ML20153H217
| ML20153H217 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/25/1998 |
| From: | Kozak T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20153H221 | List: |
| References | |
| 50-440-98-16, NUDOCS 9809300353 | |
| Download: ML20153H217 (2) | |
See also: IR 05000440/1998016
Text
._
__
.-
-
.-
.
- - - _ -
.
= .
September 25, 1998
Mr. Lew W. Myers
Vice President - Nuclear
Centerior Service Company
P. O. Box 97, A200
Perry, OH 44081
SUBJECT:
PERRY INSPECTION REPORT 50-440/98016(DRP)
Dear Mr. Myers:
On September 8,1998, the NRC completed a routine safety inspection at your Perry Nuclear
Power Plant. The enclosed report presents the results of that inspection.
During this inspection period, the conduct of activities at the Perry facility was characterized by
conservative operations. The on-shift operating crews responded well to plant transitents and
equipment malfunctions. There was good coordination between operations and engineering
department personnelin the resolution of questionable surveillance data on the hydrogen
recombiners.
No violations of NRC requirements were identified during the course of this inspection.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosure will be placed in the NRC Public Document Room.
Sincerely,
Original signed by
Thomas J. Kozak, Chief
Reactor Projects Branch 4
Docket No.: 50-440
License No.: NPF-58
f
Enclosure:
Inspection Report 50-440/98016(DRP)
}
See Attached Distribution:
DOCUMENT NAME: PER98016.DRP
To receive a c@y of this @cument, indicate in the tem *C" = C@y without attach /enel T* = C@y with attach /encI
- N* = No c@y
OFFICE
Rlli
5
Rlli
Rill
Rlll
NAME
Kozak/ml b
DATE
09M/98
OFFICIAL RECORD COPY
i
'
9809300353 980925
ADOCK 05000440
0
1
.
_ . _ _ _ .
. . . . . . . . ~ . _ _ _ _ _ . _ . _ . _ . _ _ __.. _ . _ _ __ _
.
!.( (
L Myers
-2-
!-
cc w/ encl:
H. Hegrat, Manager, Regulatory Affairs
, T. Rausch, Director, Quality and
Personnel Development
,
R. Schrauder, Director, Nuclear
l-
Engineering Department
W. Kanda, General Manager
Nuclear Power Plant Department -
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
Nuclear Services Department
i
l
Ohio State Liaison Officer
R. Owen, Ohio Department of Health
C. Glazer, State of Ohio Public
Utilities Commission -
l
- Distribution:
L
Project Mgr., NRR w/enci
j'
J. Caldwell, Rlli w/enci
'
C. Pederson, Rill w/enct
1
B. Clayton, Rill w/enci
j.
SRI Perry w/enci
'
DRP w/enci
TSS w/ enc!
DRS (2) w/enct ~
Rlli PRR w/enci
PUBLIC IE-01 w/encI
1
l-
Docket File w/enci
GREENS
1
IEO (E-Mail)
DOCDESK (E-Mail)
i
i)
0
j
r
!
4
4
j
j'
I
,
r
!
!.
!^
--
.