Amend 28 to License NPF-47,delaying Implementation of Neutron Flux Monitoring Sys Mods from Prior to Startup from Second Refueling Outage Until Refueling Outage Following NRC Issuance of Topical Rept NEDO-31558,Mar 1988
ML20153E726
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/29/1988
From: Calvo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20153E730 List:
References
NUDOCS 8809060401
Download: ML20153E726 (3)


Text

..peneouq jo UNITED STATES g

NUCLEAR REGULATORY COMMISSION c

i ej wAsMiNoToN. o. c. 20sss

/

GULF STATES UTILITIES COMPANY 00CkET NO. 50-458 0

RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE isendnent No. 28 License No. NPF-47 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Gulf States Utilities Company (thelicensee)datedMay 75, 1988 as supplemented July 6, 1988, complies with the standards and requirements of the Atceic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comission; T6 re is reasonable assurance:

(i) that the activities authorized C.

t b,

'his amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; 0,

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, th(c license is amended by changes to License Condition 2.C(14),. Item 3 of Facility Operating License No. NPF-47. Attachment 5 is hereby amended to read as follows:

llj90604o1 anon 29 p

ADOCK 05000450 PNU

\\

l i

ATTACHMENT 5 T0-hPF 47 i

EMERGENCY RESPONSE CAPABILITIES GSU shall complete the following requirements of NUREG-0737 Supplement No. I ei the schedule noted below:

1.

Actions and schedules for correcting all human engineering discrepancies (HEDs) identified in the "Detailed Control Room Design Review Summary Report" dated October 31, 1984 and Supplements dated May 14. June 12, 1985, and July 31, 1985, shall be implemented in accordance with the schedule comitted to by GSU in the sumary report and supplements and accepted by the NRC staff in Section 18.1 of SSER 3.

2.

Prior to startup followf T the first refueling outage GSU shall implement modificat.)ns (installation or upgrade) for those Htms listed below t..nsistent with the guidance of Regulatory Guide 1.97, Revision 2 unless prior approval of an alternate design of these items is granted by the NRC staff. These items as listed in GSU's letter of June 24, 1985 are:

a coolant level in the reactor; b

suppression pool water level; c

drywell atmosphere temperature; d

primary system safety relief valve position; e

standby liquid control syster storage tank level; f

emergency ventilation damper pcaition; and g

airborna radiohalogens and particulates.

3.

GSU shall implement modifications (installations or upgrade) for neutron flux monitoring consistent with the guidance of R6ulatory Guide 1.97, Revision 2 or the NRC Staff's Safety Evaluation Report of the BWR Owners Group Licensing Topical Report (NE00-31558, Position on NRC Regulatory Guide 1.97 Revision 3. Requirements for Post-Accident Neutron Monitoring System). Modifications, if required, shall be completed before restart from the next refueling outage starting after 10 months from the date of receipt of the NRC Staff Safety (valuation Report on NED0-31558, but no later than January 1, 1991 unless otherwise notified in writing by the NRC staff.

i

/cendment U, 28 i

~'

,r.

lo,

., t 3.

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY Co* MISSION D..&

Jose A. Calvo, Director Project Directorate - !Y Division of Reactor Projects - III, IV, V and Speitial Projects Office of Nuclear Reactor Regulation Date of Issuance: August 29, 1988