-03-17017 March 1997 Forwards Ltr of 1995-96 Univ of Fl Training Reactor Annual Progress Rept ML20137D6361997-03-17017 March 1997 Forwards Rev 10 to Univ of Fl Training Reactor SAR Dtd Jan 1981 Submitted as Part of Last Relicensing Effort.Rev Consists of Changes to Single Pp,Initiated as Result of Comments from Staff Member Checking Matls Re Training ML20140C7221997-02-28028 February 1997 Forwards One Copy of 1995-96 Univ of Florida Training Reactor Annual Progress Rept Per TS Reporting Requirements ML20137C1341997-02-28028 February 1997 Forwards 1995-96 Univ of Fl Training Reactor Annual Progress Rept ML20136C3091997-02-27027 February 1997 Informs of Licensee Failure to Address Major Contributing Factor to Root Cause of Incident That Occurred at Facility on 970113 Re Improper Stack Calibr.Nrc Expects Licensees to Provide Appropriate Mgt Guidance of Licensed Activities ML20135C1231997-02-25025 February 1997 Submits Copy of Results of Operator Initial Examination Conducted at University of Florida on 970210.W/o Encl ML20135C3421997-02-25025 February 1997 Forwards Operator Licensing Exam Rept 50-083/OL-97-01 on 970210-11 ML20149M6731997-01-15015 January 1997 Discusses Potential TS Violation Re Improper Stack Monitor Calibr.Caused by Flawed Procedure That Failed to Correct for Delay of Cs-137 Calibr Source.Performed full-power Reactor Run on 970114 & Found Monitor to Be Properly Calibr ML20132A9721996-12-12012 December 1996 Discusses Arrangements for Written & Operating Exams Scheduled for Wk of 970210.Listed Ref Matl for Exams Requested at Least 60 Days Prior to Exam Date ML20128N4211996-10-10010 October 1996 Forwards Amend 21 to License R-56.Amend Consist of Revs to TS to Permit Submittal of Annual Rept for Activities 6 Months Following End of Uftr Prescribed End of Yr Which Occurs on 960831 ML20128N2971996-10-0303 October 1996 Repts Significant Change in Campus Radiation Control Function That Interacts W/Level 1 Personnel in Order to Facilitate Communications W/Commission ML20117N3891996-09-0909 September 1996 Informs That D Simpkins Will No Longer Be Performing Licensed Activities for Facility ML20117K7881996-09-0404 September 1996 Submits Significant Change in Facility Organization at Level 3,responsible for day-to-day Operation of Uftr ML20116J5751996-08-0909 August 1996 Forwards Annual Progress Rept of Univ of Fl Training Reactor Sept 1994 - Aug 1995 ML20116A0671996-07-19019 July 1996 Submits Response to Violations Noted in Insp Rept 50-083/96-01.Corrective Actions:Facility Administrative Staff Logged Many H in Late June & Early Jul to Generate & Submit First of Two Repts ML20113C9341996-06-21021 June 1996 Provides Explanatory Ltr & Change Pages That Constitute Rev 13 for Univ of Florida Training Reactor Physical Security Plan.W/O Encl ML20101L3451996-03-27027 March 1996 Forwards Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel. Proprietary Info Withheld ML20094D0931995-10-27027 October 1995 Forwards Rev 12 to Physical Security Plan.Second Page Submitted to Assure Complete Current Copy of Univ of Fl Training Reactor.Rev Withheld ML20092G0931995-09-14014 September 1995 Forwards Rev 9 to FSAR for Univ of Fl Training Reactor ML20086M7661995-07-18018 July 1995 Forwards Rev 12 of Physical Security Plan for Univ of Florida Training Reactor Per 10CFR50.54.Encl Withheld 1999-09-09
