G e r
o P \\. ss areau m.,m e.
CR:trcf49[d..,g M
ggt 6 Csod My@v May 6, 1988 Mr. Tom Conlon c/o U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W., Suite 2900 Atlanta, GA 30323 Mr. Conlon:
We are submitting these procedures in advance of your inspection.
If we can be of further assistance please do not hesitate to contact us.
N F C.R.
utchinson es cc:
A. B. Ruff 8805110311 880506 PDR ADOCK 05000416 Q
DCD P O ECx 7fe l caArocw rwas swcta KIIT Gn.<f( MSS $5,m 37SO l (K1) 437 Rs m-s ~ m.
>s w ~ wa.s-+ou na
r-Procedures Sent in Advance to NRC a
Procedure Numbers Title 1.
NPE AP 01-302 Review of Supplier Documents 2.
NPE AP 01-502 Q-List Control 3.
NPE AP 701 OAS Document Evaluations 4
01-S-05-4 Control of Technical Manuals 5.
01-S-06-26 Post-Trip' Analysis 6.
01-S-07-1 Control of Work on Plant Equipment and Facility 7.
01-S-07-14 Control and Use of the GGNS Equipment Index 8.
01-S-09-1 Procurement of Materials and Services 9.
03-1-01-1 Cold Shutdown to Generator Carrying Minimum Load 10.
03-1-01-4 Scram Recovery 11.
07-S-53-C11-21 Backup Scram Valve A Functional Test 12.
07-S-53-Cll-22 Backup Scram Valve B Functional Test t
I t
l FCOM PROCEDURES TO NRC
-. -