N Nebraska Public Power District Nebraska's Energy Leader NLS980136 September 24,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
Subject:
Withdrawal of Proposed Changes CNS Technical Specifications Cooper Nuclear Station, NRC Docket 50-298, DPR-46
Reference:
- 1) Letter from G. R. Horn to USNRC, dated April 9,1998," Proposed Change to CNS Technical Specifications Neutron Monitoring (NM), Flow Biased Rod Block Monitor"
- 2) Letter from J. IL Swailes to USNRC, dated April 15,1998," Proposed Change to CNS Technical Specifications, Neutron Monitoring (NM) Neutron Detectors"
- 3) Letter from USNRC to G. R. Horn, dated July 31,1998," Conversion to
/
Improved Technical Specifications for the Cooper Nuclear Station" j
In References 1 and 2, the Nebraska Public Power District (the District) submitted requests for amendments to License DPR-46 to change the Cooper Nuclear Station (CNS) Technical Specifications. The proposed changes would have: 1) deleted the maximum of s 108% of rated d7))'[
power for the Average Power Range Monitors (APRM) Rod Block Trip Setting in Technical Specification Sections 2.1.A.l.d and 3.2.C: and 2) exempted the neutron detectors from the channel calibration requirement described in Technical Specification Table 4.2.C. These changes are no longer necessary since CNS has received approval for, (Reference 3), and has implemented the Improved Technical Specifications (ITS). ITS already incorporates the exemption for the neutron detectors. The maximum of s 108% of rated power requirement for the APRM Rod Block Trip Setting was relocated with ITS to the Technical Requirements Manual (TRM). CNS will perform a safety evaluation, in conformance with 10CFR50.59, to justify the deletion of this requirement from the TRM.
,qpg Cooper Nudear Station U*
s'-
PO. Box 98/ Brownville. NE 68321DO98 Telephone: (402) 825-38H / Far (402) 825-S2n
- ~ " * '"
9809280287 980924 PDR ADOCK 05000298, P
PDR,
_ ~ -
NLS980136 Page 2 of'3 The District therefore withdraws these proposed Technical Specifications changes since they are no longer required due to the implementation ofITS.
By copy of this letter the appropriate State of Nebraska official is being notified in accordance with 10 CFR 50.91 (b)(1). Copies to the NRC Region IV office and the CNS Resident inspector are also being provided in accordance with 10 CFR 50.4 (b) (2).
Should you have any questions or require any additional information regarding this submittal, please contact Bradford Houston at (402) 825-5819.
l l
Sincer l
i M. F. Peckham Acting Vice President of Nuclear Energy
/dm l
cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 1
Senior Resident Inspector l
USNRC Environmental Health Division - Program Manager Nebraska Department of Health l
NPG Distribution i
I l
=
j NLS980136 Septembe'r 24,1998 Page 3 of 3 1
STATE OF NEBRASKA
)
)
NEMAHA COUNTY
)
M. F. Peckham, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledge and belief.
b/
e M. F. Peckham Subscribed in.my presence and sworn to before me this 8 day of SephW,1998.
seeWL moaRY-8tse of Netraska Wr Comm. he.
11.2002 NOTARY PUBLIC
l ATTACHMENT 3 LIST OF NRC COMMITMENTS l
Correspondence No: NLS980136 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's l information and are not regulatory commitments.
Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory connitments.
COMMITTED DATE COMMITMENT OR OUTAGE Perform a 10CFR50.59 safety evaluation to justify deleting the maximum of s 108% of rated power requirement None for the APRM Rod Block Trip from the Technical Requirements Manual l
PROCEDURE NUMBER 0.42 l
REVISION NUMBER 6 l
PAGE 9 OF 13 l
>