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20055H8411990-07-19019 July 1990 Submits Decommissioning Rept Info for Reactor,Per 10CFR50.33 & 50.75 Requirements.Funds for Decommissioning Will Be Requested from State of Fl Legislature When Decision to Decommission Facility Made ML20043E5811990-06-0404 June 1990 Advises of Appointment of P Achey as Chairman of Univ Radiation Control Committee,Effective 900412 ML20012C4951990-03-0707 March 1990 Advises That Jv Lombardi New Permanent President of Univ of Florida Effective 900305.President Responsible for Uftr Facility License,Charter & Site Administration ML20005G8231990-01-12012 January 1990 Forwards Rev 5 to Emergency Plan.Page 11-1 Re New Security Response Procedure Incorporated in List of Procedures Primarily for Completeness ML19354D8881990-01-12012 January 1990 Responds to NRC 891218 Ltr Re Violations Noted in Insp Rept 50-083/89-04.Corrective Actions:All NRC Required Surveillances Tracked as to Day of Month Performed to Assure Allowable Surveillance Intervals Not Exceeded ML20248B4791989-09-18018 September 1989 Forwards Rev 6 to FSAR for Univ of Florida Training Reactor, Consisting of Update of Chapter 11 of SAR Based on Internal Review ML20248F1111989-09-15015 September 1989 Advises That 890915 Safety Channel 1 High Voltage Trip Not Violation of Tech Specs But in View of Recent Equipment Problems,Recommends NRC Be Notified for Info Purposes.Trip Will Be Examined at 890919 Safety Review Meeting ML20244B7181989-05-30030 May 1989 Forwards Rev to Upgrade Operator Requalification & Recertification Program for Jul 1989 - June 1991 ML20247B4181989-05-0404 May 1989 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-083/89-01.Corrective Actions:Detailed Radiation Surveys of Vertical Port Area Taken & Documented ML20244D2181989-04-0303 April 1989 Informs of Significant Change in Facility Organization. Mm Criser Replaces RA Bryan as President of Univ & Holds Line Responsibility for Level 1 Administration of Reactor, Facility License,Charter & Site Administration ML20247K7991989-03-27027 March 1989 Forwards Updated Proposal Intended to Meet Requirements of 10CFR50.64(c)(2) for Scheduling of Fuel Conversion ML20246L3851989-02-24024 February 1989 Advises of Failure to Notify NRC of Significant Change in Facility Organization at Level I on 890221.Effective 880801, Wm Phillips Assumed Title of Dean of Univ,College of Engineering ML20235Q5211989-02-21021 February 1989 Informs of Replacement of W Chen W/Wm Phillips as Dean of Univ of Florida College of Engineering ML20196D6341988-11-30030 November 1988 Forwards 1987-1988 Univ of Florida Training Reactor Annual Progress Rept. W/O Encl ML20195F9551988-11-14014 November 1988 Advises That Reactor Safety Review Committee Reviewed & Concluded Potential Violation of Tech Specs,Section 6.3 Re Requirement That Facility Be Operated in Accordance W/Written Procedures,Per 881114 Telcon ML20206J1411988-11-0707 November 1988 Submits Followup on 881104 Event Re Failure of Temp Record to Track Properly & Requiring Unscheduled Shutdown.Probable Cause Isolated & Planned Recovery Will Be Reviewed by Reactor Safety Review Subcommittee within 24 H ML20205R4701988-10-17017 October 1988 Forwards Rev 3 to Emergency Plan,Consisting of Corrected Page 8-4 to Reflect That Other Hosps Now Designated to Handle Crystal River 3 Radiation Accident Victims ML20150B2301988-06-30030 June 1988 Forwards Rev 5 to Univ of Florida Training Reactor FSAR ML20150B6961988-06-13013 June 1988 Advises That Failure of Control Blade Safety 2 Clutch Indicating Lamp Constitutes Ro,Per 880613 Telcon ML20153H4501988-05-0606 May 1988 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-083/88-01.Corrective Actions:Scheduled Ar-41 Measurement Postponed Until Analysis to Assure Conservatism of Present Methodology Documented & Effluent Isotope Counting Planned ML20151V2071988-04-11011 April 1988 Notifies of Recurrence of Failure of Safety Channel 1 During