COOPER NUCLEAR STATION Nebraska Public Power District
" *
- na" 23MI,*".^A*^ "
w CNSS886093 May 3, 1988_
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Reference:
Letter from W. O. Long to G. A. Trevors, dated April 6, 1988, "Cooper Nuclear Station, Changes to ISI Plan".
Subject:
Inservice Inspection Program Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 Gentlemen:
Revised pages of the Cooper Nuclear Station Inservice Inspection (ISI) Program are attached per the request in the reference. The attachment contains the-addendum to the ISI Program which was promulgated in May 1987.
Previous program addenda have been submitted in District letters dated January 17, 1986, and April 7, 1986. A summary of the changes contained in the addendum is also attached. Most changes resulted from the Recirculation Pipe replacement project at Cooper Nuclear Station and other piping modifications such as the RHR Head Spray Removal.
The District will forward future revisions of the ISI plan to the staff as they are incorporated.
f W
Trevors Division Manager of Nuclear Support GAT:GRS:sg Attachment cc:
U.S. Nuclear Regulatory Commission Regional Office, Region IV DN NRC Resident Inspector Cooper Nuclear Station I