Forwards Estimate of Need for Operator Licensing Exams for FY89-92,per Generic Ltr 88-13 & Request for Requalification Schedule
ML20153F653
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/01/1988
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-88-13, NUDOCS 8809070388
Download: ML20153F653 (3)


Text

_ _ _ - - _-__ _ _ _ _ _ _.

Mabama Pmt Comparty 600 North inh Street

-[

Post Offce Box 2641 Birmingham.Mabama 3529144C0 i

Telephone 2052541837 W. G. Helfston, HI Senior Vice President Nuclear Operations ggg g.g September 01, 1988 th*Souhan *ectrc

  • m l

i

{

l i

Docket Nos. 50-34" t

50-364 I

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D. C.

20555 I

Gentlemen:

i Joseph M. Farley Nuclear Plant - Units 1 and 2 l

Operator Licensing Examinations (Generic Letter 88-13)

By letter of August 8, 1988, the U. S. Nuclear Regulatory Commission

{

requested Alabama Power Company's best estimate of its need for operator l

licensing examinations for fiscal years 1989 through 1992.

In addition.

requalification schedules for the same periods vere requested.

l Enclosures 1 and 2 to this letter provide the requested information.

t Respectfully submitted, Y.

1 V. G. Hairston, III VGH,III/JARidst-V8.32

}

i f

Enclosures l

1 I

+

cci Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. G. F. Maxwell J

Mr. J. Hannon

(

)

l

,03 9809070383 300901 i

PDR ADOCK 0$000348 I

V PNU 3

j

i OPERATOR LICENSING EXAMINATION SCHEDULE Facility Farley NRC Region II FY 1989 FY 1990 FY 1991 FY 1992 1.

Date 11-14-88 05-28-90 03-25-91 01-27-92 (HLC-15)

(HLC-17)

( HLC-18)

(HLC-19) tRO 3

0 6

0

  1. SRO 4

5 7

4

  1. SRO Upgrade 0

1 2

2

  1. SR0 Limited 0

0 0

0 2.

Date 09-18-89 (HLC-16)

  1. RO 4

ISRO 7

ISRO Upgrade 2

ISRO Limited 0

Please indicate cold license examinations by placing an asterisk (*) by the date. Please indicate examinations intended to extend an Operator's license to a second or subsequer.t unit with two asterisks (**) (e.g., Unit one is in operation and Unit Two is approaching fuel load and three RO candidates with no previous license are to be examined on both Units one and Two and five R0 candidates licensed on Unit One are to be examined to extend their licenses to Unit Tvo, then indicate "R03, 5**").

{

.w c

=

REQUALIFICATION EXAMINATION SCHEDULE Facility Farley tiRC Region II FY 1989 FY 1990 FY 1991*

FY 1992*

1.

Date 05-25-89 Date 05-28-90 Date 05-27-91 Date 05-25-92 2.

Date 06-05-29 Date 06-04-90 Date 06-03-91 Date 06-01-92 3.

Date 06-12-89 Date 06-11-90 Date 06-10-91 Date 06-08-92 4.

Date 06-19-89 Date 06-18-90 Date 06-17-91 Date 06-15-92 5.

Dats 06-26-89 Date 06-25-90 Date 06-24-91 Date 06-22-92

  • Six crev rotation to be implemented, schedule may change.