Power Run Conducted for Senior Lab Training Operations Lab. Test Used to Verify Proper Operation of Safety Channel.Test Results Successful & Channel Returned to Normal Operation ML20150F3811988-03-22022 March 1988 Forwards Updated Proposal Re Requirements of 10CFR50.64(c)(2).Updated Proposal Includes Certification That Funding for Conversion Available Through DOE & Tentative Conversion Schedule Based on Fuel Availability ML20196J1521988-03-0707 March 1988 Forwards Revised Amend 17 Tech Spec Pages to 870602 Application for Amend,Per 880205 Request.Rev Addresses Areas of Concern Listed in ML20235H1271987-09-25025 September 1987 Forwards Rev 4 to FSAR as Part of Relicensing Effort.Rev Re Fire Protection & Communications Sys ML20214U9851987-05-29029 May 1987 Forwards Rev 3 to Fsar,Changing Part I Re Radiation Monitoring Concerning Environ Monitoring Sys & Part II Re App 15G as Part of Relicensing Effort.App 15G Will Be Added to SAR to Address Wigner Energy Storage & Graphite Fires ML20215A8971987-05-26026 May 1987 Forwards Std Operating Procedure Uftr SOP-D.5 Re Preparation & Transfer of Reactor Waste Shipments,Per 870423 Response to Violations Noted in Insp Rept 50-083/87-01.No Shipments Will Be Made Until Procedure Reviewed & Approved by NRC ML20214F4681987-05-14014 May 1987 Responds to NRC Re Highly Enriched U/Lowly Enriched U Conversion Schedule.Schedule Shortened by 8 Months as Shown on Encl Reworked Table II (Rev 1).All Analytical Work Will Be Performed in-house ML20210C1721987-04-23023 April 1987 Responds to NRC Re Violations Noted in Insp Repts 50-083/87-01 & 50-083/87-02.Corrective Actions:Produced New Policy Requiring Licensed Shipper & New Procedure to Control Shipment of Waste.No Shipments Until Procedure in Effect ML20205H5331987-03-26026 March 1987 Forwards Proposal Intended to Meet Requirements of 10CFR50.64(c)(2).Proposal Includes Certification That Funding for Conversion Available Through DOE & Tentative Schedule for Conversion ML20205N4101987-03-19019 March 1987 Responds to Violations Noted in Insp Rept 50-083/87-01. Corrective Actions:Notice Describing 10CFR19 & 20 Requirements & Stating Where Info Can Be Found Posted ML20207Q9281987-03-0303 March 1987 Forwards Revs to Emergency Plan,Including Page Corrections to Body of Plan (Pages 5-2,8-1,8-3 & 8-4) & Revs to Emergency Response Procedures SOP-B.1 & SOP-B.2 ML20215B1941986-12-19019 December 1986 Discusses 861211 Event Re Stack Dilute Fan & Core Vent Fan Secured by Actuation of Evacuation Alarm & Evacuation Alarm/ Core Vent Sys Interlocks White Stack Count Rate Approx 300 Cps ML20214V6071986-11-29029 November 1986 Forwards Annual Progress Rept of Univ of Florida Training Reactor,Sept 1985 - Aug 1986 ML20203E1391986-07-18018 July 1986 Forwards Rev 2 Pages for Facility Sar,Per NRC Insp 50-083/86-01 on 860218-21.Revs Concern Sections 7.3 & 7.6 & Figure 1-8 from Chapter 1 Re source-range Detector in Nuclear Instrumentation Channel 1 ML20205P0981986-05-13013 May 1986 Forwards Submitted to Region II Notifying That Js Tulenko,Chairman of Nuclear Engineering Sciences Dept, Holds Level 1 Administrative Responsibility for Facility,Per Tech Specs.Tulenko Should Be Put on Mailing List ML20205P1301986-05-0606 May 1986 Advises That Js Tulenko Made Permanent Chairman of Nuclear Engineering Sciences Dept on 860505 & Holds Level 1 Administrative Responsibility for Facility,Per Tech Spec Section 6.6.3,Paragraph 1 ML20197J7921986-04-17017 April 1986 Responds to Violations Noted in Insp Rept 50-083/86-01. Corrective Actions:Suppl to 50.59 Evaluation/Determination 85-17 Generated to Meet 10CFR50.59(b) Requirements.Full Compliance Will Be Achieved