Responds to Noncompliance Noted in Insp Rept 50-255/85-30. Corrective Actions:Circumstances of Violation Reviewed & Guidelines for Failure of 0.6 La Tech Spec Limit Will Be Added to Surveillance Procedure
ML20153H411
Person / Time
Site: Palisades 
Issue date: 02/17/1986
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8603030076
Download: ML20153H411 (2)


Text

.

Md COR8um8f5 Power x

,v Company

~~

Nuclear Lkensing General offces: 1945 West Parnall Road, Jackson. MI 49201 e (5th 7881636 February 17, 1986 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 4

799 Roosevelt Road 2

Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

RESPONSE TO IE INSPECTION REPORT 85-030 One item of noncompliance was identified in Inspection Report 85-030 dated January 16, 1986. The following is our response to that item:

NONCOMPLIANCE (50-255/85-030-01) 10CFR50.72(b)(2)(1) requires reporting within four hours, an event discovered during plant shutdown conditions, which had it been found during reactor operation, would have constituted serious degradation of principal safety barriers.

Technical Specification 4.5.2 requires containment local leak rates to be less than 0.6L (65,200 seem).

Contrary to the above, testing performed on December 4, 1985, determiaed that the local leak rate for a containment penetration (78,913 secm) exceeded 0.60L,, December 16, 1985.

DISCUSSION:

A review was performed of the circumstances related to this violation. As a result of this review, we have determined that additional information should be provided for this event.

In general, local leak rate tearing requires a unique method of administration with respect to the evaluation of test results. Typically, the necessary analysis and accumulation of individual test results is of sufficient complexity that a specific engineer must be assigned these responsibilities.

As a result, this engineer must also determine the point at which an allowable leakage limit is exceeded.

0603030076 860217 OC0286-0024-NLO2 PDR ADOCK 05000255 0

PDR FEB 19 586 MW \\\\b

i James G Keppler, Administrator 2

"* Palisades Plant Response to IE Inspection Report 85-030 February 17, 1986 Testing performed on December 4, 1985, determined a leak rate that exceeded the guideline values specified in the test procedure.

Excecding these guideline values indicated that a potential problem existed, but without further data reduction, the actual leakage could not be determined.

As a result of the high leak rate, the need for containment integrity was evaluated and determined to be unnecessary. The completed test was subsequently assigned to the appropriate engineer for further evaluation.

On December 16, 1985, the responsible engineer determined that the test results exceeded the allowable leakage limit.

As a result of our evaluation of this occurrence, we have determined that a period of time is necessary to allow for an accurate assessment of the results of leak rate tests by the assigned engineer. We also understand the requirement of 10CFR50.72(b)(2)(1) regarding reporting within four hours, an event discovered during plant shutdown conditions, which, had it been found during reactor operation, would have constituted serious degradation of principal safety barriers. Therefore, we have determined that guidelines that represent a 1

potential for failure of the 0.6L Technical Specification limit should be added to the surveillance procedu$e. Upon exceeding this guideline, the Shift Supervisor will be required to make a telephone report to the NRC ensuring full compliance with the requirements of 10CFR50.72(b)(2)(1).

I CORRECTIVE ACTION TO EE TAKEN TO AVOID FURTHER NONCOMPLIANCE Guidelines, that represent a potential for failure of the 0.6L Technical Specification limit, will be added to the surveillance proceduEe.

In conjunction with these guidelines, a requirement will be added to the surveillance procedure to complete the immediate notification requirements of 10CFR50.72.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance will be achieved by August 1, 1986.

1 i,

i Kenneth W Berry 4

Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades i

OC0286-0024-NLO2