_ __-
s
+* f
- O R
UNITED $TATES y
NUCLEAR REGULATORY COMMISSION 7,
t W ASHING TON, D. C,20555 SAFEGUARDS EVALUATION REPORT MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION, UNITS ? AND 3 DOCKET NOS. 50-277 AND 50-278 1.0 Introduction The Philadelphia Electric Company (PECO) has filed with the Nuclear Regulatory Comission revisions to their Physical Security Plan for the Peach Bottom Atomic Power Station, Units 2 and 3.
This Safeguards Evaluation Report (SGER) summarizes how the licensee proposes to meet the Miscellaneous Amendments and Search Requirements revisions of 10 CFR Part 73.55.
Based on a review of the Physical Security Plan, the staff has concluded that revisions to 10 CFR 73.55 (y Miscellaneous Amendments and Search Requirements 51l the proposed changes satisf record reporting requirements. Accordingly, the protection provided will ensure
(
that the public health and safety will not be endangered.
2.0 Personnel Search 1
The licenses has provided comitments in the Physical Security Plan to provide a search of all individuals entering the protected area except bona fide Federal.
State and local law enforcement personnel on official duty, through the use of equipment designed for the detection of fireams, explosives, and incendiary devices.
In addition, the licensee has provided comitments to conduct a physical pat-down search of an individual whenever the licensee has cause to suspect that the individual is attempting to introduce fireams, explosives, or incendiary devices into the protected areas; or whenever firearms or explosives detection equipment is out of service or not operating satisfactorily.
3.0 Vital Area Access PECO has modified their Peach Bottom Atomic Power Station, Units 2 and 3 Physical Security Plan to limit unescorted access to vital areas during non-emergency conditions to individuals who require access in order to l
perform their duties. They have established current authorization access lists for each vital area which are updated and approved by the cognizant manager or supervisor at least once every 31 days.
PECO has assured that only individuals whose specific duties require access to vital areas during i
non-emergency conditions are included on their site access list.
PECO has t
g809020200000825 DR ADOCK 050 7
i
- (
2 provided further assurance by revoking access and retrieving badges and other entry devices prior to or simultaneously with notification of temination of an individual's unescorted facility access.
Based uion commitments made by the licensee in revisions to their Physical Security Plan,thestaffhasconcludedthatPECOmeetsthevitalareaaccessrequirements 4
of10CFR73.55(d)(7)(i)(A)(B)and(C).
4.0 Locks and Keys The licensee has comitted to providing methods to reduce the probability of compromise of keys, locks, combinations, and related access control devices used to control access to their* protected areas and vital areas. These methods include the rotation of keys, lo n s, combinations, and related access control devices every 12 months or the changira of these devices whenever there is evidence or suspicion that any key, lock, coraination or related access control device may have been coepromised or when an individual who has had access to any of these devices has had their access terminatad due to a lack of trustworthiness, reliability or inadequate work performance. Only persons granted unescorted facility access are issued such entry devices.
Based upon comitments made by the licensee in revisions to their Physical Security Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.55 (d)(9) to reduce the probability of compromiss of keys, locks, combinations, and related access control devices.
5.0 Emergency Access The licensee has provided comitments to provide for the rapid ingress and egress of individuals during emergency conditions or situations that could lead to
]
emergency conditions by assuring prompt access to vital equipment. An annual review of their physical security plans and contingency plans and procedures will be cond9cted to evaluate their potential impact on plant and personnel safety.
j Emergency access is granted by a licensed senior operator.
Based upon comitments made by the licensee in revistans to their Physical Security Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.55 (d)(7)(ii)(B) to assure access to vital equipment during emergencies or to situations that may lead to an emergency.
6.0 Protection of Secondary Power Supplies 4
The licensee has provided comitments to protect the on-site secondary power supply syWn for alarm annunciator equipment and non-portable comunications i
equipeent by including such equipment within a vital area boundary.
Based upon comitmerts n.ade by the licenses in revisions to their Physical Security Plan, the staff has concluded that PECO meets the requirements of 10 CFR 73.55(e) i f e protecting the secondary power supplies of alarm annunciator equipment and non-portable comunications equipment.
a l
. 7.0 Vital Area Entry / Exit ! ogging The licensee has committed to maintaining a log indicating name, badge number, time b5 d
of entry, and time of exit of all individuals granted access to a vital area except those individuals ente 'n3 or exiting the reactor control room.
Based upon connitments mace by the licensee in revisions to their Physical Security Plan, the staff has concludec 'Aat PECO meets the requirements of 10 CFR 73.70(d) by maintaining entry / exit log of individuals accessing vital areas (except the reactor control room).
8.0 Conclusion Based upon evaluation, we find that the lice, see has met the requirements of the Miscei
,s Amendments and Search Requirements revision to 10 CFR Part 73.55 and the iscord reporting requirements of 10 CFR Part 73.70.
Principal Contributor:
Robert Skelton, NRR Dated: August 25, 1988 l
l t
. _ _ _ _