by 860615 ML20137V2881985-11-27027 November 1985 Forwards 1984-1985 Training Reactor Annual Progress Rept ML20132C6491985-09-0606 September 1985 Forwards Rev 9 to Physical Security Plan.Rev Removes Implication in Section 4.1 of SOP-F.1 Not Subj to 10CFR73.71.Change Labeled Technical Change Notice.Rev Withheld (Ref 10CFR2.790) ML20129J2061985-07-10010 July 1985 Forwards Rev 8 to Physical Security Plan,Reflecting Current Security Requirements & Implementation of Physical Security Plan.Rev Withheld (Ref 10CFR2.790) ML20098E5651984-09-25025 September 1984 Notifies of Complete Implementation on 840921 of Revised Emergency Plan Approved by NRC on 840604 ML20086M1521984-02-0101 February 1984 Forwards Proprietary Resubmission of Rev 7 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) ML20082H5541983-11-22022 November 1983 Forwards Rev 7 to Physical Security Plan.Rev Withheld ML20076M2581983-09-15015 September 1983 Forwards Public Version of Licensee Request for Addl 30-day Extension Until 831015 to Submit Amends to Emergency Plan ML20076L1221983-07-29029 July 1983 Requests 30-day Extension Until 830915 to Submit Revised Emergency Plan ML20072S5561983-03-31031 March 1983 Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) ML20072L3241983-02-28028 February 1983 Forwards Operator Requalification & Recertification Program Plan for Jul 1983 - June 1985 ML20028B8171982-11-30030 November 1982 Forwards Annual Progress Rept of Univ of Fl Training Reactor, Sept 1981-Aug 1982 ML20066A4451982-10-27027 October 1982 Forwards Proposed Changes to 14 Pages of Tech Specs Transmitted by Granting 20-yr License Renewal. Changes Correct Typographical & Nomenclature Errors & Will Have No Significant Negative Effect on Safe Operation ML20027E2761982-10-26026 October 1982 Forwards Public Version of Proposed Emergency Plan 1990-07-19
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20211B3531999-08-16016 August 1999 Accepts Ltr as Formal Notification That JW Powers Will No Longer Be Performing Licensed Activities for Facility ML20216D3041999-07-20020 July 1999 Submits Rept of Change in Facility Organization at Level 1 Which Is Level Responsible for Univ of Fl Training Reactor (Uftr) Facility Licenses,Charter & Site Administration ML20209C4971999-06-29029 June 1999 Forwards 14 Day Rept on Potential TS Violation Re Failure to Measure Adequately Secondary Flow Limiting Safety Sys Setting,Which Was Reported by 990608 & 10 Telcon ML20195H5101999-06-0808 June 1999 Documents 990608 Telcon Between T Michaels & J Wolf Re Potential Inadequacies in Checking Secondary Cooling Low Flow Trip.Event May Be Potentially Reportable Occurrence Per TS Sections 4.1 & 6.6.2 ML20195B3981999-05-17017 May 1999 Provides Rept of Significant Change in Facility Organization at Level 3 Which Is Level Responsible for day-to-day Operations of Univ of Fl Training Reactor ML20206U2431999-05-14014 May 1999 Forwards Rev 4 to Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan for July 1999 - June 2001. Changes,Discussed ML20205E4641999-03-29029 March 1999 Forwards Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel ML20207A6051999-02-19019 February 1999 Forwards Rev 11 to Uftr SAR, Dtd Jan 1981 Which Was Initiated as Result of Changes in Personnel Monitoring Badges Supplied to Univ by NVLAP-accredited Supplier.Rev 11 to EP for Uftr, Encl ML20236X2691998-08-0303 August 1998 Forwards Rev 2 to Univ of Fl Training Reactor Respiratory Protection Program, Reflecting Changes Necessitated by Updated Univ of Fl Respiratory Protection Program Along W/ Recommendations from NRC Info Notices 97-066 * 98-020 ML20217M6461998-03-27027 March 1998 Forwards