Responds to NRC Re Violations Noted in Insp Rept 50-334/85-25.Corrective Actions:Emergency Light Installed in Clean Shop to Provide Lighting for Access Pathway & Exemption Request Submitted for Use of Security Lighting
ML20153D901
Person / Time
Site: Beaver Valley
Issue date: 02/11/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8602240292
Download: ML20153D901 (3)


Text

--

s

'Af Telephone (412) 393-6000 Nuclear Group

$0ppYgp' ort, priso77. ooc 4 February 11, 1986 U. S. Nuclear Regulatory Commission q

Office of Inspection & Enforcement Attn: Mr. Stewart D. Ebneter, Director Division of Reactor Safety 631 Park Avenue King of Prussia, PA 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DRP-66 Inspection Report 85-25 Gentlemen:

In response to your letter of January 15, 1986, and in accordance with 10CFR2.201, the attached reply addresses the Notice of Violation which was included with the referenced report.

If you have any questions concerning this response, please contact my office.

Very truly yours, J. J. Carey Vice President Nuclear Group Attachment cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 One James River Plaza Dg224cp92860211 Richmond, VA 23261 g

ADOCK 05000334 PDR Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing-A q

Washington, DC 20555 l \\

w -

IB O \\

[i-J COMMONWEALTHOFPENNSYLVANIA)

) SS:

COUNTY OF BEAVER

)

On tMs efM,,

day of IN

,MM-before. me, //h /)). V/ diced,

a Notary Pub c in' and--for said Commonwealth and Gnunty, ~ personally appeared J.

J.yCarey, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing. Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.

$)h. l&W SHillA M. FATTORE, RougY PUSUC SHIPPilIGPORT 80A0, BlAVit C0ggry NY comesssiog IIPfets oci.23, asse lftrabst, Pennsylveek As*bh W 3%

~

DUQUESNE. LIGHT COMPANY Beaver Valley Power Station, Unit No. 1 Reply to-Notice of Violation Inspection 85-25 i

Letter dated January 15, 1986 VIOLATION'A (Severity Level IV; Supplement 1)

Description of Violation (85-25-04)

10CFRSC, Appendix R,Section III.J, requires that emergency lighting units-with at least an 8-hour battery. power supply shall be provided in all areas needed for operation of safe shutdown equipment and in access _and. egress routes thereto.

Contrary to the

above, as of November 22,
1985, the emergency.

lighting units with at least an 8-hour battery power supply were not provided in the following safe shutdown access and egress routes:

1.

Clean Shop (Fire Area SH-1) 2.

Stairway vestibule immediately outside the control Room in the Service Building.

3.

The corridor between the aforementioned stairway (item 2) and the Service Building roof, t

4.

The Service Building roof and the Yard Area between the Service Building and the Diesel Generator Building.

Corrective Steps Taken and Results Achieved An emergency light has been installed in the clean-shop to provide lighting for the access pathway.

An exemption request was submitted on January 21, 1986 requesting an exemption from Section III.J of 10CFR50, Appendix R to allow for the use of security perimeter lighting for areas identified in items 2, 3 and 4

above.

The exemption request provides justification to demonstrate that the security lighting capability provides an acceptable margin of safety equivalent to the requirements of Section III.J.

Corrective Steps Taken to Avoid Further Violations With the installation of an additional emergency light in the clean shop for Item 1 and the exemption request justifying equivalency to the requirements of Section III.J of Appendix R to 10CFR50 for items 2, 3 and'4, no further action is required.

Date When Full ~ Compliance Will Be Achieved Pending satisfactorf acceptance of the exemption request for emergency lighting capability, full compliance will be achieved.

. -~....- -