ML20153E527
| ML20153E527 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/29/1988 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20153E519 | List: |
| References | |
| NUDOCS 8809060341 | |
| Download: ML20153E527 (6) | |
Text
4
'/
UNITED STATES i
8 NUCLEAR REGULATORY COMMISSION o
5 WASHING TON, D. C. 20666 s.....j PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT. UNIT 1 DOCKET NO.50-27b AMENDMENT TO FACILITY OPERATING LICENSE Arendnient No.31 License No. DPR-80 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Pacific Gas & Electric Company i
(the licensee), dated October 29, 1986, as supplemented by letter dated July 5, 1988 complies with the standards and req)uirements of the Atenic Energy Act of 1954, as amended (the Act, and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of t1e Act, and the rules and regulations of the Comission; 1
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this ainendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations end all applicable requirements have been satisfied.
A ll 5809060341 000029 DR ADOCK 050 5
l i
?,
j 2.
Accordingly, the license is amended by changes to the Technical Specificati.ns as indicated in the attachment to this license amendinent, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 31, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment becomes effective at the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Sk I
George W. Knighton, Director Project Directorate V Division of Reactor Projects - !!!/IV/V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: August 29, 1988 i
I i
1 l
\\
- g&* ***09\\
UNITED $TATES 8
NUCLEAR REGULATORY COMMISSION N
WASHING TON, D. C. 20555 e
'. *g o....
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT. UNIT 2 DOCKET NO. 50-323 AMEN 0 MENT TO FACILITY OPERATING LICENSE i
Amendment No. 30 License No. DPR-8I
- l 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Pacific Gas & Electric Company (the licensee), dated October 29, 1986, as supplemented by letter dated July 5,1988 complies with th.e standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will o)erate in conformity with the application the provisions of tie Act, and the rules and regulation; of the Ccmission; C.
Thereisreasonableassurance(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health 4
and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendr,ent will not be inimical to the comon defense and security or to the health and safety of the public' and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
a J
I 1
1 1
0
i 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
(2) Yechnical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 30, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specif t license conditions.
3.
This license amendment becomes effective at the.. e of its issuance, t
8 FOR THE NUCLEA c'.1ULATORY COMillSSION
$.Y.
'deorge W. Knighton, Director
?roject Directorate V livision of Reactor Projects - III/IV/V nd Special Projects 4
Oft, e of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: August 29, 1988 i
l 3
j ATTACHMENT TO LICENSE AMENDMENT NOS,31 AND 30 FACILITY OPERATING LICENSE NO3. OPR-80 and DPR-82
, DOCKET NOS. 50-275 ANIi 50-323 j
j Replace the following pages of the Appendix "A" Technical Specifications with s
the attached page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
J Remove Pace I.nsert Page 3/4 6-19 3/4 6-19 l
1 l
1 1
1 I
l l
t 3
f i
a i
l i
l i
J I
i 1
___ = _ _ _
o E
TABLE 3.6-1 (Continued)
E o
n R
ISOLATION TIME g
VALVE NO.
FUNCTION (Seconds) 1.
Phase "A" Isolation Valves (Continued) g 93578 Accumulator Sample OC i 10 1
< 10 j
8112 RCP Seal Water Return IC ro
-< 10 2.
Phase "B" Isolation Valves
.A FCV-356 CCW Supply to RCP's and Support Coolers OC N.A.
l
[
FCV-357 RCP Thermal Barrier CCW Return OC N.A.
l FCV-363 RCP Oil Cooler / Support Cooler CCW Returr. OC N.A.
i FCV-749 RCP Oil Cooler / Support Cooler CCW Return IC N.A.
l FCV-750 RCP Thermal Barrier CCW Return IC N.A.
I 3.
Containment Ventilation Isolation Valves l
FCV-660N Containment Purge Supply IC i 2
)
FCV-661M Containment Purge Supply DC i 2 k
FCV-662 Containment Vacuum / Pressure Relief IC i 5 FCV-663 Containment Pressure Relief OC
$5 l
g FCV-664 Containment Vacuum Relief OC
< 5
~
g FCV-678 Containment Air Sample Supply IC
< 10 FCV-679 Containment Air Sample Supply OC
$ 10 U
FCV-681 Containment Air Sample Return OC
$ 10 k
RCV-11N Containment Purge Exhaust IC
_ 2 g
RCV-12W Containment Purge Exhaust OC
< 2
- - - - -