Updated Proposal Intended to Meet Requirements of 10CFR50.64(c)(2).Proposal Is Essentially Unchanged Except for Revised Schedule & Presence of Substantive Info on Progress to Date Including Final Fuel Bundle Design ML20216B3501997-10-17017 October 1997 Forwards Pp Changes Which Constitute Rev 10 of Univ of Florida Training Reactor Emergency Plan.Rev 10 Consists of Set of Updates & Revs to 13 Listed Pages ML20211N0381997-10-0707 October 1997 Forwards Explanatory Ltr & Change Pages That Constitute Rev 14 of Univ of Fl Training Reactor Physical Security Plan. Encls Withheld,Per 10CFR2.790(d) ML20217H7881997-10-0606 October 1997 Forwards Corrected Page of Uftr Organizational Chart Submitted W/Amend 22 of Tss,Per 970903 Telcon.Encl Part of Chart Not Intended to Be Changed from Approved TSs ML20148G3321997-05-29029 May 1997 Forwards Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan, Jul 1997-June 1999 ML20138D8841997-04-21021 April 1997 Informs That Dj Cronin Resigned as Acting Reactor Manager on 970328 & Wg Vernetson Assumed That Position on Same Date ML20140C8631997-04-10010 April 1997 Forwards Rev 10 to Uftr Emergency Plan. Changes Contained in Plan,Discussed ML20137R5231997-04-0808 April 1997 Forwards Most Recent Proprietary Quarterly Log of Security Events for Univ of Fl Training Reactor R-56 License at Univ of Fl.Encl Withheld ML20137G6151997-03-27027 March 1997 Forwards Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel ML20137C1151997-03-17017 March 1997 Forwards Ltr of 1995-96 Univ of Fl Training Reactor Annual Progress Rept ML20137D6361997-03-17017 March 1997 Forwards Rev 10 to Univ of Fl Training Reactor SAR Dtd Jan 1981 Submitted as Part of Last Relicensing Effort.Rev Consists of Changes to Single Pp,Initiated as Result of Comments from Staff Member Checking Matls Re Training ML20140C7141997-03-17017 March 1997 Forwards Copy of 1995-96 Univ of Florida Training Reactor Annual Progress Rept in Compliance W/Requirements of Section 6.6.1 of Uftr TSs ML20140C7221997-02-28028 February 1997 Forwards One Copy of 1995-96 Univ of Florida Training Reactor Annual Progress Rept Per TS Reporting Requirements ML20137C1341997-02-28028 February 1997 Forwards 1995-96 Univ of Fl Training Reactor Annual Progress Rept ML20149M6731997-01-15015 January 1997 Discusses Potential TS Violation Re Improper Stack Monitor Calibr.Caused by Flawed Procedure That Failed to Correct for Delay of Cs-137 Calibr Source.Performed full-power Reactor Run on 970114 & Found Monitor to Be Properly Calibr ML20128N2971996-10-0303 October 1996 Repts Significant Change in Campus Radiation Control Function That Interacts W/Level 1 Personnel in Order to Facilitate Communications W/Commission ML20117N3891996-09-0909 September 1996 Informs That D Simpkins Will No Longer Be Performing Licensed Activities for Facility ML20117K7881996-09-0404 September 1996 Submits Significant Change in Facility Organization at Level 3,responsible for day-to-day Operation of Uftr ML20116J5751996-08-0909 August 1996 Forwards Annual Progress Rept of Univ of Fl Training Reactor Sept 1994 - Aug 1995 ML20116A0671996-07-19019 July 1996 Submits Response to Violations Noted in Insp Rept 50-083/96-01.Corrective Actions:Facility Administrative Staff Logged Many H in Late June & Early Jul to Generate & Submit First of Two Repts ML20113C9341996-06-21021 June 1996 Provides Explanatory Ltr & Change Pages That Constitute Rev 13 for Univ of Florida Training Reactor Physical Security Plan.W/O Encl ML20101L3451996-03-27027 March 1996 Forwards Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel. Proprietary Info Withheld ML20094D0931995-10-27027 October 1995 Forwards