ML20153F461
| ML20153F461 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 09/22/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20153F467 | List: |
| References | |
| 50-254-98-13, 50-265-98-13, NUDOCS 9809290136 | |
| Download: ML20153F461 (3) | |
See also: IR 05000254/1998013
Text
~
.
-
.
.-
~ . . - . .
.-. . . . - . ,
~ .
. . . - - _ _ . . . - _ . . . . . . ..
,
..-v
.
J'[.
"8f0
'?
~
9
uMTED STATES
l
\\
= NUCLEAR REGULATORY COMMIStlON
8
,
t
"{
.
. REGION iil
m
801 WARRENVILLE ROAD
LISLE. ILLINOIS 60532-4351
- ,
September 22, 1998
'
-
Mr; Oliver D. Kingsley
-l
President, Nuclear Generation Group
- j
~ Commonwealth Edison Company.
.
- ATTN: Regulatory Services
,
~ Executive Towers West lll
J
1400 Opus Place,3uite 500
Downers Grove, IL 60515
1
SUBJECT:
QUAD CITIES INSPECTION REPORT 50-254/98013(DRP);.
50-265/98013(DRP)
+
- Dear Mr. Kingsley:
This refers to the inspection conducted July 16 through September 1,1998, at the Quad Cities
.,
Nuclear Power Station. The purpose of the inspection was to determine whether activities
j
- authorized by the license were conducted safely and in accordance with NRC requirements.
,
The NRC conducted routine resident inspections in this period. Based on the inspectors *
. findings, overall operations at the Quad Cities station were conducted in a safe manner. At the
.
conclusion of the inspection, the findings were discussed with those members of your staff
1
"
identified in the enclosed report.
I
.
.
i
While many maintenance activities observed were performed well and the maintenance
- .
backlog was reduced by about 200 work requests, several maintenance errors occurred which
4
,
affected equipment performance.- One error involved improper use of a circuit board in a
-
- transmitter for the reactor protective system. The error resulted in the transmitter being
Inoperable for 18 days. Other maintenance problems resulted in scheduled work not being
-
performed on time and led to additional effort by operations, maintenance, and radiation
'
' protection personnel to complete the scheduled work.' Efforts to improve schedule adherence
'n
and material condition were underway at the end of the inspection period, but there was room
for significant progress in these areas.
.
One additional problem with operators mispositioning valves occurred this period, but did not
. jeopardize equipment performanca. In both the' maintenance and operation errors,
>
configuration control probicms were a factor. Additionally, independent verification or second
'
checks failed to correct the initial problems.
4 .
-l
,
l
9809290136 980922 "
gDR
ADOCK 05000254
l
,
I
)
_ _ .
- - _
_
..
_.
_.. .._._. _ ___ _ _ __
_
._
, _ . _ _ _ _ _
.-
i
{
~ O. Kingsley
-2-
-
.
l
'
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
'
Sincerely,
Original signed by
M. Dapas for
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos.: 50-254;50-265
'
Enclosure:
Inspection Report 50-254/98013(DRP);
,
'
50-265/98013(DRP)
cc w/ encl:
M. Wallace, Senior Vice President
D. Helwig, Senior Vice President -
,
t
G. Stanley, PWR Vice President ~
J. Perry, BWR Vice President
D. Farrar, Regulatory Services Manager
1. Johnson, Licensing Director
DCD - Licensing
J. Dimmette, Jr., Site Vice President
W. Pearce, Quad Cities Station Manager
~ C. Peterson, Regulatory Affairs Manager
R. Hubbard
N. Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
W. Leech, Manager of Nuclear
MidAmerican Energy Company
4
.
j
. DOCUMENT NAME: G:\\ QUAD \\QUA98013.DRP
'
"o resolve a conv of thle document. !"in the t u *C* a Copy without att chm W/W.9 T = Copy with atti ohment/enolosure"N" = No mov
OFFICE
Rlli
_
lE Rlli
_
6. Rlli
lh
NAME
Lerch/mVAffd1,
Rin5 R
Grant M W
DATE
09h&98
l
09Af/98
092liF98'
~ OFFICIAL RECORD COPY
-. . - .
-
.
,.
.,
.
. . . - . . . ~ . . . . . .
.. . . - - - .- . -
.
-_ ,...
,i # '
,. 5 f , ', +
lQ:
,
,
.,;
- , -
.
' O.' Kingsley -
-3-
q
Distribution-
' SAR (E-Mail) L
,
Project Mgr., NRR w/enci '
'
. J. Caldwell, Rlli w/enci
C. Pederson, Rill w/end
. B. Clayton, Rlli w/enci
SRI Quad Cities w/enci
'
DRP w/enci
TSS w/enci
DRS (2) w/enci
Rill PRR w/enci .
'j
PUBLIC IE-01 w/encle
.
Docket File w/enci
,
GREENS-
IEO (E-Mall)
l
DOCDESK (E-Mail)
l
i
u
Br 00'l7
.
,
.
,,
e
.n--
-
e
. - - - . ,
e
r-
~
--
-