Rev 12 to Physical Security Plan.Second Page Submitted to Assure Complete Current Copy of Univ of Fl Training Reactor.Rev Withheld ML20092G0931995-09-14014 September 1995 Forwards Rev 9 to FSAR for Univ of Fl Training Reactor ML20086M7661995-07-18018 July 1995 Forwards Rev 12 of Physical Security Plan for Univ of Florida Training Reactor Per 10CFR50.54.Encl Withheld ML20086P9401995-07-11011 July 1995 Expresses Opinion That 10CFR20.1601(c) Can Readily Relieve Any Burden on License R-56 Operations,In Response to NRC 950605 Request for Input on Burden Associated W/Controlling Radiation Beams at Facility ML20086D3941995-06-12012 June 1995 Informs That E Mcalpine Relative to Failure of Primary Coolant Flow Line Return Sensor Discovered on 950609,per 950612 Telcon ML20084L8871995-05-31031 May 1995 Forwards Revised Plan Re Operator Requalification & Recertification Program for Jul 1995 Through June 1997 ML20083P3771995-05-11011 May 1995 Forwards Rev 8 Pages 5-9 & 9-7 for Univ of Fl Training Reactor (Uftr) SAR Dtd Jan 1991,consisting of Changes in Schematics Describing Uftr Secondary Water Cooling Sys to Reflect Mods That Have Been Implemented ML20081L9371995-03-27027 March 1995 Forwards Updated Proposal Intended to Meet Requirements of 10CFR50.64(c)(2),outlining How Licensee Intends to Include DOE Funding Certification for First Phase of Project ML20081J6851995-03-14014 March 1995 Advises That Univ Has Concluded That Leakage of Primary Coolant Heat Exchanger Potential Abnormal Occurrence & Potentially Reportable Per TS Section 6.6.2 ML20080F7391995-01-20020 January 1995 Forwards Rev 9 to Univ of Fl Training Reactor Emergency Plan. Changes Considered Relatively Minor in Nature,Result of Reviews of Plan & Response to Simulated Emergencies Following Emergency Drills ML20072R3891994-08-31031 August 1994 Responds to Violations Noted in Insp Rept 50-083/94-01. Licensees Currently Receiving Comments & Corrections on Draft Program ML20029D9321994-05-0606 May 1994 Responds to Violation Noted in Insp Rept 50-083/94-01. Corrective Action:Written Statement Issued to Potential Respiratory Users Re Leaving Area at Any Time for Relief While Engaged in Activities of Respiratory Program ML20065B8061994-03-28028 March 1994 Forwards Updated Proposal to Meet Requirements of 10CFR50.64(c)(2) for Updating Scheduling of Univ of Fl Training Reactor Conversion from HEU to LEU Fuel ML20057E8931993-09-30030 September 1993 Forwards Rev 11 of Psp,Section 11,Page 11-1.Rev Allows Authorized Individuals Granted Unescorted Access to Security Area to Leave Badges in Controlled Access Area W/O Wearing Badges During Normal Working Hours.Encl Withheld ML20056G5751993-08-0202 August 1993 Forwards Rev 8 to Univ of Fl Training Reactor Emergency Plan, Consisting of Updates & Minor Revs to Listed Pages. Floor Plan Updated to Reflect New Room Numbers & Ofc Setup ML20046B7521993-07-30030 July 1993 Informs of Change in Facility Organization at Level 3 ML20198H3881993-07-0707 July 1993 Forwards Proprietary Log of Security Events for Univ of Fl Training Reactor R-56 License at Univ of Fl.Encl Withheld ML20044G8331993-05-28028 May 1993 Forwards Revised, Operator Requalification & Recertification Training Program Plan of Univ of Florida Training Reactor Jul 1993 Through June 1995. ML20125E0171992-12-10010 December 1992 Forwards Rev 8 to Emergency Plan, Consisting of Set of Updates & Minor Revs to Pages to Include ii,v,1-5,Chapter 3, (Pages 3-1 Through 3-8),5-2,8-2,8-3 & 10-6 1999-08-16
[Table view] |
Text
.
NUCLEAR ENGINEERING SCIENCES DEPARTMENT Nuclear Reactor Facility University of Florido
- m.S.Vemof oon, Dvoctor NUCHAR REACTOR 80lLhNG .
Goinevlie,Florido 32411 *
,g.
n.a. poo m.u29. Toe smo May 6, 1988 United States Nuclear Regulatory Commission Atta: Document Control Desk Washington, D.C. 20555 Re: Reply to Notice of Violation Inspection Report No. 50-83/88-01
Dear Sir :
This report is divided into two parts to address the two violations cited in Inspection Report No. 50-83/88-01.
A. Inspection Report No. 50-83/88-01 cites the UFIR f acility with a Severity Level IV violation for failure to conduct adequate surveys to evaluate the extent of radiation hazards present in liquid and gaseous effluents released from the facility in two cases as quoted here:
- 1. For measurements of Ar-41 in gaseous effluents, the gamma spectro-scopy detection system was calibrated using a 1,000 cubic centimeter (cc) matrix calibration standard and sample concentration results were calculated for a 1.000 cc sample volume. The actual volume of the sample container utilized to measure concentrations in Ar-41 gaseous effluents was 1,250 cc.
- 2. The lower limit of detection for liquid waste tank effluent analy-ses, 1.08 E-7 microcuries per milliliter (pCi/ml), was greater then 25% of the concentration (4.0 E-7 pCi/ml) allowed for release to the sanitary sewer and the individual isotopes present in the effluent were not identified as required by Technical Specifications.
la. Adminsion or Denial of the Violation
- 1) For the Ar-41 measurements, the statement of violation repeated above is admitted; however, this methodology has been con-sidered conservative.
- 2) For the failure to identify individual isotopes present in the liquid effluent, the statement of violation is also admitted, though no credit for dilution is taken for the radioactivity level in the liquid effluent.
Ems omevevermcrw Ac+en twve,.e \ (
,8805130010.880506 .
PDR
,ri ADOCK 05000083
.- re n ..
i, -
m
.s U.S. Nuclear Regulatory Commission '
May 6, 1988 Page Two Ib. Reasons for the Violation li' The . reason for the violation on Ar-41 measurements is the be-lief that the methodology in use was conservative, though ad-mittedly not as accurate as possible. The methodology had been reviewed independently by an Environmental Engineering Profes-sor; though he had documented his walk-through review of the Argon-41 measurement considering the procedure adequate, he did not document any consideration of whether the measurement is conservative.
- 2) The reason for the violation involving failure'to identify in-dividual isotopes in the liquid effluent is that releases are usually less than 5-10 per cent or.less of allowed release con-centrations. Such a concentration was probably applicable on the one 1986-1987 release for which we are cited. The 1.08E-7 pCi/ml value is the lower limit of detection, not an actual quantified release concentration. The only reason for the quoted 1.08E-7 pCi/ml level in the effluent is that the count time for the sample was shortened representing an increase in the lower limit of detection to the point where the LLD was greater than 25% of the allowable release concentration. As a result there was an oversight for the monitoring requirement for specifying individual isotopes for inclusion in the Annual Report per Paragraph 6.6. l(5) of the UFTR Technical Specifica-tions.
Ic. Corrective Steps Taken/Results Achieved
- 1) The next scheduled Argon-41 measurement will not be performed until we have documented analysis to assure the conservatism of the present methodology or obtained a calibration source tYat more closely models the 1250 cc sample containers and performed an appropriate evaluation for its use.
- 2) No f urther liquid releases have been made since the t'RC inspec-tion on March 14-17, 1988. When releases are next made samples will be counted sufficiently to assure the activity level is below 25% of that allowed or the contributing individual iso-topes will be identified. It is worth noting : hat two liquid wastereleasesin,geptember, 1987 and another in January, 1988 average 2.96 x 10 pCi/mi which is only about 7.4% of the al-lowable concentration. All three have been well below the 25%
cutoff for requiring identification of individual nuclides.
U.S. Nuclear Regulatory Commission May 6, 1988 Page Three Id. Corrective Steps to be Taken to Avoid Further Violations
- 1) The Argon-41 methodology is being reviewed as part of a student project under the direction of the Director of Nuclear Facili-ties.'In addition, a new calibration source at 1250 cc is being ordered and should be available for the next Argon-41 measure-ment due in June, 1988 and required by August, 1988.
- 2) The Radiation Control Technique procedure #21 used to control sampling and release of liquid effluents will be reviewed and approved by the Director of Nuclear Facilities and it will be revised to assure all changes to the technique are adequately reviewed prior to implementation bef ore any further releases are made from the holdup tanks. A revised version of Radiation Control Technique #21 is currently under review with approval expected by May 31, 1988.
le. Date When Full Compliance Will Be Achieved
- 1) Full compliance hcs effectively been achieved as of the NRC In-spection, in that certain evaluations of the current methodo-logy and/or acquisition of a new calibration source will be accomplished before the next Argon-41 measurement due in June, 1988 with a 2 month window allowed. The corrective steps to be taken to avoid further violations in the monitoring of gaseous effluents per Section Id.1) above will be completed by August 31, 1988.
- 2) The corrective steps to be taken to avoid further violations in the monitoring of liquid effluent releases will be implemented fully by June 15, 1988.
B. Inspection Report No. 50-83/88-01 cites the UFTR facility for a Severity Level IV violation for f ailure to f ollow Technical Specification 6.3 re-quiring that the facility be operated in accordance with approved written procedures. All procedures and major revisions thereto shall be reviewed and approved by the Director of Nuclear Facilities before going into ef-feet. Contrary to the above, for the reporting period from September 1, 1986, to August 31, 1987, the licensee is cited for failure to have the Director of Nuclear Facilities approve the Radiation Control Technique procedures used to conduct environmental surveillances and effluent re-lease measurements required by Technical Specifications.
- a. Admission or Denial of the Violation The violation is admitted.
U.S. Nuclear Regulatory Commission May 6, 1988.
Page Four b.. Reason for the Violation The manual of Radiation Control Technique Procedures has been de-veloped by the Radiation Control Office to serve the entire Univer-sity of Florida campus. Some of the Techniques applicable to the UFTR have been in the manual for many years prior to the relicensing of the UFTR in 1982 when the procedures were required to be reviewed by the Director of Nuclear Facilities. As a result, they were grand-fathered in for the facility and occasionally updated (improved) by the Radiatior Control Office, sometimes based on input from the UFTR staff and management. However, because of the historical development of these Radiation Control Techniques, they were not formally docu-mented as reviewed by the Director of Nuclear Facilities. The fail-ure to do so is an oversight,
- c. Corrective Steps Taken to Date/Results Achieved All applicable Radiation Cont ol Techniques used on a frequent basis have been reviewed by the Director of Nuclear Facilities as of May 5, 1988 to assure no unreviewed Radiation Control Techniques pro-cedures are used to support operation of the UFTR facilities. This step is assuring that this violation will not recur.
, d. Corrective Steps to be Taken to Avoid Further Violations As a group all the Radiation Control Techniques used to support op-eration of the UFIR f acility are being reviewed by the Director of Nuclear Facilities and current copies will then be maintained in a separate notebook at the UFTR facility with a cover page documenting a dated review by the Director of Nuclear Facilities. In addition, a memorandum of understanding is being generated between the Radiation Control Office and the Director of Nuclear Facilities to assure changes to these Techniques are reviewed by the Director of Nuclear Facilities prior to implementation to support UFTR operations.
- e. Date of Full Compliance Compliance has been achieved via the interim measure noted in Para-graph (c) as of May 5, 1988. Full compliance with documented review of all applicable Radiation Control Techniques maintained in a sepa-rate notebook will be achieved by July 31, 1988.
U.S. Nuclear Regulatory Commission May 6, 1988 Page Ffvi We trust this response satisfies the requirements delineated in Inspection Re-port No. 50-83/88-01. If there are further questions, please advise.
Sincerely, t William G. Vernetson Director of Nuclear Facilities WGV/ps cc: NRC Region II Regional Administrator P.M. Whaley '
J.S. Tulenko Reactor Safety Review Subcommittee (RSRS) a w Y W -v NotarhPublic i
a lkn k V' Date
(, lTVY
- .w k a we, or n-,u. :
lay 'tmism frpism 4, UM wae r6. r,,, s m., %
t a ?
)
h f
f i
i f